Appeal 3314729
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
proposed adaptation for registered disabled persons with single storey ground floor extension on side for bedroom and shower room facilities.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The name of the appellant as given on the appeal form differs from that on the planning application form. However, it has been confirmed that the name stated on the appeal form is a family member progressing the appeal on behalf of the applicant. As the right of appeal rests with the original applicant then this is reflected in the heading above.
The description of development in the heading above has been taken from the planning application form. However, in [name] of the appeal form it is stated that the description of development has not changed but, nevertheless, a different wording has been entered. Neither of the main parties has provided written confirmation that a revised description of development has been agreed. Accordingly, I have used the one given on the original application.
Section 04
[name]
The main issues are the effect of the proposal on the living conditions of residents of the site in respect of amenity space, light and outlook, with due regard to the circumstances of the appellant.
Section 05
Reasons
The existing dwelling has 3 bedrooms, and the appeal proposal would result in a 4-bedroom dwelling. The Council’s Residential Amenity Supplementary Planning Document 2008 (SPD) recommends that houses of the size of the application site should have a minimum rear garden area of 100sqm. This is a reasonable requirement as it is important that family housing should have access to suitable private amenity space.
The Council’s officer report states that the proposal would reduce the size of the garden from approximately 82sqm to approximately 48sqm, which would be significantly below the minimum figure of the SPD.
The existing garden of the appeal site does not meet the recommended SPD area. The SPD is guidance rather than development plan policy, and a degree of flexibility can be used when applying the minimum figure. This is reflected in the size of gardens referred to by the appellant on developments elsewhere. The advice from the Council that the extension is reduced in size also reflects the advisory status of the SPD as a reduced extension would also result in an amenity area smaller than that recommended in the SPD.
However, even given the status of the SPD, the proposal would result in a very limited area of private amenity space for residents of this family dwelling. The remaining garden area would also be detrimentally affected by the degree of enclosure created by the garage within the site as well as a gable wall of a nearby dwelling located close to the boundary.
The appellant states that the reduced garden area would be sufficient for their family, but I am mindful that the extension would remain should the circumstances of the appellants family change or should the house be sold. Nearby public open green space would also not be a suitable alternative for the loss of private amenity space.
Based on what I have seen and read, the appeal proposal would result in an unacceptable reduction in private amenity space to the significant harm of the living conditions of existing and future residents of the dwelling.
My attention has been drawn to the personal circumstances of the appellant, who emphasises that the proposal would enable ongoing care as well as access to a toilet and washing facilities. The appellant currently has a bedroom on the first floor of the property, and based on the evidence before me this does not provide suitable access for care or to facilities, and the property cannot be adapted through measures such as a stair lift.
The appellant refers to the Council’s Social Services Department Guidelines for use when considering major adaptations for disabled people. However, the proposed bedroom would exceed the minimum floor area for a principal double bedroom as set out in those Guidelines. The appellant refers to a potential need for a live-in carer or for additional equipment such as a ceiling mounted hoist. But this does not demonstrate that the floor area stated in the Guidelines is unsuitable for those circumstances.
In considering this appeal I have had due regard to the Public Sector Equality Duty (PSED) contained in the Equality Act 2010 which sets out relevant protected characteristics, including disability. [name] am mindful of the needs of the appellant, it has not been demonstrated that the scale and design of the proposal is specific to their needs or that they cannot be met by a more acceptable scheme of a reduced size. The PSED considerations do not outweigh the significant harm that I have identified in respect of the reduction in external amenity area, and following careful consideration of these particular matters I am satisfied that the impact of dismissing this appeal is proportionate and justified.
The proposal would lead to the loss or enclosure of glazed double doors which serve a kitchen/diner, with a subsequent reduction in natural light reaching the room and a loss of the view of the garden. However, I am mindful that this would also be the case even if a smaller extension is built as suggested by the Council. Furthermore, a rooflight on the lobby of the proposal could serve the dining area, and there is also a kitchen window which would provide natural light for the room as a whole. Within that context, and given the circumstances of the appellant, I do not consider that the loss of light would be sufficient to warrant the refusal of planning permission.
The Council refers to the outlook and levels of light for the new bedroom. However, even given the proximity of garden walls and other enclosing features, I do not consider that the proposal would result in an unacceptably restricted outlook or inadequate levels of light for occupants of the room. The room would also be served by a rooflight which would increase levels of natural light in the room. These issues would also not be significantly different were a smaller extension to be provided as suggested by the Council.
Notwithstanding my conclusions in respect of light and outlook, I conclude that the proposal would lead to significant harm to the living conditions of existing and future residents in respect of private amenity space. I have had regard to the circumstances of the appellant, but it has not been demonstrated that an extension of the size proposed is required to meet their needs, and this matter does not therefore outweigh the harm I have identified. The proposal would therefore be contrary to the National Planning Policy Framework which seeks to achieve a high standard of amenity for existing and future users of development. The proposal would also be contrary to the advice of the SPD in respect of the provision of amenity space.
I find no conflict with Policy PS10 of the City of Leicester Local Plan 2006 as I have found no harm in respect of light and overshadowing, and this policy does not refer to the provision of amenity space. However, this does not negate my conclusions on the harm arising from the proposal.
I therefore conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 92No official casework-database value to compare
- Extracted decision date · page 1
- 1 September 2023Matches the official casework database
- Extracted site visit dates
- 15 August 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3314729
- Application reference
- 20221693
- Lead case reference
- Not recorded
- Planning authority
- Leicester City Council
- Planning authority code
- E06000016
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 35 m²
- Number of residences
- 1
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 14 January 2023
- Valid date
- 1 February 2023
- Start date
- 11 July 2023
- Planning authority decision date
- 1 November 2022
- Appeal decision date
- 1 September 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 37953
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21