Skip to main content
Official casework recordDismissedCurrent release

Appeal 3314802

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

demolition of existing rear extension, existing hipped roof to side elevation amended to gable end, proposed single storey rear extension with proposed upper storey dormer extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are the effect of the proposal on: • the character and appearance of the area; and • the living conditions of the occupiers of [address], with regard to outlook.

  3. Section 04

    Character and Appearance

    The appeal property forms part of a row of semi-detached bungalows. It is located within a residential street that is generally characterised by semi-detached bungalows and houses set back from the road behind front gardens and paved driveways. The properties generally have hipped roofs and several have extensions and alterations which mainly respect the original building form. The similar styles of properties and the regular separation and set back from the road results in a relatively spacious, consistent, and harmonious character and appearance.

    The proposal does not face a public highway, and while the dormer would be set down from the ridge line, and up from the front elevation with some separation from the side, it’s large scale and positioning across the existing roof and the proposed rear extension would dominate the scale and form of the original dwelling. The incongruous gable roof design would unbalance the pair of semis, and in doing so, draw the eye. It would not sit comfortably with the predominance of hipped roofs adjacent to it and would look harmfully out of place within the row of hipped roof bungalows on this side of [address]. Consequently, due to its siting and design the proposal would be a discordant feature that would detract from the otherwise harmonious character and appearance of the area.

    While HDG1 of the Householder Design Guide Supplementary Planning Document (2012) (SPD) does not explicitly state that changes in roof design from hip to gable are not acceptable, it is clearly set out that particular attention should be paid to the roof form to ensure that extensions respect the main dwelling and the locality. Moreover, the SPD advises that to ensure an extension is sympathetic to the original dwelling its roof should replicate the proportions, pitch and shape of the main house.

    Materials would match the existing white render and tiles of the original dwelling. However, owing to the bulky roof design and unconventional dormer extension projecting from the roof over the full depth of the ground floor extension, the use of hanging tiles would result in an unduly prominent development and it would stand out as being visually incongruous. The appellant asserts that appropriate window details, architectural features and boundary treatments can be achieved at the site in line with the guidance set out in HDG1 of the SPD, however the lack of harm on these matters would only be a neutral factor.

    I have considered the examples of bungalows in the wider area which have rear extensions and a gable roof design, including opposite the appeal site which the Council indicate is subject to an enforcement enquiry. The context of the examples differs in overall appearance and relationship with the street scene. They are on a different side of [address] or on a different street, and as such would not be seen with the appeal scheme and are not directly comparable. The other examples do not, therefore, lead me away from my above findings.

    Overall, the proposal would harm the character and appearance of the area, in conflict with Policy P10 of the [name] (Review 2019) (CS) and policies GP5 and BD6 of the Leeds Unitary Development Plan (Review 2006) (UDP). Amongst other things, these policies require development to provide good design that is appropriate to its location, scale and function, and extensions to respect the scale, form, detailing and materials of the original building.

    It would also be contrary to the guidance set out within HDG1 of the SPD, and contrary to the provisions of the National Planning Policy Framework (the Framework) in Section 12 regarding the need to achieve well designed places.

  4. Section 05

    Living Conditions

    It is not disputed that the proposal would be policy compliant with regard to daylight/sunlight levels and privacy. However, it would bring development close to the shared boundary with [address] and given the existing single storey extension at No 36, would result in a relatively narrow gap between the properties’ rear extensions. Given the height and depth of the proposal and proximity to the shared boundary, this would create an enclosing effect, to the detriment of the outlook experienced by the occupiers of No 36.

    Irrespective of whether the ‘45 degree’ and ‘12 metre’ codes set out in HDG2 of the SPD are applicable to the appeal scheme, the proposed extension and dormer would have the appearance of a two-storey extension, resulting in a noticeable difference in the built form which would appear as a dominant and oppressive feature. Even if the rear facing room at No 36 is not a habitable room, the proposal would be detrimental to the outlook that could reasonably be expected in a private garden. While there have been no objections from neighbouring occupiers to the scheme, this is not a reason, in itself, to allow harmful development.

    Accordingly, the proposal would be harmful to the living conditions of the occupiers of [address], with regard to outlook, in conflict with Policy P10 of the CS and Policy GP5 of the UDP. These policies include a requirement for development to be appropriate to its location and avoid a loss of amenity.

    It would be contrary to the guidance set out within HDG2 of the SPD in relation to development proposals protecting the amenity of neighbours. It is also contrary to the Framework at Section 12, which seeks places that have a high standard of amenity for existing and future users.

    The Council also allege a conflict with Policy BD6 of the UDP with regards to this matter. However, this policy relates to extensions and alterations being sympathetic to the existing building, and my attention has not been drawn to any words in this policy that are relevant to this main issue. The policy has therefore not been determinative in my decision.

  5. Section 06

    Other Matters

    The proposal would provide an immediate and urgent need for additional sleeping accommodation for the appellant’s growing family. This benefit is largely a private matter. Moreover, it has not been shown that the appeal scheme is the only way for the appellants to achieve this aim and as such carries limited weight in the determination of this appeal. While the appellant has expressed frustrations with the Council’s handing of the case, this has not affected my consideration of the planning merits of the scheme.

  6. Section 07

    Conclusion

    For the reasons given above, having considered the development plan as a whole, the approach in the Framework, and all other material considerations, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3895No official casework-database value to compare
    Extracted decision date · page 1
    15 May 2023Matches the official casework database
    Extracted site visit dates
    25 April 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3314802
Application reference
22/07249/FU
Lead case reference
Not recorded
Planning authority
Leeds City Council
Planning authority code
E08000035

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
16 January 2023
Valid date
18 January 2023
Start date
19 January 2023
Planning authority decision date
23 December 2022
Appeal decision date
15 May 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
32623
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21