Skip to main content
Official casework recordDismissedCurrent release

Appeal 3314871

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a POD room – loft conversion.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main issue

    The main issue is the effect of the proposed development on the character and appearance of the host building and the local area.

  3. Section 04

    Reasons

    The appeal property is a mainly 3-storey mid-terrace dwelling with a mansard style roof that stands within a mainly residential area, within which residential terraces predominate. I saw that some properties in the same terrace as No 11 have been externally altered and extended at the rear. Although these changes have resulted in some variety to the existing built form, characteristic features of this terrace include the subordinate relationship of the 2-storey rear outrigger to the more substantive and taller main dwelling beyond. The site does not fall within a conservation area nor is No 11 a listed building.

    A new extension is proposed on the 2-storey outrigger at the back of No 11, with materials to match those of the host building. It would introduce a 3rd storey to the outrigger and extend over almost its entire length with only a modest set back from the ground floor rear wall. The upper section of the proposal would project well above the eaves of the main building with the party wall along one side of the outrigger extended upwards. Due to its considerable scale and mass, the new extension would appear as overly large and bulky ‘box-like’ addition that would relate poorly to the appearance and modest proportions of the existing outrigger. By introducing a substantial new built form in a high-level position, the appeal scheme would also unduly disrupt subordinate relationship between the outrigger and the main house.

    The Council’s Supplementary Planning Document, [name] and Alterations (SPD) states that additions to the roof form should be in scale with and proportionate to the existing roof. For the reasons given, the proposed development would not adhere to this guidance.

    While the new extension would be at the back of the host building, away from public view, it would nonetheless form part of the character of the local area as it is experienced and appreciated from nearby properties. From the back gardens of neighbouring buildings, the proposal would draw the eye as an overly dominant and uncharacteristically large addition even among the varied built form at the rear of No [address].

    The appellants place some reliance on roof level additions made to the rear outrigger at other properties along [address], [address] and [address] with some details and photographs provided. Having carefully considered this evidence, I agree that several cases share some common features with the appeal scheme with some examples clearly visible from the road, unlike the proposal before me. Nevertheless, a key planning principle is that each development should be assessed on its own merits. To my mind, the schemes cited by the appellants serve to illustrate that changes to a building at a high level do have a significant impact on the character and appearance of that property and the local area to which it belongs.

    My own conclusion in relation to the specific merits of this case is that the scale, mass, and position of the proposed extension would cause it to unduly compromise the form and appearance of the host building and there would be a significant adverse impact on the surrounding area. Even if the Council has been inconsistent in its decision taking, and similar developments have been permitted elsewhere, this is not in itself an appropriate reason to find in favour of a development that in my view would cause harm.

    On the main issue, I therefore conclude that the proposed development would materially harm the character and appearance of the host building and the local area. Accordingly, it is contrary to Policies D1, D3 and D4 of The London Plan, Policy LP1 of the Hackney Local Plan 2033 and the SPD. These policies and guidance aim to ensure that development achieves high quality design, responds to local character and context and is compatible with the townscape. It is also at odds with the policies of the National Planning Policy Framework (the Framework), which require that development is sympathetic to local character and adds to the overall quality of the area.

    The proposal would provide additional living accommodation that, once complete, would improve the living conditions of the appellants. That others raise no objection does not necessarily mean that the proposal is therefore acceptable. These considerations do not outweigh the significant harm that I have identified.

  4. Section 05

    Conclusion

    The proposed development would conflict with the development plan, as a whole. There are no material considerations, including the Framework, which indicate that the decision should be taken otherwise than in accordance with the development plan. For the reasons set out above, and having regard to all other matters raised, I therefore conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 287No official casework-database value to compare
    Extracted decision date · page 1
    12 April 2023Matches the official casework database
    Extracted site visit dates
    20 March 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3314871
Application reference
2022/2531
Lead case reference
Not recorded
Planning authority
London Borough of Hackney
Planning authority code
E09000012

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
17 January 2023
Valid date
22 January 2023
Start date
17 February 2023
Planning authority decision date
14 December 2022
Appeal decision date
12 April 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
31058
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21