Appeal 3315080
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
demolition of existing garage and construction of two storey gable extension, single storey rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
An application for a Certificate of Lawfulness has previously been approved to alter the existing roof from a hipped one to a gable1. A planning application has also previously been granted for a two storey side extension2. I note that the notice granting the Certificate of Lawfulness includes an informative that those works if carried out would prevent the implementation of the approved planning application.
The description of the proposed development includes a single storey rear extension. This part of the proposal is not in dispute and I have no reason to disagree. The proposal also includes demolishing an existing garage which at the time of my site visit had already gone and construction works were underway on the site.
Section 04
Main Issue
The main issue is the effect of the proposal on the character and appearance of the host dwelling and the surrounding area.
Section 05
Reasons
The appeal site comprises a semi-detached house at the end of a cul-de-sac. At the head of the cul-de-sac is a row of terraced houses with a pair of semi-detached houses at either end of the turning head and another pair of semi-detached houses at right angles to the terrace that is, Nos 25 and 27 at one end are mirrored by Nos 20 and 22 at the other end. There is a uniformity to this layout which contributes to the character of the area and whilst No 25 is 1 Application No: 23LP/0108. 2 Application No: 22H/3143. located at the end of a cul-de-sac, the turning head is fairly wide and so the house can easily be seen from this end of the road.
The adjoining semi-detached house, No 27 has a two-storey flat roofed side extension and so there is already some degree of unbalancing or a lack of symmetry between these properties. I also note that No 27 also has obtained a Certificate of Lawfulness to alter the roof from a hip to a gable3.Whilst the area is generally characterised by hipped roofed there are examples where alterations have changed this. In particular, Nos 7 and 9 and Nos 17 and [address]. However, neither No 7 or No 17 have been extended in the same way as proposed here. For example, Nos 7 and 9 are different styles of houses and the position of Nos 17 and [address] along [address] is different to the layout of houses at the head of the cul-de-sac where No 25 is located. Other examples are cited which I have only limited details about but in any event are located further away and so do not directly relate to [address].
Notwithstanding the above, the original design of the houses in the road comprises hipped roofs and the approved two storey extension to No 25 would retain a hipped roof. The Certificate of Lawfulness demonstrates that the roof to No 25 could be altered from a hip to a gable without planning permission. However, these two developments could not both take place. In effect, one or the other could be built but not both. Therefore, either the approved planning approval or the Certificate of Lawfulness provide fall-back positions.
However, the proposal would result in an amalgam of these two designs by altering the shape of the roof and adding a two storey extension (and the single storey rear extension). Whilst the main difference therefore would be an added section of roof, this would enlarge the overall width of the roof and make the alteration from a hip to a gable very pronounced; much more so than that which could be constructed under permitted development. I find that the harm caused by the totality of this proposal would be significant to both the host dwelling and the surrounding area.
As proposed, I find that the proposed extension would significantly alter the character and appearance of the existing dwelling. It would erode the original proportions, design and overall appearance of the house to such an extent as to be harmful. [name] 25 is at the end of the cul-de-sac, the layout of the surrounding houses, their uniformity in design and the large turning head which makes the appeal site very visible, would result in a harmful effect on the character and appearance of the street scene.
Notwithstanding the fall-back positions explained above, I consider that the design of the proposed two storey extension would fail to complement the style of the dwelling and its size and scale would not be in keeping with the original dwelling or the surrounding area as required by Policy H8 of the Liverpool Local Plan4. The harm caused by the proposal would be significant and the fall-back positions arising from the Certificate of Lawfulness and the previous planning approval do not outweigh that harm. 3 Application No: 22LP/1717. 4 Liverpool City Council – Liverpool Local Plan 2013-2033, [name] 2022.
Section 06
Other matters
The appellant has pointed out the economic benefits of the proposal during the construction phase; the benefits arising from improving the appearance of the host dwelling; and the lack of any adverse impacts on residential amenity or highway safety. Whilst these support the proposed scheme they are not of such scale or of sufficient merit to overcome the harm I have identified.
Section 07
Conclusion
For the reasons given above, and having regard to the development plan and all other consideration, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4161No official casework-database value to compare
- Extracted decision date · page 1
- 15 June 2023Matches the official casework database
- Extracted site visit dates
- 20 March 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3315080
- Application reference
- 22H/2162
- Lead case reference
- Not recorded
- Planning authority
- Liverpool City Council
- Planning authority code
- E08000012
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 50 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- No
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 20 January 2023
- Valid date
- 20 January 2023
- Start date
- 9 February 2023
- Planning authority decision date
- 2 November 2022
- Appeal decision date
- 15 June 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 34058
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21