Skip to main content
Official casework recordAllowedCurrent release

Appeal 3316318

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

No verified development description has been extracted from an official decision PDF yet.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a summerhouse and shed at [site address] in accordance with the terms of the application Ref 2022/3022, dated 5 October 2022, subject to the conditions set out in the attached Schedule to this decision.

  2. Section 03

    Procedural and preliminary matters

    The outbuilding has already been built, and the appellant wishes to retain it. I shall therefore deal with the appeal as if the original application had been made under section 73A of the Act.

    The officer report on the application contains an assessment on the effects of the building on the locality’s character & appearance and neighbouring amenity. The Council raises no objections on either count. I have no reason to disagree with the Council’s assessment on these aspects.

  3. Section 04

    Main issue

    The main issue is the consequences and effects of retaining the outbuilding on matters relating to flooding.

  4. Section 05

    Reasons

    The outbuilding has been built at the end of a fairly lengthy garden serving a dwelling which is undergoing renovation and improvement. Part of the outbuilding has a workbench, and the other part was used for storage when I visited. In terms of its appearance, it is the type of structure commonly seen in gardens the length and breadth of the land; indeed, there are several examples of such structures in gardens in close proximity to the appeal site.

    A gate provides access from the appellant’s garden to amenity land upon which several small boats were stored. A slipway provided access from the amenity area to a walkway alongside the river built as part of the flood defences for [site address] . Between the walkway and the dwellings to the east is a flood defence wall. From the walkway I could see examples of other outbuildings built closer to the wall than the appellant’s. These are not referred to in the officer report and I have not been told whether or not these have the benefit of planning permission. Policy CS26 of the Council’s Core Strategy (CS), which is directed to flooding, provides that: Permitted development rights for development which could result in a loss of flood storage capacity or impede flood flow will be removed from new developments in flood zone 3...

    Thus, permitted development rights are available for outbuildings on residential properties in flood zone 2. The officer report and reason for refusal refer to a ‘5m buffer of zone 3’, but the Council, on enquiry, confirmed that this was merely an observation, and the site lies entirely within flood zone 2.

    The appellant’s most recent application for a certificate of lawfulness in respect of the outbuilding failed. This was because, being within 2m of the curtilage’s boundary, the outbuilding’s height should be limited to 2.5m if permitted development rights are to apply. The Council measured it at 2.56m. Had the outbuilding been built elsewhere within the garden, and not within 2m of the garden’s boundary, planning permission would not have been required.

    Had the building been 0.06m or so less in height, no planning objection could have arisen. The same would apply if the appellant relocated the outbuilding elsewhere within the garden1 away from the flood defence wall. Given that the appropriate authorities do not seek to restrict the construction of outbuildings qualifying as residential permitted development in flood zone 2, it must logically follow that they are not regarded as problematical in these terms.

    Taking account of all these factors, which I regard as material considerations attracting significant weight, it appears to me that the appellant’s submitted Flood Risk Assessment, although displaying some omissions, contains sufficient information to make an appropriate judgment. In my view, the development, taking account of all material considerations, has and would have little or no harmful impact or consequences relating to flooding.

    The second part of the Council’s reason for refusal provides: The development, by reason of its siting in close proximity to the existing flood defences, would be contrary to policies CS26 of the [name] (2011) and DM13 of the Development Management Plan (2015), the [name] (2016) and the amended NPPF (2021).

    The Council, in its officer report, does not specifically refer to those aspects of these policies or guidance which provide protection to flood defences. I have read and re-read the policies and guidance, national and local, and I can find no policy or aspect of guidance directed to the physical protection of flood defences, or possible maintenance buffers. I may, of course, have missed it. 1 As appears to be suggested by the Environment Agency (EA) in its observations dated 14 October 2021 on a previous application to retain the outbuilding (Ref 2021/2676) 2

    In this regard, the Council relies principally on the EA’s response to a previous application (Ref 2021/2676), since the Agency did not respond to consultation on the application subject of appeal. The Agency’s concern is that the building is sited too close to the flood defence wall so it: ‘..would restrict essential maintenance and emergency access to the existing defence in addition to potentially impacting the structural integrity and the ground anchors. The permanent retention of a continuous unobstructed area is an essential requirement for future maintenance and/or improvement works.

    However, I saw during my visit that a significant part of the area between the outbuilding and the wall was occupied by a [name] pumping station. This is not mentioned in either the Council’s officer report or the EAs original response, so I sought the parties’ observations. The EA has since clarified that this was probably installed in the period 1975 to 1988, prior to it taking responsibility for flood defences, and it intends taking the matter up with [name].

    It seems to me that the pumping station represents a potentially more considerable impediment for access to the flood defence wall than the outbuilding, and as the EA now say, the pumping station appears to be sited ‘over the ground anchors that potentially hold the flood defence wall up’. Indeed, according to the EAs estimate of the date of construction, this has been the situation for at least 35 years, and possibly longer. There is no evidence before me that any difficulty has arisen from the siting of the pumping station.

    Taking these factors and local policy into account, I can see no justification for withholding consent for the outbuilding.

    I therefore conclude that there is insufficient evidence to demonstrate that the retention of the outbuilding would lead to harmful consequences in respect of flooding. Accordingly, I find no conflict with those provisions of CS policy CS26 or policy DM13 of the Council’s Development Management Plan directed to measures to prevent the harmful effects of flooding.

  5. Section 06

    Conditions

    The Council has suggested the imposition of several conditions in the event of the appeal being allowed. Since the outbuilding is substantially complete, a condition identifying the approved plans is unnecessary as is the condition relating to materials.

    It is, however, necessary to clarify the use of the building and to formalize the mitigation measures proposed by the appellant in his submitted Flood Risk Assessment. The conditions are imposed to reduce the risk of any consequential effects of potential flooding.

    All other matters raised in the representations have been taken into account, but no other matter raised is of such strength or significance as to outweigh the considerations that led me to my conclusions.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2949No official casework-database value to compare
    Extracted decision date · page 1
    9 June 2023Matches the official casework database
    Extracted site visit dates
    12 May 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3316318
Application reference
2022/3022
Lead case reference
Not recorded
Planning authority
Elmbridge Borough Council
Planning authority code
E07000207

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
24 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
8 February 2023
Valid date
16 February 2023
Start date
29 March 2023
Planning authority decision date
30 November 2022
Appeal decision date
9 June 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
33802
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21