Appeal 3316911
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a first floor rear extension.
Section 02
Decision
The appeal is allowed and planning permission is granted for a first floor rear extension at [site address] in accordance with the terms of the application, Ref 22/00767/FLH, dated 25 July 2022, and the following plans submitted with it: Block Plan; Revised Plan SG1/07/22/[name] – [name].
Section 03
[name]
The application was made on a retrospective basis and I have considered the appeal as such, though I have removed reference to ‘retrospective planning application’ from the description of development as this does not relate to an act of development.
Section 04
Main Issue
The main issue is the effect of the development of the living conditions of neighbouring occupants at [address], with respect to outlook, light and enclosure.
Section 05
Reasons
The development comprises a first floor extension erected above a previous single storey rear addition. The submitted plans indicate the extension to be 2.85 metres in depth, though neither party quotes a measurement for the depth of the extension in their written submissions.
The Council refers to its Successful Places Supplementary Planning Document (SPD) (2013) which sets guidance for rear extensions. In particular, a 45 degree rule is set out which states that a significant reduction in daylight is likely to occur if the centre of the affected window, or a point 2m above the ground level for patio doors, is covered by the shaded areas delineated by two 45 degree lines drawn from the outer corner edge of the extension in plan and the eaves line in elevation. The guidance does state that the rule is to be applied flexibly.
The plans submitted include 45 degree lines on the plan drawings only and are not taken from the same points as the SPD guidance. However, they show that the extension breaches a 45 degree line drawn from the centre of the nearest bedroom window at first floor level. The Council adds that the patio doors beneath this window at ground floor level would also fail the test, though I have no graphic representation of this. From what I can glean from the plans, the extension does not breach the 45 degree rule for the first floor window in elevation. However, from my observations, the patio door at ground floor level appears to fail the 45 degree test both in plan and elevation.
The Council also points to the fact that the neighbouring windows face in a northerly direction and the extension, being roughly to the west of these windows, would exacerbate the impact on neighbours by reducing sunlight and conversely increasing shadow in the afternoon and evening.
I observed the extension from the neighbouring dwelling. It is not especially deep, but combined with its height, it is an immediate presence in views from both the patio and rear bedroom windows. However, it sits to one side of these views, and there remains broad vistas to the rear, where the dwelling borders onto open playing fields, and to the other side of the property. Neighbouring occupants therefore retain a good level of outlook, notwithstanding the massing of the extension.
The orientation of the extension would result in some increase in overshadowing during the afternoon and evening. This would have a more pronounced effect on the rear patio doors at ground floor level. However, I saw that the patio doors serve a dual aspect living room with a southerly facing front window that would receive good sunlight and daylight across a large part of the day. The large patio doors also enable good levels of daylight into the ground floor living space, despite the presence of the extension. The garden area beyond the depth of the extension would also remain largely unobstructed and in receipt of good levels of sunlight and daylight.
Moreover, the SPD is not prohibitive of two storey extensions where they pass the 45 degree rule. However, based on the plans before me, for the extension to pass the 45 degree test, it would have to be reduced in depth, potentially limiting the utility of the internal space provided. Hence, the SPD directs the rule to be applied flexibly. Here, even if reduced in depth to comply with the 45 degree rule, neighbours would still experience some higher level massing on the boundary. In my judgement, the extension, although it breaches the 45 degree rule, does not do so to a substantial degree, and the difference between an SPD compliant scheme and that built, in terms of additional enclosure, overshadowing or reduced outlook, is not of a scale that would have a significantly worse effect on neighbours’ enjoyment of their living spaces.
Given these considerations, I find that the effect on outlook, light and sense of enclosure would not be so severe as to significantly harm the living conditions of neighbouring occupants. Therefore, notwithstanding the guidance of the SPD, I conclude that there would be no conflict with [name], SS7 and SDC12 of the North East Derbyshire Local Plan (November 2021) which together require development to achieve high quality design that avoids significant loss of amenity for residents of neighbouring properties.
Section 06
Other Matters
The Council did not refuse permission in respect of the effect of the proposal on the character and appearance of the area, noting the mix of development styles, including other two storey extensions. I saw one such example at No
The location of the extension to the rear means it has no effect on the street scene along [address]. From all I have seen and read, I have no reasons to conclude differently to the Council in this matter.
I note further concerns raised by the neighbouring occupant with respect to the position of the extension relative to the shared boundary. The neighbour points to the submitted plans being inaccurate in this respect. The Council only refers to a difference between the block plan and proposed plans but does not raise specific concern that details submitted are not sufficient to determine the proposal. From my observations, the extension as shown on the site plan is in a different position to the other plans, which are sufficiently accurate to enable the appeal to be determined. For the avoidance of doubt, I have omitted reference to the site plan in the formal decision above.
There is also concern raised with regards to the fascia of the eaves overhanging the common boundary between the two properties, as well as concerns with the location of foundations and the safety of wiring on the exterior of the extension. However, such matters relate primarily to party wall legislation falling to be addressed outside the planning process. They are not determinative matters in respect of the main issue of the appeal.
Section 07
Conditions
As the works are indicated to have already been completed, it is not necessary to impose a time limit condition or an approved plans condition, though I shall list the relevant plans in the formal decision for clarity.
Section 08
Conclusion
For the reasons set out, the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 426No official casework-database value to compare
- Extracted decision date · page 1
- 2 May 2023Matches the official casework database
- Extracted site visit dates
- 4 April 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3316911
- Application reference
- 22/00767/FLH
- Lead case reference
- Not recorded
- Planning authority
- North East Derbyshire District Council
- Planning authority code
- E07000038
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 13 February 2023
- Valid date
- 13 February 2023
- Start date
- 7 March 2023
- Planning authority decision date
- 30 November 2022
- Appeal decision date
- 2 May 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 32039
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21