Appeal 3316973

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

creation of loft extension, increasing height of roof ridge and adding 1 dormer windows at rear, and 3 conservation type flush Velux rooflights (with glazing bar) on front roof slope.

  1. Section 02

    Decision

    The appeal is allowed, and planning permission is granted for creation of loft extension, increasing height of roof ridge and adding 1 dormer windows at rear, and 3 conservation type flush Velux rooflights (with glazing bar) on front roof slope at [site address] , Kensington and Chelsea, London, [postcode] in accordance with the terms of the application ref PP/22/05491 dated 8 September 2022, subject to the following conditions:

    The development hereby permitted shall be begun before the expiration of three years from the date of this permission;

    The development shall not be carried out except in complete accordance with the details shown on submitted plans: 306_LR-P.SP [name] (proposed site plan), 306_LR-P.P.01 [name] (proposed first floor), 306_LR-P.P.02 [name] (proposed loft), 306_LR-P.P.03 [name] (proposed roof plan), 306_LR-P.E.01- 02 [name] (proposed front and rear elevations), 306_LR-P.E.03 [name] (proposed side elevation), 306_LR-P.E.04 [name] (proposed side elevation) and 306_LR-P.S.01 [name] (proposed section 01).

    No development shall commence until: A) An Appendix A Checklist and Site Construction Management Plan (SCMP) for the development have both been submitted to, and approved in writing, by the Council’s Construction Management Team, and then B) Copies of the approved Checklist and Plan, and their written approval, have been submitted to the local planning authority to be placed on the property record. The development shall be carried out in accordance with the [name] and SCMP so approved, or in accordance with a subsequent Checklist or SCMP as may be approved under this condition.

    The rooflights shall be of a traditional conservation type, flush with the roof and slim framed, and so maintained;

    The rear dormer window of the development hereby approved shall be clad in lead, and the raised part of the roof shall be covered in natural slate tiles to be in keeping with existing.

  2. Section 03

    Main Issue

    The main issue is the impact of the proposal upon the residential amenity of neighbouring occupiers at [address] with regard to sense of enclosure, daylight and sunlight and other neighbouring properties with regard to sense of enclosure.

  3. Section 04

    Reasons

    The appeal site is a two-storey dwelling, located within a terrace, within the [address] Conservation Area (CA). The proposal seeks to create a loft extension through an increase in height of the roof ridge, addition of a dormer window to the rear as well as adding three conservation type flush velux roof lights on the front roof slope. I note that the Council do not raise any concern with regard to character and appearance of the building, group of buildings, street scene or the CA and I have no evidence before me to conclude differently on these elements. Both refusal reasons are based upon the residential amenity of adjoining property [address] (no. 1), as well as sense of enclosure for other neighbouring properties, with regard to the loft extension and addition of a dormer window.

    At the time of my site visit, I entered the appeal property and went through bedroom 2, on the first floor, onto the existing terrace where I was able to see the flat roof and sky-light which forms part of the appeal site (over the appellant’s kitchen) as well as the single storey rear extension and a small rear courtyard to no. 1. The appeal proposal would raise the height of the ridgeline by about 0.26 metres with the proposed dormer being around 4.3 metres wide, 2.3 metres high and 3.5 metres deep. The proposed side elevations (drawing 306_LR-P.E.04 [name] and 306_LR-P.E.03) show that the proposed extension would not project past the existing, original, eave of the roof. Additional height, and built form, would therefore be contained over the original roof area (footprint) only as a dormer.

    The proposal would be set back away from the rear skylight serving the kitchen and ground floor of no. 1 by a noticeable separation distance due to the proposal being separated by both the existing ground floor kitchen of the appeal site as well as the first-floor terrace and bathroom. Measured horizontally, the proposed rear dormer would be located just over five metres from the roof-light in the single storey rear extension at no. 1. Furthermore, the appellant has evidenced that roof-lights, whilst of importance, are secondary windows as the property has fenestration at ground level providing access to the rear courtyard. Even if the neighbouring property did not benefit from these doors to the courtyard in question, I still find that the height, depth, and siting in proximity to the rear skylight serving the kitchen and ground floor area would be appropriate due to the separation which I have outlined.

    The objection shows that directly above/behind the skylight, at no. 1, is the back of the appeal site and the railing of the appeal site terrace is visible, as is the roof above. I find that, as outlined previously, the proposed dormer and roof extension would not bring the built form forward of the existing eaves of the original roof and that views would be largely unchanged in that they would still be of the roof/built form of the appeal site in question. As a result of the position of the proposed development, and taking into account its scale and site context, I do not find that the height, depth, and siting would result in harmful impact to residential amenity of the occupants of no.1 as a result of the separation distance from the existing roof-light at no. 1.

    It therefore follows that, due to the separation in question, I do not find that the proposal would result in a harmful increase in the sense of enclosure to no. 1 due to the fact that the existing arrangement, including the existing first floor terrace at the appeal site, would be unaffected and the dormer would be over the existing main roof area of the dwelling at a separation distance of in excess of 5 metres. The proposed dormer would be set further away than outlined within the objector’s submitted photographs and would not appear duly prominent in views through natural use of the roof-light in question.

    No. 1 is also located to the east of the appeal site, however, the skylight in question is to the south of the adjoining dwelling which I find would assist in maintaining sufficient natural daylight/sunlight as a result of the positioning of the skylight on the southern side of the adjoining property.

    Whilst the Council’s first refusal reason references living conditions for other, unspecified, neighbouring properties there is no clear evidence of assessment as to impact upon these properties within the Council’s report. Adjoining property, [address], is already taller than the appeal property and is separated by a higher party wall. The proposal would be visible in oblique angles, but this would be largely mitigated by the impact of the existing chimney in relation to the skylights in the rear roof slope. [address] is located to the north and has one skylight which evidence suggests serves a staircase and a first-floor extension, would mitigate any potential impact upon the kitchen skylights.

    The proposal would be consistent with the Royal Borough of Kensington and Chelsea Local Plan 2019 Policy CL5 which seeks to ensure that all development provides good living conditions for occupants of new, existing, and neighbouring buildings. To deliver this, decisions will ensure that good standard of daylight and sunlight are achieved in existing properties affected by new development and require that there is no harmful increase in the sense of enclosure to existing buildings and spaces.

  4. Section 05

    Other Matters

    A letter of objection is noted to have been submitted as part of the application process. I have dealt with matters relating to sunlight, daylight, and sense of enclosure within the main issues of this decision letter.

    Comments regarding infringement on privacy are noted, however, the appeal site already benefits from a first-floor terrace to the rear which is much closer to the skylight in question and the windows of surrounding properties already result in potential for overlooking into that skylight to some extent. There is already an existing amount of mutual overlooking and I do not consider that the proposed dormer would result in any reduction in privacy when taking into account the existing site context, and first floor terrace, at the appeal site in question.

  5. Section 06

    Conditions

    The Council’s questionnaire suggests that conditions relating to timing, materials and accordance with the approved plans are not necessary however, I consider they are necessary and have applied them to the permission granted. A time condition is attached to comply with section 51 of the Planning and Compulsory Purchase Act 2004. A condition requiring the development to be in accordance with the approved plans is required to control and define the development which is granted consent.

    Conditions relating to materials, and a condition regarding the rooflights, are required to ensure the proposal matches the host dwelling and that any deviations in materials from existing are approved by the Council to ensure an appropriate finish. A condition regarding a construction management plan is required to mitigate the impact of construction work upon the levels of amenity for neighbouring occupiers.

  6. Section 07

    Conclusion

    For the reasons outlined above, and taking account all other matters raised, I conclude that the appeal should be allowed subject to conditions.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 115No official casework-database value to compare
    Extracted decision date · page 1
    1 June 2023Matches the official casework database
    Extracted site visit dates
    9 May 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3316973
Application reference
PP/22/05491
Lead case reference
Not recorded
Planning authority
Royal Borough of Kensington and Chelsea
Planning authority code
E09000020

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
16 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
20 February 2023
Valid date
20 February 2023
Start date
15 March 2023
Planning authority decision date
9 December 2022
Appeal decision date
1 June 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
33453
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21