Appeal 3317029
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
No verified development description has been extracted from an official decision PDF yet.
Section 02
Decision
The appeal is allowed and planning permission is granted for construction of a single-storey rear extension, removal of chimney and enlargement of roof at [site address] , Greenwich, [postcode] in accordance with the terms of the application, Ref 22/3291/HD, dated 2 October 2022, subject to the following
Section 03
conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: [name] 01, 02, 03, 04, 05, 06, 07 and 09.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
Section 04
[name]
The description I have used in my formal decision reflects that which was given by the Council on their decision notice and which was repeated by the appellant on the appeal form. This gives a better all-round description of the proposed development rather than that which was given on the application form and which I have quoted in the banner heading above.
Section 05
Main Issue
The main issue is the effect of the proposal on the character and appearance of the host dwelling and the wider street scene.
Section 06
Reasons
The appeal property is a two-storey, end of terrace dwelling with a hipped roof. It occupies a corner location with its principal, symmetrical elevation set 90- degrees to the remainder of the terrace due to the sharp turn in [address] at this point. This arrangement gives No 61 a fairly unique appearance amongst its immediately adjoining contemporaries, but which sits comfortable within the wider setting of this established residential neighbourhood which displays some modern additions in places, creating a pleasing balance between old, new and the slightly different. The appeal proposal includes a single-storey rear extension, and a change to the roof’s profile with an increase to the height and length of the ridge line, and a rise to the angle of the roof slope.
The Council has raised no objection to the proposed single-storey rear extension. I agree that it would be a modest addition that would have little impact upon the appearance of the dwelling.
I note that the proposed roof alterations follow on from two previous proposals for changes to the dwelling at this level. In both instances the planning applications (Refs 18/2731/HD and 21/0012/HD) were refused permission and subsequent appeals ([name]/E5330/D/18/3219202 and APP/E5330/D/21/
were dismissed. In both cases the proposals involved a hip to gable change, with the Inspectors in agreement that the loss of spaciousness created by the existing hipped roof arrangement, and the resulting dominance of the proposed gable within the street scene, would be inappropriate.
I understand the previous Inspectors’ concerns. However, the current appeal proposal differs markedly from those that went before. The building would retain its hipped roof, albeit in a different form. A suggestion by the Council that the proposal would result in a ‘steep hipped end’ is to my mind an over-exaggeration. The roof pitch would undeniably change, but to an angle of slope that would not be unconventional. Neither would it be out of keeping with the pitch of some roofs locally. The roof as a whole would be proportionate to the dwelling thereby avoiding any sense of appearing ‘top-heavy’ or incongruous. When seen from the west, where the principal elevation is openly viewed, the building would retain its symmetry and important sense of space, whilst also continuing to reflect the front roof slopes of adjoining properties.
The increased step change in ridge height between Nos 61 and 63 would not be uncharacteristic for [address]. The topography of the area is such that firebreak walls on the roofs between attached properties vary considerably in size from property to property. An obvious but not isolated example is directly opposite the appeal site at No 62 which sits much higher than its attached neighbour at No 64, with a tall firebreak wall along the common boundary. There is a marked difference between the roof configurations of these attached properties but given the established character of the area, nothing appears out of place or incongruous. The changes at No 61 would be a similar reflection of this. The increased height of the firebreak wall between the appeal property and No 63 would not be uncharacteristic and would signify a clear distinction between the different roof forms that would result, which would simply further mark the unique form of No 61 and add subtly to the existing mix along [address] where different buildings, even when attached, harmonise.
Overall, I am satisfied that the proposed roof alterations would not dramatically alter the appearance of No 61 and that the changes would be sympathetic without harm to the character or appearance of the wider street scene. I therefore find no conflict with the aims or objectives of the Council’s Residential Extensions, Basements and Conversions Guidance Supplementary Planning Document 2018 where it deals with roof extensions/loft conversions. Neither do I find conflict with Policies DH1 or DH(a) of the Royal Greenwich Local Plan: [name] with [name] 2014 or Policy D3 of The London Plan 2021 insofar as they require new development, including residential extensions, to achieve high quality design that responds positively to local context through, amongst other things, respect for the scale and appearance of a host building and established development pattern. For the same reasons, I find no conflict with the National Planning Policy Framework’s objectives for achieving well-designed places.
Section 07
Conditions
A condition specifying the relevant plans is necessary as this provides certainty. In the interests of maintaining the character and appearance of the area a condition is required to ensure that the proposal is finished with materials to match the existing.
Section 08
Conclusion
For the reasons given, I am satisfied that there would be no harm to the character or appearance of [site address] , or the wider street scene. Accordingly, in the absence of any other conflict with the development plan, and having regard to all other matters raised, the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 286No official casework-database value to compare
- Extracted decision date · page 1
- 14 June 2023Matches the official casework database
- Extracted site visit dates
- 18 May 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3317029
- Application reference
- 22/3291/HD
- Lead case reference
- Not recorded
- Planning authority
- Royal Borough of Greenwich
- Planning authority code
- E09000011
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 7 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 20 February 2023
- Valid date
- 26 February 2023
- Start date
- 28 March 2023
- Planning authority decision date
- 28 November 2022
- Appeal decision date
- 14 June 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 33999
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21