Skip to main content
Official casework recordDismissedCurrent release

Appeal 3317111

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of a double storey side and rear extension with part rear single storey extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural matter

    An application for costs was made by the appellant against the Council. This application is the subject of a separate decision.

  3. Section 04

    Main issue

    The main issue is the effect of the proposed development on the character and appearance of the host building and the local area.

  4. Section 05

    Reasons

    The proposal is to enlarge and externally alter the appeal property, which is a 2-storey semi-detached dwelling within a predominantly residential area. Like its attached counterpart, the walls of the house include pebbledash render with elements of brick and stone detailing. The roof is tiled with hipped ends. No [address] along which buildings vary in type, size, style, and general appearance. There is, therefore, some variety to the existing built form within the street scene and the local area to which the site belongs.

    The new rear addition would exceed the width of the host building and project outwards from the main wall into the back garden of No 59. With a sizeable 2-storey element to the rear extension, and a substantial gable facing the back garden, an addition of this scale and mass could not reasonably be described as a subordinate addition, which is a requirement of Policy RES E7 (i) of the Council’s Residential Design Guide Supplementary Planning Document (SPD).

    There would also be an uneasy transition between the proposal and the host building as the 2-storey extension wraps around a rear corner of the dwelling. In views from the road just in front of the site, the new hipped roof would be noticeably lower than that of the host roof. The slope of the new hipped roof would also be at a right angle to the side roof slope of the main dwelling. The visual effect of this arrangement would be unconvincing given that the proposal would fail to be assimilated with the main roof. When seen from in front of the site, the proposal would attract undue attention as an awkward ‘add-on’ to the existing house.

    With regard to materials, the application of silicone coloured render to the main house in place of pebbledash would be appropriate to the style and age of the dwelling. However, the singular use of charred timber cladding to the new extension would jar with the lighter colour and texture of the proposed render. The sharp contrast in materials between the main house and the new extension would visually accentuate the awkward visual relationship between them.

    While variation is a characteristic in the external materials and general appearance of existing development in the local area, I saw that timber cladding is generally applied with restraint. Notably, the front elevations of the bungalows a little further along [address] to the site include vertical timber cladding to their front elevations which is visible from the road. However, this material is above and below a window and it covers less than half the façade, with the remaining front and sides of the single storey dwellings largely constructed of brick. Timber, whilst evident, is used as a feature at the front of these dwellings with brick remaining predominant. During the site visit, I saw no obvious examples of properties with 2-storey timber clad extensions that were visible from the road, as proposed.

    I agree that timber can be a high-quality material and that its natural appearance can blend into areas that have a verdant character with woodland evident from the road beyond the main house. In my experience, developments that contrast in materials and general appearance can also contribute to the diversity of an area and add visual interest to the street scene. However, in this case, the proposed development would result in a side extension with an awkward corner element and a rather stark, uncharacteristic, outward appearance. To my mind, the proposal does not achieve its objective of enhancing the appearance of the dwelling by introducing an extension with a contemporary twist nor would it be assimilated into the surrounding area. To the contrary, the proposal would draw the eye from the road as a conspicuous, discordant, and unwelcome addition to the local area.

    On the main issue, I conclude that the proposed development would cause significant harm to the character and appearance of the host building and the local area. As such, it conflicts with Policy CS16 of the Blackburn with [name] and Policy 11 of the Local Plan Part 2. These policies require new development to achieve a high standard of design, respect, enhance and reinforce local character, and make a positive contribution to the surrounding area. It is also contrary to [name] 1E, RES 7E and RES 8 of the Council’s SPD, which note that the design and materials of an extension should be in keeping with the existing property. The proposal is also at odds with the National Planning Policy Framework, which states that developments should add to the overall quality of the area and be sympathetic to local character.

    The appellant criticises the Council on the grounds that its refusal is based on a subjective judgment. Matters of character and appearance inevitably are. I also do not accept that the Council has acted unfairly during the application process. To my mind, the exchange of emails provided between the Council and appellant indicate a difference of opinion on the merits of the proposal rather than evidence that the Council’s stance was too one sided or unfair.

    I note the appellant’s opinion that the proposal would qualify as permitted development save for the external materials proposed and that others raised no objection. However, planning permission is sought for the proposal and a lack of objections is not necessarily a reliable indicator that the development sought is therefore acceptable.

  5. Section 06

    Conclusion

    The proposed development would conflict with the development plan. There are no material considerations, including the policies of the Framework, which indicate that the decision should be taken otherwise than in accordance with

  6. Section 07

    the development plan.

    For the reasons set out above, and having regard to all other matters raised, I therefore conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 287No official casework-database value to compare
    Extracted decision date · page 1
    22 May 2023Matches the official casework database
    Extracted site visit dates
    25 April 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3317111
Application reference
10/22/0721
Lead case reference
Not recorded
Planning authority
Blackburn with Darwen Borough Council
Planning authority code
E06000008

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
40 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
21 February 2023
Valid date
21 February 2023
Start date
22 March 2023
Planning authority decision date
2 December 2022
Appeal decision date
22 May 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
33001
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21