Appeal 3318583
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey rear extension.
Section 02
Decision
The appeal is allowed and planning permission is granted for a single storey rear extension at [site address] , Newtown, [postcode] in accordance with the terms of the application, Ref 22/2172M, dated 24 May 2022, and the plans submitted with it, subject to the following
Section 03
conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: location plan drawing 22016_P01, amended site plan drawing 22016_P10A, amended ground floor plan drawing 22016_P11B, amended first floor plan drawing 22016_P12B and amended elevations drawing 22016_P14A.
The external surfaces of the development hereby permitted shall be constructed in materials to match the existing dwelling.
Section 04
Preliminary Matters
The description of development in the banner heading above is taken from the Council’s decision notice. From the evidence before me the appellants have agreed to the amended description following the submission of revised plans. I have therefore used the amended description of development in assessing the proposal.
Section 05
Main Issue
The main issue is whether or not the proposal would be inappropriate development in the Green Belt, having regard to the National Planning Policy Framework 2023 and any relevant development plan policies.
Section 06
Reasons
The National Planning Policy Framework (the Framework) explains that the Government attaches great importance to Green Belts. The fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open; the essential characteristics of Green Belts are their openness and their permanence.
The construction of new buildings within the Green Belt is inappropriate development according to Paragraph 149 of the Framework, subject to certain exceptions. The exception at Paragraph 149 c) allows for the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building.
Policy PG3 of the Cheshire East Local Plan Strategy, 2017 (LP) reflects the Framework, resisting extensions or alterations that are disproportionate additions over and above the original building and, in this regard, PG3 is consistent with the Framework and is given full weight. However, neither the Framework nor PG3 define ‘disproportionate additions’.
Policy RUR11 of the Cheshire East Site Allocations and Development Policies Document, 2022 (SADPD) provides further guidance on assessing proposals for extensions and alterations to buildings in the Green Belt and outside of settlement boundaries. Criterion 3 advises that proposals would usually be considered as disproportionate additions where they increase the size of the original building by more than 30% in the Green Belt and section 4 of the policy defines the original building1. The policy states that the increase in size will usually be determined by assessing the net increase in floorspace.
By providing a more detailed definition of disproportionate additions, and an indicative threshold, Policy RUR11 of the SADPD differs from the Framework. However, in my judgement, Policy RUR11 follows the broad approach of the Framework and adds a locally specific definition to assist the decision maker. I have therefore afforded full weight to Policy RUR11 of the SADPD in making my
Section 07
decision.
The appeal site falls within land defined as Green Belt. It comprises a semi-detached dwelling which sits within a small row of houses between the adjoining neighbouring dwelling and a separate pair of semi-detached houses. The appeal proposal is for a single-storey extension on the rear of the dwelling, continuing the existing single-storey section to the full width of the property and, on its own, the extension would be small.
However, the property has been extended previously and already exceeded the 30% floorspace threshold. As such any further additions, including the appeal proposal, would increase the original dwelling by more than 30%. Any further extensions would, when considered against the 30% threshold, be disproportionate additions according to criterion 3 of Policy RUR11. Notwithstanding the appellants’ assertions, the current proposal, albeit small-scale in comparison to the existing dwelling, is not de minimis in terms of its increase in floorspace alone.
However, criterion 3 of Policy RUR11 has three exceptions. The extension is not required to provide basic amenities or sanitation. All of the basic amenities are already present at the property and the proposal would extend the existing facilities rather than provide them. The proposal is not within a village infill boundary and is not for a small-scale domestic outbuilding. 1 Original building means as it was originally built, or as it existed on 1 July 1948.
Subsection ii) of criterion 3 provides an exception to the 30% threshold where the proposal provides additional floorspace with no significant alterations to the building’s envelope or external appearance. The example given within the policy is a basement extension.
The proposed extension would be to the rear of the property and would complete the existing single-storey extension to the full width of the dwelling. The proposal would not project beyond the rear or side elevation of the existing property. The proposal, in itself, would be very modest in terms of its height, bulk, form, siting and design. Although it would alter the building’s envelope and appearance greater than a basement it would not do so to a significant degree.
The exception within Policy RUR11 does not require the extension to be of no greater impact than a basement. The exception allows for additional floorspace where the result is not a significant alteration. Given the height, bulk, form, siting, and design of the proposal I find that the extension would not result in a significant alteration to the building’s envelope or external appearance and, therefore, the proposal would comply with the exception in subsection 3 ii) of Policy RUR11 of the SADPD.
In considering paragraph 149 c) of the Framework, when taken cumulatively with the previous extensions, the proposed extension would result in additional floorspace. Nevertheless, the height, bulk, form and massing, and therefore the volume and external dimensions of the total extensions, would not result in disproportionate additions over and above the size of the original building. The proposal would therefore meet the exception set out at paragraph 149 c) and would, therefore, not be inappropriate development according to the Framework.
For the same reasons the proposal would not result in a disproportionate addition over and above the original dwelling and, as such, it complies with the exception in Policy PG3 of the LP.
I therefore find that the proposal would not be inappropriate development in the Green Belt according to the provisions of Policy RUR11 of the SADPD which attracts full weight as set out above. Further compliance exists with Policy PG3 of the LP.
Section 08
Conditions
A condition specifying the time limit and approved plans is necessary as this provides certainty. I have also imposed a condition specifying that the external surfaces shall be constructed in materials to match the existing dwelling in order to ensure that the extension is of an appropriate finish and relates well to the existing development.
Section 09
Conclusion
There are no material considerations that indicate that the application should be determined other than in accordance with the development plan, of which the relevant policies attract full weight. For the reasons given above, I therefore conclude that the appeal should be allowed. [planning inspector] INSPECTOR
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4777No official casework-database value to compare
- Extracted decision date · page 1
- 2 October 2023Matches the official casework database
- Extracted site visit dates
- 9 August 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3318583
- Application reference
- 22/2172M
- Lead case reference
- Not recorded
- Planning authority
- Cheshire East
- Planning authority code
- E06000049
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 14 March 2023
- Valid date
- 25 March 2023
- Start date
- 4 July 2023
- Planning authority decision date
- 1 February 2023
- Appeal decision date
- 2 October 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 39566
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21