Appeal 3318989
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
construction of a timber framed tree house with storage at ground level and a sitting area above.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issues are: • The effect on the character and appearance of the area • The effect on nearby trees
Section 04
Character and Appearance
The appeal site is located on [address] and is bounded by open fields and countryside. Located on the site is a 2 storey wooden tree house for which retrospective planning permission is sought. The development includes a building with window and doorway, balcony, decking and seating area accessed via a wooden step ladder with ground floor storage underneath standing on a concrete base. The tree house is supported by wooden beams fixed with metal bolts onto existing trees.
Whilst the appellant says the wood has been stained to blend with the surrounding trees, the 2 storey structure is nevertheless clearly visible due to its size, massing, design and proximity to the road and golf course. There are clear views of the development from public vantage points in short and long distances creating an incongruous appearance that interferes with the natural appearance of the surroundings. Its use as a domestic shed does not make it acceptable, as has been suggested by the appellant.
The development harms the character and appearance of the area. It therefore conflicts with the part of Policy EQ3 of the High Peak Local Plan 2016 (Local Plan) which strictly controls development outside settlement boundaries to protect the landscape’s intrinsic character and distinctiveness and requires new development to be of high quality design and protect or enhance landscape character. It also conflicts with the parts of Policy S1 and EQ6 of the Local Plan which requires high quality design and requires new development to be well designed and respect and positively contribute to the character and identity of an area.
Section 05
Trees
The appellant says that the development is having no structural impact on the trees. However, this has not been demonstrated as there is no tree survey or assessment before me. Given the materials used to attach the structure to the trees and the use of hard standing at the base of the structure I cannot be certain that the development is not having a harmful impact on the trees and their root systems without any detailed evidence to demonstrate otherwise. The development consequently conflicts with Policy EQ9 of the Local Plan which amongst other things protects existing trees from loss or deterioration.
Section 06
Other Matters
The site is within the catchment area of the Peak District Dales Special Area of Conservation which has been identified by Natural England as being in an unfavourable condition due to excessive phosphorous nutrients. Consideration needs to be given as to whether the development would lead to further harm by creating a source of water pollution or impact on water quality. Given the nature and scale of the development it is unlikely that it would result in additional discharge of nutrients into the catchment. In any event, as I am dismissing the development for other reasons it is unnecessary for me to consider the matter any further and a Habitat Regulation Assessment is not needed in this instance.
Section 07
Conclusion
For the reasons identified, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3546No official casework-database value to compare
- Extracted decision date · page 1
- 27 June 2023Matches the official casework database
- Extracted site visit dates
- 23 May 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3318989
- Application reference
- HPK/2021/0667
- Lead case reference
- Not recorded
- Planning authority
- High Peak Borough Council
- Planning authority code
- E07000037
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 18 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 21 March 2023
- Valid date
- 21 March 2023
- Start date
- 10 May 2023
- Planning authority decision date
- 28 December 2022
- Appeal decision date
- 27 June 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 34688
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21