Appeal 3319269
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a rear single storey extension.
Section 02
Decision
The appeal is allowed and prior approval is granted under the provisions of Article 3(1) and Schedule 2, Part 1, Class A, [name].4 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for a rear single storey rear extension at [site address] in accordance with the application Ref 11/23/0053 made on 25 January 2023, and the details submitted with it including plan nos. 1799 Rev 2 Page 1/2 (Existing & proposed layout) and 1799 REV 2 Page 2/2 (Proposed layout), pursuant to Article 3(1) and Schedule 2, Part 1, Class A, paragraph A.4(2).
Section 03
Preliminary Matters
The Council’s decision notice suggests the development would not be in keeping with the character and appearance of the area and refers to Policies including Policy DM26 ([name] and Materials) of the Hyndburn Borough Council Local Plan Development Management DPD (2018) (LP).
However, the provisions of the GPDO require the local planning authority to assess the proposed development solely on the basis of its impact on the amenity of any adjoining premises, taking into account any representations received. My determination of this appeal has been made on the same basis. While the policies of the development plan referred to in the Council’s decision notice have therefore not on their own been determinative, I have taken them into account as a material consideration, insofar as they are relevant to an assessment of the effect on amenity.
The Council’s delegated report notes that the submitted plans are not entirely consistent with the existing rear elevation of the host dwelling. I saw for myself that the existing windows on the rear elevation are not accurately drawn on the plans. Even so, this has not hindered my ability to assess the potential effects of the proposal based on its specific design, its position relative to neighbouring dwellings and my observations on site.
Section 04
Main Issue
The main issue is the effect of the proposed extension on the living conditions of occupiers of neighbouring dwellings with particular regard to outlook.
Section 05
Reasons
I am aware that there was a previously dismissed appeal on the site1 which also proposed a single storey rear extension. I understand that particular proposal was 6.0 metres in depth and abutted the boundary with No [address]. On my site visit, I also saw that the relative levels between these neighbouring dwellings means that the ground floor windows on the rear elevation of No 59 are set slightly lower than those on the rear elevation of the appeal dwelling.
Even so, the extension would be smaller than the previous proposal at 5.0 metres (m) in depth. The eaves of the extension would not be much greater in height than the top of the existing boundary treatments to this boundary. In combination with the position of the extension, set away from the shared boundary with No 59 by 0.5m, these factors would ensure that the development would not dominate or unacceptably effect outlook when experienced from the garden and ground floor windows to the rear of No 59.
The Council’s delegated report suggests that the proposal would breach a ’45 degree rule’. However, no such rule is set out in the GPDO or the development plan policies provided. In any case, I find that in this particular instance the projection of the extension beyond a 45 degree line drawn from the nearest edge of the neighbouring window would not in itself be harmful having regard to the site-specific circumstances and design elements described above.
Due to the single storey scale of the development, the intervening boundary features and the distances between the development and other neighbouring properties on [address] and [address], the proposal would also have no material effect on outlook for any other neighbouring occupiers.
The evidence before me indicates that the Council has a Householder Design Guide Supplementary Planning Document which suggests that the depth of single storey rear extensions on semi-detached houses should be limited to 4.0m. However, as the Inspector that dealt with the previous appeal pointed out, the provisions of the GPDO indicate that larger extensions may be acceptable. In this particular case, the proposal would have a depth only 1.0m deeper than the guidance and for the reasons already outlined would not be materially harmful to the living conditions of neighbouring properties.
I conclude, the development will have an acceptable relationship with the living conditions of occupiers of neighbouring dwellings with particular regard to outlook.
Whilst this prior approval appeal has not been determined on the basis of Section 38(6) of the Planning and Compulsory Purchase Act 2004, I have given regard to Policies ENV7 (Environmental Amenity) of the Hyndburn Borough Council Core Strategy (2012) and Policy DM29 (Environmental Amenity) of the LP insofar as they seek to protect the amenity of neighbouring occupiers and 1 Appeal Ref APP/R2330/D/22/3305247 are therefore relevant to my considerations. Given my conclusion, I am also satisfied that the development would not conflict with these requirements.
Section 06
Conditions
Any planning permission granted under Article 3(1) and Schedule 2, Part 1, Class A is subject to the conditions in sections A.3 and A.4. In addition, the formal decision includes within it reference to the approved plans.
Section 07
Conclusion
For the reasons given, the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 121No official casework-database value to compare
- Extracted decision date · page 1
- 4 September 2023Matches the official casework database
- Extracted site visit dates
- 22 August 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3319269
- Application reference
- 11/23/0053
- Lead case reference
- Not recorded
- Planning authority
- Hyndburn Borough Council
- Planning authority code
- E07000120
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 27 March 2023
- Valid date
- 27 March 2023
- Start date
- 3 July 2023
- Planning authority decision date
- 1 March 2023
- Appeal decision date
- 4 September 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 38047
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21