Skip to main content
Official casework recordAllowedCurrent release

Appeal 3319497

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

No verified development description has been extracted from an official decision PDF yet.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for roof extension including a hip to gable and rear dormer window. Part single storey, part two storey side/rear extension at [site address] in accordance with the terms of the application, Ref 22/4160/RCU, dated 12 August 2022, and the plans submitted with it.

  2. Section 03

    Preliminary Matters

    The description of development in the banner heading has been taken from the planning application form. The Council altered the description of the development. This is the description set out on the appeal form and a more accurate description of the appeal development and I have used it in my decision above.

    The extensions to the property have been constructed, and therefore the appeal proposal is retrospective. For the avoidance of doubt the outbuilding shown on the drawings does not form part of the appeal scheme and is not part of my considerations here.

  3. Section 04

    Main Issue

    The main issue is the effect of the development on the character and appearance of the host property and the surrounding area.

  4. Section 05

    Reasons

    The appeal property is a two storey semi-detached house on a street of similar properties. Dwellings are largely designed with hipped roofs with some variety in roof forms where hip to gable extensions have been added. The properties are evenly spaced and feature symmetrical projecting bays, which maintain a rhythm and continuity within the street scene. To the rear, many properties on [address] have dormer roof extensions and have been extended at ground level. The rear extensions are of varying design and influence the character and appearance of the area in particular at roof level where rear dormers are prominent features on properties when viewed from [address], which is at a lower land level.

    The Council conclude that the rear single and first floor extensions largely accord with a previous planning permission. Further, the hip to gable addition to the roof is considered acceptable. Based on the evidence before me and my site visit, I see no reason to disagree. The focus of the Council’s concerns is the rear dormer extension and the overall effect of the development when taken cumulatively.

    The dormer is set in slightly from the edge of the roof and finished in hanging tiles to match it, both the ground floor and first floor extensions are finished in red brick, consistent with the original house. The restrained palette of external materials unifies the development and reflects the materials in the area. IN this context the dormer window is not an incongruous or dominant feature.

    The first floor extension is relatively modest in terms of its width and is set in significantly from the shared boundary with the attached property, it also has a hipped roof that limits its bulk. At ground floor level the extension mirrors the extension on the attached property and is stepped in from the boundary. The varied widths and depths of each element of the development act to break up the structure, adding visual interest. Taking into account all of the above, the cumulative impact of the development is not considered to have a harmful impact on the appeal property.

    Further, the change in land levels restricts views of the ground floor of properties from [address]. Although upper floors and the roof lines are visible the development is not harmfully inconsistent with the prevailing pattern of development and is not incongruous or overly prominent within the street scene.

    While the development does not accord with elements of the guidance within the Barnet: Residential Design Guidance SPD 2016, for the reasons detailed above, I am satisfied that the development does not result in harm.

    I conclude that the appeal development does not have a harmful effect on the character and appearance of the host property and the surrounding area. It accords with Policy D3 of the London Plan (2021), Policies CS1 and CS5 of the [name]: Local Plan DPD (2012); Policy DM01 of the [name]: Local Plan DPD (2012). The policies are consistent with the National Planning Policy Framework which seek to secure development that is sympathetic to the local character and the surrounding built environment.

  5. Section 06

    Other Matters

    The principal elevation of most of the dwellings on [address] face the rear boundary of the dwellings on [address]. The length of the rear garden of the appeal property is such that there is a significant separation distance between the development and [address]. As such I am satisfied that the development is not harmful to the living conditions of the occupants of [address].

  6. Section 07

    Conditions

    The application is retrospective and therefore conditions relating to the approved plans and matching materials are not necessary.

  7. Section 08

    Conclusion

    For the reasons given above I conclude that the proposal accords with the development plan and therefore should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 33807No official casework-database value to compare
    Extracted decision date · page 1
    26 September 2023Differs from the official casework database
    Extracted site visit dates
    4 September 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3319497
Application reference
22/4160/RCU
Lead case reference
Not recorded
Planning authority
London Borough of Barnet
Planning authority code
E09000003

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
29 March 2023
Valid date
16 April 2023
Start date
13 June 2023
Planning authority decision date
3 February 2023
Appeal decision date
26 October 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
40893
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21