Appeal 3319730
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a part two storey and single storey rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
[name]
The above description has been taken from the planning application form although the plans clearly show the proposed development as a first floor rear element only. This is confirmed by the description on the decision notice. I have considered the appeal scheme accordingly.
Section 05
[name]
The main issues are a) whether the proposed development would be inappropriate development in the Green Belt; b) the effect of the proposed development on the openness of the Green Belt; and c) whether the harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations. If so, would this amount to the very special circumstances required to justify the proposal.
Section 06
Inappropriate Development
The National Planning Policy Framework 2023 (the Framework) sets out, in regard to Green Belts, that their essential characteristics are openness and permanence. There is a general presumption against inappropriate development in the Green Belt unless very special circumstances exist. The construction of new buildings should be regarded as inappropriate, but for certain defined exceptions. These are first set out by Paragraph 149. Specifically, and in regard to the appeal scheme, the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building might not be inappropriate development. This language is mirrored in Policy 49 of the Bromley Local Plan 2019 (LP). The term ‘original building’ is defined in the Framework as a building as it existed on 1 July 1948 or, if constructed after 1 July 1948, as it was built originally.
Policy 51 sets out, amongst other things, that extensions or alterations to dwellings in the Green Belt will only be permitted if the net increase in the floor area over that of the original is no more than 10%, as ascertained by external measurement.
The evidence suggests that the proposed development would result in an 8.2% (11 sqm) increase in the floor area over the existing situation although it is equally clear that the building has grown from what it was originally, and it is this to which Policy 51 refers. Floor area is two dimensional and is different to floor space, which can mean the sum total of multiple floors taken together. It is patently different to volume. The floor area would therefore be the footprint of the house. As it was originally for the purposes of Green Belt assessment. Taking into account what seems to be the consensus of what the original dwelling was, it strikes me that the floor area of the extended dwelling, before the appeal scheme and on visual inspection, comfortably exceeds the 10% restriction. Any new floor area would thus, no matter how small, likely fall foul of the restrictions of Policy 51.
That said, and in being purely a first floor extension, the appeal scheme would not introduce any new floor area. One could legitimately argue therefore that there would be some compliance with the development plan when considering the proposed development in isolation. Even so, Policy 49 follows the Framework in explaining that new buildings will be inappropriate unless, amongst other things, it is for the extension or alteration of a building that does not result in disproportionate additions over and above the size of the original building. When taking into account substantial extensions that have gone before, and the appeal scheme, it would be reasonable to conclude that the appeal scheme would result in such both qualitatively and quantitively.
With this in mind, the proposed development would be inappropriate development in the Green Belt, contrary to Policy 49 of the LP and the Green Belt provisions of the Framework. Their specifics and aims as I have set them out above.
Section 07
Openness
The Framework indicates that openness is an essential characteristic of the Green Belt with a fundamental aim of Green Belt policy being to prevent urban sprawl and keep land permanently open. There are two aspects to openness. These are spatial and visual. The former being taken to mean the absence of built form.
Whilst the proposals would not involve additional floor area, they would nevertheless include built form (in terms of location and overall size) where it was not before. Whilst being to the rear of the dwelling the scheme’s effect on the visual aspect of the Green Belt’s openness might be limited, there would be an unavoidable reduction in its spatial aspect. This would be harmful to the Green Belt. This harm would be as well as the inappropriateness of the proposals and further conflict with the Green Belt provisions of the Framework.
Section 08
[name]
The additional space is required for family member(s) who suffer from sleep disorders albeit there is very little evidence as to what this means in a requirement for more bedroom space. It is also unclear as to whether it could be provided in a different way. It seems that the family is struggling with space at the existing building but equally there is no compelling evidence as to why the additional space needs to be provided at the appeal building and not elsewhere. These matters would be worthy of some weight but, for the reasons I have set out, it would be limited.
I agree that the appeal scheme, in isolation, would not be significant but as I have explained, Green Belt Policy safeguards against cumulative additions in the interests of openness. This and the fact that the proposed development would use materials in keeping with the area would attract limited weight. The latter point in any case being a lack of harm rather than weighing in favour of the appeal scheme.
I am aware of the granted of a Lawful Development Certificate (LDC) at [address]. This fell to be determined on legal grounds which is different to the appeal scheme which has been considered on planning merits with regard to the development plan and material considerations. The two situations are not therefore sufficiently similar for more than limited weight to be attributed to the LDC.
Section 09
Conclusion and Recommendation
Inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. There would be further harm to the Green Belt in terms of a reduction in its openness.
I have explored the other considerations raised but given the weight they would attract, set against the substantial weight that should be ascribed to any harm to the Green Belt, makes it evident that they would not be capable of clearly outweighing said harms. The very special circumstances needed to justify the proposals do not therefore exist. This and the conflict with the development plan that would arise from the proposed development, in the absence of any sufficiently weighty material considerations to indicate to the contrary, leads me to recommend the appeal be dismissed.
Section 10
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1895No official casework-database value to compare
- Extracted decision date · page 1
- 11 October 2023Matches the official casework database
- Extracted site visit dates
- 18 July 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3319730
- Application reference
- 22/04539/FULL6
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Bromley
- Planning authority code
- E09000006
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 2 April 2023
- Valid date
- 2 April 2023
- Start date
- 27 June 2023
- Planning authority decision date
- 28 March 2023
- Appeal decision date
- 11 October 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 40071
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21