Appeal 3320055
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
first floor extension to provide additional bedroom over existing flat roof garage.
Section 02
Decision
The appeal is allowed and planning permission is granted for a first floor extension to provide additional bedroom over existing flat roof garage at [site address] , Disley [postcode] in accordance with the terms of the application, Ref 22/2977M, dated 23 July 2022, subject to the following
Section 03
conditions:
The development hereby permitted shall begin no later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: PA1 [name] (Existing and [name]); and PA2 [name] (Existing and [name])
The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those of the existing building.
Section 04
Preliminary Matters
During the course of the application the scheme was amended to set back the proposed first floor from the main front elevation of the existing dwelling ([name]: PA1 [name] and PA2 [name]). The Council determined the proposal on the basis of these amended plans. However, some six weeks before the Council made the decision on the application, further amended plans were submitted. The information before me indicates that the Council were aware of these plans but did not accept them and they are not the plans listed on the decision notice.
The appellant wishes the further amended plans to be considered as part of my consideration of the appeal and is of the view that they were submitted to overcome the Council’s concerns. They consider that there would be no harm in myself accepting such plans. The ‘Procedural Guide – Planning Appeals – England’ states that if an applicant thinks that amending their application proposals will overcome the local planning authority’s reasons for refusal they should normally make a fresh planning application and that it is important that what is considered by the Inspector is essentially what was considered by the local planning authority, and on which interested people’s views were sought.
I note that the appellant considers the plans were formally submitted and that it was the Council’s responsibility to upload them to their website and re-consult if necessary. I have some sympathy with this viewpoint. However, the fact remains that the plans did not proceed to a period of consultation.
The further amended plans in essence show an additional set back from the main front elevation and a two storey extension at the rear. Such changes are reasonably substantial in that they include an extension to the rear of the existing dwelling which I consider materially alters the proposal and the description of development. It is only appropriate to take amended plans into account if no party would be disadvantaged. [name] (Bernard) Ltd v Secretary of State for the Environment [1982] JPL 37, it was held that the main criterion is whether the development proposed is so changed by such amendments that to grant permission would be to deprive those who should have been consulted of the opportunity of such consultation.
In my view, the further amended plan is a significant amendment. The Council has relied on its delegated report, which did not encompass these changes. Moreover, I have no evidence that those who should have been consulted on the changes to the proposed development have been consulted and my consideration of the amended plans would deprive them of this opportunity. I have therefore not considered the further amended plans in my consideration of the case.
Section 05
Main Issue
The main issue of the appeal is the effect of the proposed development on the character and appearance of the area.
Section 06
Reasons
[address] is characterised by detached two storey dwellings of fairly uniform designs. The dwellings incorporate a flat roof garage to the side and a wraparound porch, both of which project forward of the main front elevation. At my site visit I saw that there were no other first floor extensions to dwellings on [address].
The proposed first floor side extension would have a slightly lower ridge height to the main dwelling and would be set back from the existing ground floor elevation of the porch and garage, which would incorporate a pitched roof. Although the proposal would be set back only slightly from the main elevation of the existing dwelling at first floor level and would fill the full width of the ground floor footprint, the proposal would be of a modest scale in comparison to the overall size of the existing building. The proposal would therefore not appear as a disproportionate addition and would be seen as subservient to the host property. Indeed, the Council’s officer report confirms that, from the front elevation, the design of the proposal would respect the scale and appearance of the existing dwellinghouse.
The Council’s main concern relates to the gap that would be retained between the side of the proposal and the side elevation of [address] (No.5) which they contend would be less than 1m from the site boundary and create a terracing effect. I saw at my site visit that there is a gap to the side boundary with No.5 and further gap between this boundary and the two storey side elevation of No.5 that, in total, amounts to more than 1m. Furthermore, due to the topography of [address], the appeal property sits at a slightly higher land level to No.5. Both these factors would ensure that the proposal would not result in a terracing effect.
I acknowledge that there is a cohesive uniformity to the houses on [address] and the gaps between dwellings at first floor level allow views towards open countryside beyond. The proposed development would result in a different design of dwelling to others and diminish a gap at first floor level. Nevertheless, the spaciousness of the area would still be evident due to the profile of the street and a small gap between dwellings would remain. Moreover, I was able to see much variance in the scale and appearance of houses in the surrounding area.
Policy BE2 of the Disley and Newtown Neighbourhood Plan 2017-2030 (NP) states that support will be given to development where the design of the building is sympathetic to the character, topography and local distinctiveness of the surrounding area. The policy also seeks that development should vary the appearance of individual houses in terms of position, character, features and materials within an appropriate palette. Consequently, I find the proposal would not be significantly at odds with the suburban character of the area.
For the reasons given above, I therefore conclude that the proposal would not harm the character and appearance of the area. Accordingly, I find no conflict with Policies SE1 and SD2 of the Cheshire East Site Allocations and Development Policies Document 2022 (SADPD), Policies GEN1 and HOU11 of the Cheshire East Local Plan 2010–2030 (CELP) or Policy BE2 of the NP. In combination, these policies seek to, amongst other things, protect the character and appearance of the area.
Section 07
Conditions
The Council has indicated the conditions that it considers would be appropriate. I have considered these in light of the Planning Practice Guidance.
In addition to the standard implementation condition it is necessary to impose a condition to identify the approved plans in the interest of precision. A condition in respect of materials is necessary in the interest of character and appearance.
Section 08
Conclusion
The proposal would accord with the development plan and there are no material considerations that indicate that a contrary decision should be taken. Therefore, for the reasons given, the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3983No official casework-database value to compare
- Extracted decision date · page 1
- 29 June 2023Matches the official casework database
- Extracted site visit dates
- 6 June 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3320055
- Application reference
- 22/2977M
- Lead case reference
- Not recorded
- Planning authority
- Cheshire East
- Planning authority code
- E06000049
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 18 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 7 April 2023
- Valid date
- 7 April 2023
- Start date
- 26 April 2023
- Planning authority decision date
- 27 January 2023
- Appeal decision date
- 29 June 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 34831
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21