Skip to main content
Official casework recordDismissedCurrent release

Appeal 3320074

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

single storey outbuilding for use as a personal gym for the dwellinghouse.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    Since it made its decision, the Council has adopted the Epping Forest District Local Plan 2011-2033. As this plan replaces the previous Local Plan, I have had regard only to the policies referred to in the decision notice from the newly-adopted plan.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed outbuilding on three protected trees.

  4. Section 05

    Reasons

    The appeal property is a two storey mid-terrace dwelling located in a residential cul-de-sac of similar properties.

    Policy DM5 of the adopted Local Plan concerns green and blue infrastructure, and includes the requirement that development proposals must be accompanied by sufficient evidence to demonstrate that the retention and protection of trees will be successfully secured in accordance with relevant guidance and best practice.

    The proposed outbuilding would be sited in the rearmost part of the host dwelling’s back garden. The main parties agree that this location is within the overlapping root protection areas (RPA) of three protected trees standing in neighbouring gardens. The two lime trees and an oak tree are mature specimens of substantial size and prominence. As such, the three trees have considerable amenity value seen from the rear gardens and wider surrounding area.

    I acknowledge that the current proposal seeks to respond to the reasons for refusal of two previous applications for an outbuilding in the same location. An arboricultural report includes recommendations for the design of the building’s foundations to protect the trees’ roots, while a construction method statement (CMS) demonstrates how these recommendations would be implemented.

    The submitted drawings show a section of the proposed building, with a notation that the ‘pile foundation will be designed by a structural engineer according to the tree report’1; and a detailed drawing of the pile foundation and slab construction is included in the CMS. However, this shows a concrete base slab that is suspended above ground level, which is not apparently the case with the submitted section drawing. Consequently, it is not fully clear how the detailed design of the foundation relates to the submitted drawings as a whole. As the Council notes, based on the available information, the detailed design of the foundations could result in a taller building on site, with consequential effects that have not been assessed.

    The arboricultural report says that ‘no underground services are to be installed through any RPA’2. However, the submitted drawings show a toilet, shower and sauna to the rear of the building, and the ‘tree constraints plan’ in the report shows the whole footprint of the proposed building within the trees’ RPAs. It is unclear, therefore, how any water supply, sewage and waste water disposal or electricity supply would be provided to the building without this having some implications for the trees’ roots.

    I note in this regard that the CMS says when the locations of the tree roots are known it would be possible to work around them when installing cables and drainage. However, in the absence of further details of the extent of any necessary works to provide services to the building, it is not possible to find that there is sufficient evidence to demonstrate that the protection of trees will be successfully secured, as required by Policy DM5.

    Therefore, for these reasons, I must conclude that the proposed outbuilding would have a materially harmful effect on three protected trees. As such, the proposal is contrary to Policy DM5 of the Epping Forest District Local Plan 2011- 2033 (2023), as described above. Policy DM3 of the Local Plan is less relevant in this case as it concerns the effects of development on landscape character.

    In reaching this conclusion I have had regard to the representation made by Lambourne Parish Council.

  5. Section 06

    Conclusion

    For the reasons given, it is concluded that the appeal should not succeed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 154No official casework-database value to compare
    Extracted decision date · page 1
    25 September 2023Matches the official casework database
    Extracted site visit dates
    19 July 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3320074
Application reference
EPF/2673/22
Lead case reference
Not recorded
Planning authority
Epping Forest District Council
Planning authority code
E07000072

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
33 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
9 April 2023
Valid date
9 May 2023
Start date
20 June 2023
Planning authority decision date
25 January 2023
Appeal decision date
25 September 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
39204
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21