Skip to main content
Official casework recordAllowedCurrent release

Appeal 3320276

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

No verified development description has been extracted from an official decision PDF yet.

  1. Section 02

    Procedural Matter

    The Council has described the development as “Single storey rear extension and first floor rear extension incorporating a rear facing Juliet balcony, part single storey part two storey front extension, existing roof removed and re-pitched with proposed office/study in roof space and 3 roof light windows to rear; new first floor side window, alterations to fenestration, replace all windows with powder coated aluminium framed windows, alterations to external materials to include vertical cedar cladding”. This more accurately describes the whole development.

  2. Section 03

    Decision

    The appeal is allowed and planning permission is granted for single storey rear extension and first floor rear extension incorporating a rear facing Juliet balcony, part single storey part two storey front extension, existing roof removed and re-pitched with proposed office/study in roof space and 3 roof light windows to rear; new first floor side window, alterations to fenestration, replace all windows with powder coated aluminium framed windows, alterations to external materials to include vertical cedar cladding, at [site address] in accordance with the terms of application ref: 3/23/0079/HH dated 18 January 2023 and subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: 20454-S001-1st (existing – plans and elevations) and 20454-P002-A (option 2:proposed plans and elevations).

    No development shall take place until samples / details of the materials to be used in the external surfaces of the development have been submitted to and approved in writing by the local planning authority. The approved details shall be used in the implementation of the development hereby approved.

    No development shall take place until full details of the front parking / garden area have been submitted to and approved in writing by the local planning authority. These details shall include the extent and details of surfacing to be installed and planting to be retained and/or provided. The development shall thereafter be implemented in accordance with the approved details.

  3. Section 04

    Main Issue

    The main issue is the impact on the character and appearance of the host dwelling, street scene and wider area.

  4. Section 05

    Reasons

    The appeal site comprises a detached modern dwelling of brick elevations and tiled roof located on the northern side of a small cul-de-sac which slopes up from the main [address] from which it is accessed. It has a single storey addition to the rear. A second dwelling of similar age and appearance is located at the end of the road, to the south of the appeal site, occupying higher land. The remaining properties to the south and south-east side of the road comprise two pairs of older more traditional style dwellings which have projecting gable fronts with roughcast render elevations and mature hedges to the front boundaries.

    The surrounding area including nearby [address], is of more varied character with a mixture of modern and traditional dwellings. These include two new contemporary dwellings of white render and grey brick elevations as well as a small estate of modern dwellings which whilst of more ‘traditional’ design, incorporate white render and brick elevations with grey tiled pitched roofs.

    Policy HOU11 of the East Herts District Plan (2018) (EHDP) states that in addition to being of a size, scale, mass, form, siting, design and materials appropriate to the character, appearance and setting of the existing dwelling and surrounding area, extensions and alterations to dwellings should also generally appear as a subservient addition to the dwelling.

    The overall size of the extensions would not be significantly greater in floorspace terms, the main additional areas being the first floor rear extension and the office/study created in the enlarged roofspace and in that respect the proposal would be subservient. However, the increased roof height and resultant additional roof bulk could not be considered subservient; but the proposed extensions effectively result in a redesign of the existing dwelling and, in my opinion, the issue is whether the enlarged dwelling would be appropriate to the character and appearance of its setting and the surrounding area having regard to the factors set out in the relevant policy.

    The proposed extensions and alterations would result in a dwelling of greater scale and bulk than existing and the increased roof height together with the side and rear first floor additions would be clearly visible in the street scene in approaches from the entrance to the cul-de-sac from where its elevated position is most noticeable.

    Notwithstanding these visual impacts, I do not consider that the extended dwelling would appear unduly prominent; it would maintain the same setback from the road frontage and the increased ridge height would not be significantly higher and would be seen against the dwelling at the top of the cul-de-sac in respect of which it occupies a lower position.

    The proposed external materials would be quite different from the existing brick elevations with a dark grey rendered finish to the ground floor elevations, vertical cedar cladding to first floor and a natural slate roof. Whilst these external materials would contrast with the external appearance of the other dwellings in the cul-de-sac, they would complement the proposed design of the extended dwelling. Furthermore, as noted above, there is a much greater variation to the street scene in the wider area encompassing [address] and the proposal would not appear incongruous in this context.

    Overall, I find that the proposal would be well designed, and whilst resulting in a larger dwelling of different external appearance to those within the immediate street scene, would nevertheless be appropriate in the wider, more varied setting. Indeed, I consider that it would add interest to the street scene.

    I therefore find that the proposal would not be harmful to the character and appearance of the host dwelling, street scene or wider area and it would accord with [name] HOU11 and DES4 which in addition to the above seek a high standard of design to reflect and promote local distinctiveness that respects or improves upon the character of a site.

    With regard to the National Planning Policy Framework (the Framework), I consider that the proposal would comply with relevant policies that seek to achieve good design, by adding to the overall quality of the area and being sympathetic to the surrounding built environment.

  5. Section 06

    Conditions

    A condition to ensure that the proposal complies with the approved plans is necessary in the interests of clarify and proper planning. Whilst the plans indicate the materials to be used, given that these will be new, a condition to require samples/details of the materials to be used in the external surfaces is necessary in the interests of visual amenity. Given the comments of the Council’s highway officer and others and lack of detail shown on the plans, a condition is also necessary to require details of how the front parking and garden area is to be treated in the interests of highway safety and visual amenity.

  6. Section 07

    Conclusions

    I therefore conclude that this appeal should be allowed and planning permission granted.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 482No official casework-database value to compare
    Extracted decision date · page 1
    24 August 2023Matches the official casework database
    Extracted site visit dates
    1 August 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3320276
Application reference
3/23/0079/HH
Lead case reference
Not recorded
Planning authority
East Hertfordshire District Council
Planning authority code
E07000242

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
13 April 2023
Valid date
13 April 2023
Start date
28 June 2023
Planning authority decision date
16 March 2023
Appeal decision date
24 August 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
37670
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21