Skip to main content
Official casework recordDismissedCurrent release

Appeal 3320434

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

4 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a garden building.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect on the character and appearance of the area.

  3. Section 04

    Reasons

    The garden building is already in place. It is screened in some views by the high hedge. In longer views only the roof form is visible. Its dark colour helps to reduce the impact of the eaves in these views. However, the building is clearly apparent above the side fence when approaching along [address] from the west; and through the gaps in the hedge when travelling north along [address]. In these views, it appears as an incongruous and dominant addition, particularly given the corner location. It also appears cramped within the garden area given its proximity to the conservatory. [name] note the suggested material changes, a structure of this size, in this location, would result in harm to the character and appearance of the area, regardless of the facing materials. It represents poor design in this particular context.

    Given the above, the building conflicts with the design objectives of policy CG3 (parts 1, 2 & 3) of [name] 2011. As this policy generally accords with the design aspirations of the National Planning Policy Framework, I afford it full weight. I note the reference to policy RA2 but consider policy CG3 to be of most relevance. The council’s Supplementary Planning Document - [name] 2012 does not appear to refer to garden rooms.

    Reference has been made to the potential to include a condition requiring the retention of the high hedge. Such conditions can be problematic in these circumstances as the remedy to a breach of condition that involves a height www.planningportal.gov.uk/planninginspectorate Appeal Decision: APP/N4205/D/23/3320434 reduction or removal of the hedge would be to require that it be allowed to grow back to the original height or that it be replaced. In both cases, this would increase the exposure of the building to greater view, possibly for a significant period unless some temporary intermediate screening solution was accepted. In any event, the building is not acceptable even with the hedge in place at its current height.

    It is suggested that a building that would not require planning permission could be built using permitted development rights. It has not been demonstrated what changes would be required for the building to fall within the permitted development tolerances but it would appear that these may be significant. In the absence of a certificate of proposed lawful development; and as this building clearly requires consent, limited weight can be afforded to the potential for a smaller structure to be built.

    I do afford weight to the benefits of the building given the improved living space that it provides and the economic investment that has taken place. I also afford some weight to the support offered by local residents.

    Overall, the proposal would result in harm to the character and appearance of this area. I conclude that the matters that weigh in favour of the development are not sufficient to outweigh this concern. I therefore dismiss the appeal.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 341No official casework-database value to compare
    Extracted decision date · page 1
    19 June 2023Matches the official casework database
    Extracted site visit dates
    22 May 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3320434
Application reference
15137/22
Lead case reference
Not recorded
Planning authority
Bolton Metropolitan Borough Council
Planning authority code
E08000001

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
29 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
16 April 2023
Valid date
16 April 2023
Start date
25 April 2023
Planning authority decision date
1 March 2023
Appeal decision date
19 June 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
34199
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21