Skip to main content
Official casework recordDismissedCurrent release

Appeal 3320724

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a detached swimming pool.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    Since the determination of this application, the Government published a revised National Planning Policy Framework (the Framework) on 19 December 2023. Those parts of the Framework most relevant to this appeal have not been amended. As a result, I consider that there is no requirement for me to seek further submissions on the revised Framework, and I am satisfied that no party’s interests have been prejudiced by my taking this approach. [name] have referred to provisions of the Framework below, I have done so with numbering from the revised version.

  3. Section 04

    Main Issue

    The main issues are:

    whether the proposal would be inappropriate development in the Green Belt having regard to the Framework and any relevant development plan policies;

    the effect on the openness of the Green Belt; and

    whether any harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances necessary to justify the proposal.

  4. Section 05

    Whether the proposal constitutes inappropriate development

    The appeal site comprises a detached dwelling set within a sizeable plot with long, rear garden. While the garden currently features detached outbuildings, these are largely grouped towards the north of the garden in close proximity to the main dwelling. Coupled with the overall dimensions of the garden, this ensures that the site remains a spacious plot that, even acknowledging the residential nature of the surrounds, provides a clear sense of openness in this location. The proposal seeks to erect a further detached, single storey outbuilding at the site.

    The site is located in the Green Belt. While reference has been made to Policy BAS GB1 of the Basildon District Local Plan Saved [name] 2007, this relates to Green Belt boundaries, an issue which is not in dispute in this case. Nevertheless the Framework is a material consideration, and states at paragraph 154 that construction of new buildings in the Green Belt should be regarded as inappropriate development which is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. Although this is subject to a number of exceptions, there is no suggestion before me that any of these are applicable in this case and, based on my observations, I have no reason to conclude otherwise.

    Accordingly, as the construction of a new building within the Green Belt, the proposal would be inappropriate development. It would, by definition, be harmful to the Green Belt and should not be approved unless very special circumstances apply.

  5. Section 06

    Impact on openness

    The Framework states that “the fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open; the essential characteristics of Green Belts are their openness and their permanence.” It has been established that openness has both a spatial and visual aspect.

    From both a spatial and visual perspective, the development would inevitably lead to a reduction in the openness of the Green Belt by introducing an outbuilding on a portion of the site that is currently free from permanent built development. Although close to the other outbuildings, it would bring the arrangement of permanent built form at the site further south, into a more notably open section. Even acknowledging its backland nature and the scale of the site, introduction of such permanent built form in this position would interrupt currently open views within the immediate vicinity. This would cause harm to the openness of the Green Belt from both a spatial and visual perspective.

    I acknowledge the existence of a Lawful Development Certificate in respect of an outbuilding in the same position, and with the same design, as the proposal. However, on the evidence before me at its highest point this would be some 1.025m lower than the proposal. I note that the hipped roof design means that the additional height across the proposal would not always be to the same amount, and that the eaves height would remain unchanged. Nevertheless, the proposal would overall be of a greater height and bulk than the outbuilding that is the subject of this Lawful Development Certificate, thereby further disrupting the openness of the Green Belt and causing further harm in this regard from both a spatial and visual perspective.

  6. Section 07

    Other Matters

    The main parties agree that the proposal would not result in harm with regard to character and appearance, living conditions or highway safety. This represents a lack of harm, which is neutral in the planning balance.

    The appellant suggests that the increased height is necessary to match the roof pitch of a current outbuilding at the site and to enable the same roof tiles to be placed on both outbuildings, creating an aesthetically pleasing and consistent design. While this represents a slight benefit of the scheme, it remains that the Lawful Development Certificate requires materials to be similar to those existing, such that even with a lower roof pitch the outbuilding that is subject to this certificate would not appear unduly out of place. Accordingly, this benefit carries little weight.

    No objections to the proposal have been received from residents of surrounding properties or from the Environmental Health consultees. Nevertheless, it remains that the proposal would cause harm for the reasons outlined.

  7. Section 08

    Whether Very Special Circumstances Exist

    The Framework establishes that substantial weight should be given to any harm to the Green Belt. When taken cumulatively the other considerations advanced in support of the scheme, including the existence of the Lawful Development Certificate, attract limited weight and this is not sufficient to clearly outweigh the substantial harm to the Green Belt. Consequently, the very special circumstances that are necessary to justify inappropriate development in the Green Belt do not exist and the proposal would fail to comply with the provisions of the Framework.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 816No official casework-database value to compare
    Extracted decision date · page 1
    17 January 2024Matches the official casework database
    Extracted site visit dates
    15 January 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3320724
Application reference
23/00046/FULL
Lead case reference
Not recorded
Planning authority
Basildon District Council
Planning authority code
E07000066

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
119 m²
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
20 April 2023
Valid date
20 April 2023
Start date
1 August 2023
Planning authority decision date
6 March 2023
Appeal decision date
17 January 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
44899
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21