Skip to main content
Official casework recordSplit DecisionCurrent release

Appeal 3320887

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as extension and internal/external alterations to the existing house. Conversion of the loft space to provide additional accommodation.

  1. Section 02

    Decision

    The appeal is dismissed insofar as it relates to the part single storey, part two storey rear extension, replacement of the existing pitched roof with a flat roof, and the raising of the roof ridge height to include insertion of a rear dormer window with obscured glazed door to facilitate conversion of loftspace into habitable accommodation.

    The appeal is allowed insofar as it relates to the erection of canopy to front elevation and planning permission is granted for the erection of canopy to front elevation at [site address] in accordance with the terms of the application, Ref 22/03101/FPH, dated 30 November 2022, so far as relevant to that part of the development hereby permitted and subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: 1181 PL01 B – Site Location Plan, 1181 PL 02 C – Site Layout (inc Roof Plan) [name] and Proposed, 1181 PL 03 D – Floorplans and Elevations – [name].

  2. Section 03

    Procedural Matters

    The description of development in the banner heading above is the original description of the development as set out on the application form. Whilst neither of the main parties has provided written confirmation that a revised description of development was agreed, the description of development from the Council’s decision notice more accurately describes the development. I have therefore used that description in my formal decision.

    In determining the planning application, the Council has issued a split decision to grant planning permission for part of the development for the erection of canopy to the front elevation and refusing planning permission for the dormer window, rear extensions and replacement of rear gable with flat roof. Appeals following split decisions are dealt with under Section 78 of the Town and Country Planning Act 1990 (The Act) as being against the refusal of planning permission. In such cases and in accordance with Section 79(1)(b) of The Act, the whole proposal is before me to determine.

    For the reasons that follow, I find the erection of the front canopy to be acceptable. As it is clearly severable, both physically and functionally, from the rest of the proposal, I intend to issue a split decision and grant permission for the front canopy only.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the house and the local area.

  4. Section 05

    Reasons

    The appeal site comprises a two storey detached house with two storey front and rear projections which each have a prominent gable roof. Although the house has been altered, the gable roofs are a key component of the appearance of the house. The surrounding area is residential in character and there is some diversity in the housing. Whilst houses on this side of the road vary in terms of design, there is general uniformity in scale and arrangement as houses are sat within large plots set back from the road.

    The dormer window would extend across the majority of the width of the roof plane, despite being set in from the sides of the roof slope. Whilst it would be no higher than the roof ridge, it would create a large flat-roofed dormer at a height just below the ridge of the roof which would not be visually subservient. I accept that the depth of the dormer window would be less than the depth of the first floor extensions, however, this would not mitigate the lack of visual subservience.

    Due to a combination of its height, width and scale, the dormer window would have an overly bulky appearance and would dominate the rear elevation and roof of the house, which would be a stark contrast with the simple form and proportions of the existing roof.

    The flat roof design of the first floor extensions would be at odds with the pitched roof characteristics. As such, even accounting for the use of acceptable matching materials, the extensions would not integrate well with the existing architectural detailing of the house. The replacement of the gable roof with a flat roof would also result in the loss of this attractive existing feature and would therefore erode part of the house's distinctive character.

    The design of the dormer window and first floor extensions would therefore fail to respect the established roof form of the house and would adversely change its appearance.

    At my site visit, I saw that whilst there are differences in appearance, the properties on either side of the house have similar roof pitches with gable ends. This similarity of gable roofs produces a pleasing element of design continuity between the house and its neighbours, despite the differences. However, this shared continuity would be broken through the loss of the rear gable roof.

    The neighbouring properties appear to have generally retained their pitched roof characteristics, and I could not see any examples of flat roof first floor rear extensions within the immediate setting of the appeal site. I accept that the absence of similarities within the immediate locality does not render an extension inappropriate. However, the presence of the flat roof extensions would appear highly noticeable and incongruous in this immediate context where there is a broad consistency of upper-floor pitched roof forms. Subsequently, given the local character, the first floor extensions would not be sympathetic additions.

    My attention has been drawn to two sites in the area where buildings have flat roofs. One of the sites relates to a large block of flats which is a stand-alone building that has a unique appearance where flat roofs appear to be part of the original design. This site is therefore not comparable to the appeal site in terms of its characteristics. The other site relates to a terraced row of a more recent housing development which is on the other side of the road and would not be viewed in the context of the appeal site. As such, these examples do not establish a context to justify the proposed flat roof design.

    In the context of the appeal site, the rear of the house is not visible from public views, however, it is visible from the rear gardens of the immediate neighbours. As such, the visual harm from the discordant nature of the development would be easily seen and noticed from these neighbouring garden areas.

    For these reasons, I find that the dormer window, first floor extension and the replacement of the rear gable with a flat roof, would cause significant harm to the character and appearance of the house and the local area and would therefore fail to comply with Policy D2 of the North Hertfordshire Local Plan 2011 – 2031 (the LP). Whilst the house is not within a conservation area, nor is it subject to any design prescriptions, this policy amongst other things, requires house extensions to be sympathetic to the existing house in form, proportions and roof type, regardless of any designation. The proposal would also conflict with Paragraph 130 of the National Planning Policy Framework, which along with other things, seeks development that is visually attractive and sympathetic to local character.

    Separately, the erection of the canopy to the front elevation would have a neutral effect on the character and appearance of the house and the local area. This element would therefore comply with Policy D2 of the LP.

  5. Section 06

    Other Matters

    I note that the appellant made changes to the proposal following advice from the Council, however this does not alter or outweigh my finding.

    The Council has not raised any concerns regarding the proposal's impact on the living conditions of neighbouring occupants. From my site visit, I am content that the development would not result in unacceptable harm in this regard. Nevertheless, a lack of harm in this respect is a neutral consideration that does not weigh in favour of the development.

  6. Section 07

    Conditions

    I have imposed the statutory implementation condition and a condition listing the approved plans to provide certainty.

  7. Section 08

    Conclusion

    The proposed development insofar as it relates to the dormer window, first floor extension and the replacement of the rear gable with a flat roof, would conflict with the development plan, read as a whole and there are no other considerations, including the provisions of the Framework, which outweigh this finding. Therefore, I conclude the appeal should be dismissed insofar as it relates to the dormer window, first floor extensions and replacement of the rear gable with a flat roof.

    Separately, I conclude that the development insofar as it relates to the erection of the canopy to front elevation, would comply with the development plan. Therefore, the appeal should be allowed insofar as it relates to the erection of the canopy to front elevation.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5346No official casework-database value to compare
    Extracted decision date · page 1
    10 November 2023Matches the official casework database
    Extracted site visit dates
    4 October 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3320887
Application reference
22/03101/FPH
Lead case reference
Not recorded
Planning authority
North Hertfordshire District Council
Planning authority code
E07000099

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Split Decision
Decision category
Split decision
Received date
24 April 2023
Valid date
24 April 2023
Start date
3 August 2023
Planning authority decision date
1 February 2023
Appeal decision date
10 November 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
41779
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21