Skip to main content
Official casework recordAllowedCurrent release

Appeal 3320928

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a roof extension over the existing raised ground floor, with matching painted timber sash windows, stucco front elevation and stock brick rear and side elevations.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a roof extension over the existing raised ground floor, with matching painted timber sash windows, stucco front elevation and stock brick rear and side elevations at [site address] , Kensington and Chelsea, London W10, in accordance with the terms of the application [name]/23/00025, dated 22 December 2022, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: PD01.1, PD01.2, PD01.3, PD02, PD03 and PD04.

    During construction of the development hereby permitted the sustainable drainage system set out in the report by [name] shall be fully implemented and maintained thereafter.

    The windows in the development hereby permitted shall be timber framed, white painted, double hung sliding sashes with integral glazing bars and so maintained.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the appeal dwelling and that of the local area, with reference to the [address] -St Quintin Conservation Area (the CA)

  3. Section 04

    Reasons

    The appeal dwelling occupies a flat roofed two storey building attached to the side of a larger multi-unit substantial residential building. It appears as a set-back, plainly designed, subservient side element of this larger property, with a single storey entrance porch at lower ground floor level. The front is finished in white stucco with London stock brick to the side and rear elevations.

    The appeal dwelling is in a tree lined street predominantly made up of substantial detached 19th Century residential properties. This is located within the CA, recognised as a heritage asset through its designation by the Council. [address] - St Quintin Conservation Area Appraisal (2021) (The CA Appraisal) sets out that the significance of which rests in its substantially unaltered good quality mid-Victorian and later residential architecture that provides for cohesive streetscapes.

    In line with the duty imposed on me by section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990, I have given considerable importance and weight to the desirability of preserving or enhancing the character or appearance of the Conservation Area.

    The proposed extension would result in a building a storey taller but of the same architectural expression as existing. This would be achieved by the proposed extension sitting entirely above the existing raised ground floor of the appeal dwelling, replicating its scale, external appearance and materials. The existing parapet detailing would also be replicated at the top of the proposed extension and removed from the top of the existing ground floor. A blue/green roof is also proposed to reduce rainwater runoff as part of a sustainable drainage system.

    To present an evenly spaced and symmetrical window arrangement, the proposal also includes additional and realignment of windows in the rear upper ground floor elevation. This arrangement would also be replicated in the rear elevation of the proposed extension, resulting in the alignment of windows in the rear elevation as a whole. The proposal would also replicate the detailed design of the existing timber framed sash windows.

    The proposal would be of a scale in relation to the appeal dwelling that that it would appear as a subservient addition, and the appeal dwelling would continue to appear to be subservient to the larger building to which it is attached. By replicating the design of the existing it also appears as a complimentary and harmonious addition. In combination, this results in the appeal dwelling appearing as complete and proportionate rather than as a squat and under scaled building, especially in relation to its attached neighbour and the rest of the substantial residential buildings in the street.

    The CA Appraisal recognises that the gap in the skyline, between the building to which the appeal dwelling is attached and the neighbouring building, is a feature in the local streetscape of otherwise closely positioned substantial detached houses. Although the proposed extension infills some space above the appeal dwelling, it would not intrude into the skyline defined by the surrounding taller buildings. The proposal would also not reduce the side gap between the appeal dwelling and its nearest detached neighbour. As such, I find that, although the space above the existing building would be partially infilled, the gap in the skyline would be substantially retained and would retain the effect of this gap on the character and appearance of the local area and the significance of the CA.

  4. Section 05

    Other Matters

    Other interested parties have raised concerns with regard to the effect of the proposal on the living conditions of neighbouring residential occupiers, with reference to outlook and privacy and loss of light. Given the scale of the proposed development and distances involved, the proposal would not result in an additional degree of overlooking or impact on outlook or light, and reflects the relationship between buildings that is to be expected in a developed residential area of this type. I find, therefore, that the proposed development would not result in any significant harm to the living conditions of neighbouring residential occupiers.

    For the reasons given above, I find that proposal would not result in any significant harm to the character and appearance of the appeal dwelling and that of the local area, leaving the significance of the CA preserved. This would accord with Policies CL1, CL2, CL3 and CL11 of The Royal Borough Kensington and Chelsea Local Plan (2019), which seek to ensure that development is architecturally sympathetic to the age and character of the host building, reinforces their original integrity, does not harm the character and appearance of the existing building, respects the existing views, is of high architectural and urban design quality and preserves or enhances the appearance and character of conservation areas. For these reasons the developments proposed would also not accord with Policies D3 and HC1 of the London Plan (2021) and sections 12 and 16 of the Framework.

  5. Section 06

    Conditions

    I have had regard to the Council’s suggested conditions should I allow the appeal. I have not included the suggested pre-commencement condition regarding submission and approval of a Site Construction Management Plan, as the scale of the development does not justify such a condition and would be unnecessary. As such, there are no exceptional reasons for a pre-commencement condition and this suggested condition would not meet the requirements for conditions set out in the National Planning Policy Framework (2023).

    Along with the standard condition of the timing of the development, I have, in the interests of design quality included conditions requiring compliance with approved drawings and white painted timber sash windows. To reduce flood risk, I have also attached a condition requiring implementation of a sustainable urban drainage system.

  6. Section 07

    Conclusion

    The appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 209No official casework-database value to compare
    Extracted decision date · page 1
    10 November 2023Matches the official casework database
    Extracted site visit dates
    27 October 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3320928
Application reference
PP/23/00025
Lead case reference
Not recorded
Planning authority
Royal Borough of Kensington and Chelsea
Planning authority code
E09000020

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
24 April 2023
Valid date
12 May 2023
Start date
4 August 2023
Planning authority decision date
20 April 2023
Appeal decision date
10 November 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
41780
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21