Appeal 3321090
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the construction of a rear part single, part double storey extension without complying with a condition attached to planning permission Ref 20/AP/2716, dated 24 December 2020.
Section 02
Decision
The appeal is allowed and planning permission is granted for the construction of a rear part single, part double storey extension at [site address] in accordance with the application Ref 22/AP/3750 made on the 28 October 2022 without complying with condition No. 1 set out in planning permission Ref 20/AP/2716 granted on 24 December 2020 by the Council of the London Borough of Southwark but otherwise subject to the following
Section 03
conditions:
The development hereby permitted shall begin not later than 3 years from the date of the original decision, that being 24 December 2020.
The development hereby permitted shall be carried out in accordance with the following approved plans: Existing/[name] – [name] P003 (dated 19/01/23); Existing/[name] – [name] P006.
The materials to be used in the implementation of this permission shall not be otherwise than as described and specified in the application and on the drawings hereby approved unless the prior written consent of the local planning authority has been obtained for any proposed change or variation.
The flat roof of the single storey rear extension hereby permitted shall not be used other than as a means of escape and shall not be used for any other purpose including use as a roof terrace or balcony or for the purpose of sitting out.
The dwelling shall not be occupied until details to demonstrate how the highest standards of fire safety would be achieved, have been submitted to, and approved in writing by the local planning authority, unless, and to the satisfaction of the local planning authority, it can be demonstrated that there is reasonable justification for an exemption. The approved details shall be implemented prior to occupation of the dwelling and shall thereafter be retained as such at all times.
Section 04
Preliminary Matters
The application subject to this appeal is for a minor material amendment1. It seeks approval of revised but not substantially different design to an extension approved in December 20202. This type of application is possible as a condition was imposed on the original permission specifying the approved plans. The appeal seeks removal of the condition and replacement with a condition specifying the plans that reflect the amended design.
The development that has taken place has breached condition 1 which requires that the development shall be carried out in accordance with the following approved plans; 13CHD P-02 [name] - Proposed 22/10/2020 and 13CHD P-04 [name] - Proposed 24/11/2020.
The appellant seeks to vary the approved plans to require that the development shall be carried out in complete accordance with the details shown on the submitted plans, Existing/[name] – [name] P003 (dated 19/01/23); Existing/[name] – [name] P006.
The Council are of the view that the development that has been carried out on site is not the same as in the currently proposed plans. I observed on my site visit that the development that had been undertaken appeared to be the same as the submitted plans. Either way, I have considered the appeal on the basis of the submitted plans. It is not within the confines of this appeal for me to provide legal confirmation that the development which has been undertaken is the same as that shown on the submitted plans.
Section 05
[name]
The main issues are 1) the effect that varying the condition would have on the living conditions of occupants of [address] with regard to outlook, and
whether or not the development would achieve the highest standards of fire safety.
Section 06
Reasons
The appellant’s evidence sets out the differences between the approved plans and the plans that are sought to replace the approved plans, and the appellant has summarised the amendments to include; increasing the depth of the 1 [name] options for planning permissions: Guidance, March 2014 (Ministry of Housing, Communities & Local Government) 2 Planning permission ref: 20/AP/2716 ground floor element of the two storey rear extension by 0.5m and increasing the ridge height of the two storey rear extension by 0.13m and the width by 0.76m; altering the ground floor rear doors and replacing the first floor rear window with a Juliet balcony; and reducing the height of the single storey ground floor rear extension by 0.2m and centring the roof lantern.
The appeal property is a two-storey double fronted end of terrace dwelling. It is located on the southern side of [address]. Many of the surrounding properties have two and single storey rear extensions that creates small gaps between the rear and sides of properties before opening out into the rear garden.
The proposed amendments to the approved scheme would increase the projection of the ground floor element of the two-storey section. Given its overall height and siting, this would not cause harm to the outlook of any surrounding residential properties.
The increase in the overall height is by a relatively minor amount. The increase in the width of the two-storey section would, however, bring this bulk of the extension closer to no. [address] than the approved scheme. A reasonable separation from no. [address] of approximately 4 metres would, however, be maintained. Although the extension would be visible from the property and its garden, this separation combined with the overall scale, siting and mass of the extension would not cause unreasonable harm in terms of the outlook from the property nor would it result in an unreasonable sense of enclosure.
The proposed development would conflict with the Residential Design Standards Supplementary Planning Document (SPD) (2011 (Updated 2015)) which outlines that rear extensions should not exceed 3 metres in height to prevent a feeling of enclosure and that 3 metres is usually the maximum depth that can be added. This would also apply to the extant consent and despite the conflict, I have found that the circumstances of this case are such that the impact would not be unreasonable.
The Council have referred to conclusions made by an Inspector in a previous appeal. It is clear however in the evidence that there are differences from the scheme previously considered and the scheme before me. Either way, I am not bound by the previous decision and have drawn my own conclusions based on the evidence before me and my observations on my site visit.
The variation of the disputed condition would therefore not have an unacceptable impact on the living conditions of occupants of no. [address] with regard to outlook. It would comply with Policy P56 of the Southwark Plan (2022) and Policy D4 of the London Plan (2021) which outline, amongst other things, that development should not be permitted when it causes an unacceptable loss of amenity to present or future occupiers or users, having regard to, amongst other things the outlook of occupiers. It would also comply with the requirement of the National Planning Policy Framework (2021) that development achieves a good standard of amenity.
Although the proposed development would conflict with the [name] in terms of its height and projection, it would comply with the guidance that outlines that extensions should not unacceptably affect the amenity of neighbouring properties. This includes outlook.
Section 07
[name]
The Council also refused planning permission as they considered the [name] that was submitted was incomplete and no justification was provided as to why the proposal would be exempt from a Planning Fire Safety Strategy. The Council considered that the proposal, therefore, failed to demonstrate how it would achieve the highest standards of fire safety in line with the requirements of Policy D12(A) ([name]) of the London Plan (2021).
This policy sets out the criteria that development should achieve to ensure they achieve the necessary standards of fire safety. For a householder development such as this, it is possible for developers to submit a [name] in the event that the current fire safety measures are appropriate and will not be adversely affected by the development.
In the current appeal, I observed on my site visit that although the dwelling was furnished it did not appear to be occupied. I recognise that the development amounts to the extension of an existing dwelling and there is nothing unusual about its layout or means of access. I also acknowledge that, as outlined in the supporting text to Policy D12, the matter of fire safety compliance is also covered by [name] of the Building Regulations.
Having regard to these factors, I consider that it would be appropriate to impose a planning condition preventing occupation of the property until the appellant has submitted details to demonstrate how the highest standards of fire safety would be achieved, unless, and to the satisfaction of the local planning authority, the appellant can demonstrate there is reasonable justification for an exemption.
Through imposing this condition, the development would comply with the requirements of Policy D12 of the London Plan (2021) in relation to fire safety.
Section 08
Other Matters
Objections were received in relation to the loss of light. This is not pertinent to the main issue and did not form part of the Council’s reasons for refusal. Given the siting of the extension, combined with the orientation of the properties in a southerly direction, compared to the extant consent, I do not consider that the amendments would cause an unreasonable loss of daylight or sunlight. I note that the Council were of the same view.
Representations received refer to the planning history as it relates to the rear extension. I acknowledge that repeated notifications of applications, including where development has been undertaken that is not in accordance with previously approved plans, can be of frustration to interested parties. However, these do not provide a reason to dismiss the appeal where I have found the proposed development to be acceptable on its own merits.
It is considered in representations that allowing the amendment would encourage others to do exactly what they want regardless of existing laws and regulations. The planning process does not preclude retrospective applications. Developers carrying out work without, or in breach of, the appropriate consent do so at their own risk. I have confined my decision to the plans before me, including having regard to the extant consent and other material planning considerations.
Objection has been received in relation to the impact on privacy. The matter of privacy is not pertinent to the main issue and did not form part of the Council’s reasons for refusal. The level of overlooking is, however, not considerably greater than that of the previously approved first floor window. The design does not allow for wide ranging views, and I do not consider that this element of the development causes unacceptable harm. In line with the Council’s suggested condition, I have imposed a condition preventing the use of the flat roof as a balcony.
The appeal property is situated within the [address] Conservation Area (HGCA). I have had regard to Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990, which requires that special attention be given to the desirability of preserving or enhancing the character or appearance of a conservation area.
The significance of the HGCA is widely experienced, so proposals must be judged according to their effect on it as a whole and must therefore have a moderate degree of prominence. Given that the proposal relates to development to the rear of the property, of which there would be limited visibility from within the street scene or other public areas, it would not be detrimental to the character and appearance of the HGCA and thus preserve its significance. I note that the Council did not refuse planning permission in relation to heritage matters.
Section 09
Conditions
In addition to the standard time limit condition (amended to relate to the original consent), I have imposed a condition reflecting the variation to the list of approved plans. I have retained the non-disputed condition in relation to matching materials, in the interests of the character and appearance of the area.
Having regard to the introduction of policies relating to fire safety since the original decision, I have imposed a condition requiring the submission of details of how the dwelling will achieve the highest standards of fire safety.
In light of the amended design, I have imposed a condition restricting the use of the flat roof of the single storey rear extension. This is in the interests of the living conditions of occupants of surrounding residential properties in relation to privacy.
Section 10
Conclusion
For the reasons outlined above, and taking into account all other matters raised, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 145No official casework-database value to compare
- Extracted decision date · page 1
- 31 July 2023Matches the official casework database
- Extracted site visit dates
- 9 June 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3321090
- Application reference
- 22/AP/3750
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Southwark
- Planning authority code
- E09000028
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 26 April 2023
- Valid date
- 26 April 2023
- Start date
- 10 May 2023
- Planning authority decision date
- 17 March 2023
- Appeal decision date
- 31 July 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 36413
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21