Skip to main content
Official casework recordDismissedCurrent release

Appeal 3321304

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

single storey rear extension, front & rear dormer.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name] and Main Issue

    The Council advises that it has no objection to the proposed rear dormer and single storey rear extension. Based on all that I have seen and read, I have no reason to disagree. Hence, the main issue of this appeal is the effect of the proposed front dormer on the character and appearance of the area.

  3. Section 04

    Reasons

    The appeal site comprises a 2-storey semi-detached dwelling in an elevated position. The surrounding development consists of differing residential styles, ages and forms with varying separation distances between them. This arrangement, combined with the maturely planted frontages contributes positively to the spacious and pleasant character of the street scene.

    The Residential Design Supplementary Planning Document 2005 (SPD) advises that dormer windows are generally rare in [site address] , will often be unacceptable on the front elevation of houses, and should be positioned to the rear of dwellings where they cannot be seen clearly.

    The proposed dormer window would extend across almost the full width of the main front roof slope of the appeal site. Although set back from the eaves, the proposed box form, width and position high up at the top of the roof, would result in a top-heavy and dominant feature. The flat roof form would be at odds with that of the appeal property and the general uniformity of pitched roofscapes within the street scene. In this regard, it would not harmonise with the parent building as required by the [site address] [name] (2018). The minimal set down from the ridge of the roof would not be perceptible from the street scene due to the elevated position. Nor would it be seen as a smaller part of an extended roof form, given that the 2-storey side extension is deeply recessed from the main front roof slope. Instead, the development due to its form and scale would appear as an incongruous addition drawing the eye to a negative degree, that the use of matching materials and balance of solid to void elements would not mitigate.

    Whilst not a terrace, the host dwelling is part of a pair of semi-detached properties that share a consistent roof plane. The dormer window would unbalance the largely retained symmetrical appearance of the semi’s, particularly at roof level. Having a different context to the proposal, the dormer window to No [address] is to the rear and only partially visible.

    The boundary wall and raised bank to the front of the appeal site would be insufficient to prevent the proposed dormer from being readily seen in southward views along [address], including those afforded to pedestrians and residents accessing the garages opposite. Planting including evergreen species would offer screening in views to the north. However, the planting is primarily located on third party land such that its retention cannot be ensured.

    Roofscapes along [address] are predominantly plain and uninterrupted. Where dormers are present, they are infrequent, belonging to detached dwellings and of a dual pitched roof construction, forming a subservient element of the overall roof1. As such they differ from the proposal before me. A box dormer has been added without planning permission to [address], a semi-detached property to the north of the appeal site. This dormer window has a horizontal emphasis contrasting with the vertical proportions of the host dwelling, and thus appears as an incongruous addition unbalancing the pair of semi-detached dwellings. The presence of unsympathetic development does not justify further harm, even in an area that is mixed in character.

    The proposed front dormer window would have an adverse effect on the character and appearance of the area. It would therefore conflict with Policies S1 and EQ6 of the [site address] Local Plan 2016 (HPLP) which seek to ensure that development contributes positively to an area’s character and identity, in terms of amongst other things, scale and appearance, objectives shared with the [name] and SPD. Conflict is also found with paragraph 130 of the National Planning Policy Framework (the Framework) which requires developments to be of a high-quality design and sympathetic to local character.

  4. Section 05

    Other Matters

    Suggestion is made that paragraph 14 of the Framework and Policy S1a of the HPLP indicate that presumption should be made in favour of the development. Paragraph 14 relates to housing proposals and neighbourhood plans, neither of which are applicable here. Regardless, the Framework is clear that the presumption in favour of sustainable development, does not change the statutory status of the development plan as the starting point for decision making. Where a proposal conflicts with an up-to-date development plan, permission should not usually be granted unless material considerations indicate that the plan should not be followed. Whilst there may be support for residential extensions within the HPLP and SPD, such support is not without qualification. The proposal conflicts with development plan policy in respect of scale, form and position.

  5. Section 06

    Conclusion

    For the reasons given above, having considered the development plan as a whole, and all other considerations, the appeal is dismissed. [planning inspector] - INSPECTOR 1 As observed at 156, 158, 168 and [address].

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2191No official casework-database value to compare
    Extracted decision date · page 1
    8 September 2023Matches the official casework database
    Extracted site visit dates
    29 August 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3321304
Application reference
HPK/2022/0561
Lead case reference
Not recorded
Planning authority
High Peak Borough Council
Planning authority code
E07000037

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
53 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
1 May 2023
Valid date
1 May 2023
Start date
21 June 2023
Planning authority decision date
7 March 2023
Appeal decision date
8 September 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
38350
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21