Appeal 3321549
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of hip to gable and rear dormer including installation of three rooflights on front roof slope and a Juliet balcony at rear.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural matter
Since it more accurately describes the nature of the proposal the description of the development used in the Council’s decision notice has been adopted in preference to that seen in the original application form.
Section 04
Main issue
The main issue is the effect of the proposals on the character and appearance of the host property and surrounding area.
Section 05
Reasons
The appeal property is a detached dwelling setin a part of the street comprised of similar good quality residential development, albeit of varied designs. The submitted elevational drawings tend to give a misleading impression in that they do not show the garage below the dwelling at the front and that the dwelling is set back and elevated well above road level. It is also built on a hill, and the plots of neighbouring houses are stepped to take account of the difference in levels.
One of the common attributes of the varying designs of the immediately neighbouring dwellings on this side of the street is that they are largely comprised of hipped or gabled roofs. These features contribute positively to provide a sense of spaciousness at roof level even when the gaps between houses below are not particularly generous.
The effect of the proposed development would be to extend the dwelling’s side walls vertically upwards thus adding considerable bulk at roof level and reducing the sense of spaciousness currently in evidence. I share the Council’s view that the additions at roof level would appear incongruous and, as a consequence, the appearance and current proportionality of the dwelling would be materially affected, harmfully so. That the dwelling is elevated above its neighbour at No 45 would accentuate the harm when viewed from the street below because of the exposed and prominent position of the roof. The harm I have described at roof level would also be clearly seen at the rear when viewed from parts of the public footpath (No 117) which runs alongside No 49.
I conclude that the development would materially and harmfully affect the character and appearance of the host property and its surroundings. Accordingly, I find that a clear conflict arises with the thrust of those provisions of policies SP4 and DM10 of the Croydon Local Plan (CLP) directed to achieving high quality design and respecting local character and the objectives of policy D3 of the London Plan directed to optimising site capacity through the design-led approach.
Section 06
Other matters
The appellants claim a fall-back, in the sense that permitted development rights are said to exist. However, in the absence of a certificate of lawfulness it does not fall to me to determine what is, or is not, permitted development, and I therefore give this aspect little weight. The appeal proposal clearly requires planning permission, and the appeal has therefore being determined on this basis having regard to the provisions of the development plan and other material considerations.
I have also taken account of the appellants’ references to other built forms in the street, including that at No 69a, but that dwelling it seems to me is some distance from the appeal property, away from its immediate sphere of visual influence.
All other matters referred to in the representations have been taken into account, but no other matter is of such strength or significance as to outweigh the considerations that led me to my conclusions.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2949No official casework-database value to compare
- Extracted decision date · page 1
- 9 August 2023Matches the official casework database
- Extracted site visit dates
- 18 July 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3321549
- Application reference
- 22/05136/HSE
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Croydon
- Planning authority code
- E09000008
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 4 May 2023
- Valid date
- 11 May 2023
- Start date
- 9 June 2023
- Planning authority decision date
- 16 February 2023
- Appeal decision date
- 9 August 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 36859
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21