Skip to main content
Official casework recordDismissedCurrent release

Appeal 3321608

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a proposed 2 storey side and single storey rear and front porch and loft extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the extension on the character and appearance of the host property and the area.

  3. Section 04

    Reasons

    The existing dwelling is the end terrace property along a row of four within a predominantly residential area. This row of dwellings are of similar individual design featuring pebble dash and tile hanging to front bays. They have undergone relatively minimal alterations with the most obvious being the addition of front porches. Differing facing materials, new windows and replacement roof tiles have also been introduced, as is the case with the majority, if not all homes along [address]. These alterations have not altered the overall balance and rhythm of the terrace. The proposed extension would have a width and depth comparable to that of the existing dwelling. The side extension would be set at a slightly lower ridge line with a modest set back of the front wall at first floor level from the principal elevation. The ground floor element would align with the current front porch and replace an existing outbuilding.

    The extension would not reflect the form of the existing row of terraces and, due to its width and associated bulk and massing, would notably unbalance its symmetry. It would not read as a subordinate addition to the existing dwelling and fails to adhere to the detailed guidance given in the Barking and [name] and Alterations Supplementary Planning Document 2012 (SPG) for extensions to terraces. The extension does not accord with this guidance as it nearly doubles the width of the building. It is not parallel with the front elevation as it is recessed at first floor level and aligns with the porch, which is a subordinate entrance structure, at ground floor level.

    The dormer window in the rear roof slope would be sufficiently modest within the resultant roof slope such that it would not be excessively large or dominate the overall form. However, the hip to gable side extension would unbalance the symmetry of the row. The dormer and rooflights forming part of the proposed loft conversion are dependent on the remainder of the extension. Those elements require the extended dwelling to have an acceptable design to integrate satisfactorily. A hip to gable extension would, equally, and of itself, have an unbalancing effect on the row of terraces. Nevertheless, the single storey rear element is of a shallow depth. This fits comfortably within the limits the SPG allows for and would not contribute to the harm to the appearance of the host dwelling or row that I have otherwise identified.

    In reaching the above findings, I have had regard to previous refusals (Council refs 18/00138/FUL and 19/01149/FUL), the more recent of which was dismissed at appeal (ref APP/Z5060/W/21/3272123). I note that both these schemes were for the formation of an end-terrace dwelling. Indeed, the latter was not denied permission due to design reasons. Its form more closely replicated that of the existing row of terraces, albeit with features that read a new dwelling. That scheme is not the same as the one presently in hand. I have, therefore, determined this appeal proposal on its own merits.

    Other extensions in the locality have also been drawn to my attention. The extension to number [address] is a good example of an extension that matches the form and features of the host row of terraces. It benefits from the matching ridge line and neatly aligned front elevation to both floors together with narrower width and space to side boundary. In this regard it is materially different to the development proposed here.

    Numbers 76 and 78 are notably different and should not be seen as setting a precedent for similar extensions nor the harm I have identified as those examples appear dominant and incongruous in the street scene. I do not have details on the full context of these cases, including the applicable policies and guidance at the time of their construction. I am therefore unable to give them significant weight in this assessment. In any case, their existence does not justify the harm that would arise from this proposal.

    I conclude that the proposed development would harm the character and appearance of the host property and the area, as it would not relate satisfactorily to the existing dwelling and would unbalance the symmetry of the row of terraces. The proposal therefore fails to comply with Policies D1 and D4 of the London Plan (2021), Policy CP3 of the Barking and [name] (2010), Policy BP11 of the Barking and Dagenham Borough Wide Development Policies Development Management Plan (2011) and the associated guidance in the SPG. The policies aim to protect or enhance the character and amenity of the area and are consistent with the related provisions of the National Planning Policy Framework.

    The Council has also cited Policies SP2, DMD1 and DMD6 of the London Borough of Barking and Dagenham Draft Local Plan in its decision. I note that the draft plan is at Examination, and therefore at an advanced stage. However, at the current time it does not form part of the statutory development plan and I have not been made aware as to whether there are any unresolved objections in relation to the noted policies. I can, therefore, only attach limited weight to those policies in this decision and, as such, they are not an influential factor on the outcome of this appeal.

  4. Section 05

    Conclusion

    For the reasons given above I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 20921No official casework-database value to compare
    Extracted decision date · page 1
    9 October 2023Matches the official casework database
    Extracted site visit dates
    19 September 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3321608
Application reference
23/00005/HSE
Lead case reference
Not recorded
Planning authority
London Borough of Barking and Dagenham Council
Planning authority code
E09000002

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
5 May 2023
Valid date
5 May 2023
Start date
21 July 2023
Planning authority decision date
24 February 2023
Appeal decision date
9 October 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
39942
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21