Appeal 3321633
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of a 2-storey side elevation extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Main issue
While the appellant has described the proposal as in the above heading, the Council has additionally referred to elevational changes including new windows and doors. From my inspection of the plans, the Council’s description more fully reflects the development sought. I have proceeded on that basis.
The main issue is the effect of the proposed development on the character and appearance of the local area.
Section 04
Reasons
The appeal property is a 2-storey semi-detached dwelling with the first-floor accommodation within the roof space served by dormers at the front and rear. It stands within a group of four similar pairs that address the same side of [address] within an estate style residential area within which buildings vary in type, style, and scale.
The new 2-storey side addition would be set back from the main front wall with the ridge line set below that of the host building. The materials would match those of the existing dwelling and the pattern of windows and doors would be in keeping with the style of the appeal property. As such, the proposal would comply with some of the advice within the Council’s Planning Guidance Note 17, [name] (PGN17). Although somewhat dated, PGN17 remains a relevant consideration in this case.
Nevertheless, the proposal would significantly add to the scale of the host building and result in a larger property with wider front and rear elevations. By elongating the front and rear dormers to cover part of the new roof, the proposal would visually accentuate the width of the new 2-storey elevations. Due to its considerable scale, width and elevated position, the front dormer, as proposed, would also be a sizeable and prominent feature in the principal elevation of the dwelling when seen from [address]. In these views, the extended front dormer would draw the eye as an overly large and dominant feature in the finished dwelling notwithstanding its position mostly set in from the edges of the host roof.
There would also be an incongruous detail with the base of part of the new front dormer set at eaves level just above the proposed entrance door. I appreciate the difficulty of setting the entire extension back from the main front wall whilst also placing all the new front dormer well above the eaves. However, the submitted design would appear unconvincing because part of the enlarged front dormer would appear unusually taller and more substantive in-built form than the rest of the same structure.
When seen from the road just in front of the site, the proposal would add disproportionate scale and width to the existing dwelling and its design would appear contrived. In doing so, the appeal scheme would markedly contrast with and seriously imbalance the pair to which it belongs, as the attached counterpart to No 298, which has a single storey side addition, largely retains its original form above ground floor level. As the only obvious example of such development in the small group to which No 298 belongs, the proposal would be an obtrusive and discordant addition to the street scene and the local area. [name] saw a variety of houses and bungalows in the area surrounding the site, it is within the short row of similar dwellings that No 298, as proposed to be enlarged, would be visually ‘read’.
The appellant considers that the rear dormer could be enlarged through the exercise of permitted development (PD) rights. While that may be the case, it would be smaller than the proposal and confined to the existing roof slope. As such, a PD compliant scheme is not directly comparable with the proposal and planning permission is sought for the development as a whole. Consequently, I attach only limited weight to this consideration in support of the appeal.
Reference is also made to various extensions and alterations made to properties in the vicinity of the site, notably at [address], with some details and photographs provided. From what I saw, this example serves to demonstrate that changes made to a dwelling that are clearly visible from the road can have a very significant effect on the character and appearance of the host building and the street scene to which it belongs. It does not persuade me that the proposal, which would be a visually disruptive and uncharacteristic feature within the locality, should therefore be permitted.
On the main issue, I conclude that the proposed development would cause significant harm to the character and appearance of the local area. Therefore, it conflicts with Policies ENV2 and ENV3 of the Black Country Core Strategy, Policies L1 and S6 of the Dudley Borough Development Strategy and PGN17. Together, these policies and guidance promote high quality design and seek to ensure that development is of an appropriate form, scale, and mass, and that it preserves if not enhances local character. It is also at odds with the National Planning Policy Framework which states that developments should be sympathetic to local character and add to the overall quality of the area.
Once complete, the proposal would provide valuable additional living space including a first-floor bathroom on the same level as the bedrooms, unlike the existing dwelling. I also appreciate that the internal layout of the dwelling and the need to achieve sufficient head height has limited the design options particularly in relation to the dormers. However, these matters do not outweigh the harm that I have identified on the main issue.
Section 05
Conclusion
Overall, the proposed development would conflict with the development plan, when read as a whole. There are no material considerations, including the policies of the Framework, which indicate that the decision should be taken other than in accordance with the development plan.
For the reasons set out above, and having regard to all other matters raised, including the absence of objections from others, I therefore conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 287No official casework-database value to compare
- Extracted decision date · page 1
- 22 August 2023Matches the official casework database
- Extracted site visit dates
- 8 August 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3321633
- Application reference
- P23/0168
- Lead case reference
- Not recorded
- Planning authority
- Dudley Metropolitan Borough Council
- Planning authority code
- E08000027
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 May 2023
- Valid date
- 5 May 2023
- Start date
- 21 June 2023
- Planning authority decision date
- 6 April 2023
- Appeal decision date
- 22 August 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 37530
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21