Appeal 3321819
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as a “garden shed bicycle storage, turbo trainer (indoor bike apparatus), DIY use, router table, table saw, drill press, band saw.”
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
At my site visit I observed that the development had commenced and was substantially complete. However, I noted some differences between the submitted plans and the development which had been constructed, including the addition of rooflights. For the avoidance of doubt, I have therefore determined the appeal on the basis of the submitted plans.
Section 04
[name]
The main issues of the appeal are: • Whether the development would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies; • The effect of the development on the openness of the Green Belt; • The effect of the development on the character and appearance of the area; and • Whether the harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations so as to amount to the very special circumstances required to justify the proposal.
Section 05
Reasons
The appeal site, [site address] , is a two-storey semi-detached dwelling. It has a small, paved driveway to the front, with access to its rear garden located to the side of the property. The appeal site is located at the end of a row of semi-detached houses that front onto [address]. The majority of the dwellings on this side of [address] are two storeys in height and are of brick construction. They are sited on a well-defined building line, set back from the pavement behind landscaped front gardens. Many of the neighbouring properties have been altered or extended and have outbuildings to the side of rear.
The appeal site which is located within the Green Belt has a semi-rural feel. Open countryside, in the form of agricultural fields, are located to the rear of these properties. The appeal site is also bordered to the east by an agricultural field.
This appeal relates to ‘[name], which is the larger of three outbuildings located in the rear garden. The building has a dual-pitched roof and is finished in timber cladding. It has four large window openings on its eastern elevation which overlook the adjoining field, a further three in the western elevation, as well as two rooflights. The building measures approximately 10.6 metres in length and runs along the eastern boundary of the site, with a ridge height of approximately 3.6 metres. The overall volume of the building is 235 cubic metres.
Section 06
Whether Inappropriate Development
Paragraph 147 of the Framework states that inappropriate development is, by definition, harmful to the Green Belt and the essential characteristics of Green Belts are their openness and permanence.
Paragraph 149 of the Framework regards the development of new buildings as inappropriate in the Green Belt. However, it lists some exceptions to this, including Paragraph 149(c) which relates to the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. Policy CP8 also states that development within the Green Belt will only be allowed in accordance with national planning policy.
My assessment therefore requires me to consider whether the appeal development would, when taken in combination with any previous additions to the original building, result in a disproportionate addition in terms of its size. This exercise does not require me to consider the visual impact of the development or any effect on openness at this stage.
The Framework does not provide a definition of ‘disproportionate additions’ and therefore an assessment of whether a proposal would amount to a disproportionate addition over and above the size of the original building is a matter of planning judgement.
I have not been provided any evidence to demonstrate the extent of the original dwelling house, including what outbuildings existed on 1 July 1948. However, it is clear from the planning history of the site and my observations during my site visit that the original dwelling has already been extended, with the addition of a large conservatory to the rear.
Whilst this appeal relates only to ‘[name], the submitted plans also show that there are two further sheds located in the rear garden. There is no evidence that these sheds existed before July 1948. However, a Lawful Development Certificate1 has recently been granted in respect of these two buildings. The Council found that these buildings constituted permitted development under Schedule 2, Part 1, Class E of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended.
I therefore find that the length, height, and volume of the development together with the existing rear conservatory extension and other outbuildings results in a disproportionate addition over and above the size of the original building, which is contrary to Paragraph 149(c) of the Framework.
For these reasons, the proposed development represents inappropriate development in the Green Belt.
Section 07
Openness
The Framework identifies that the fundamental aim of the Green Belt is to prevent urban sprawl and keep land permanently open. The openness of the Green Belt has both spatial and visual dimensions.
The outbuilding is highly visible in the surrounding area and appears larger in volume than other outbuildings observed in the local area, as well as in height and length. The outbuilding together with the other buildings and the conservatory, results in a combination of structures which affects both the visual and spatial openness of the Green Belt.
The position and size of the building serves to enclose the rear garden area, with very little of the original curtilage retained as open garden. The presence of two further outbuildings on the opposite boundary of the site, which are of a similar size, scale and design further contributes to this sense of enclosure.
For the reasons above, the outbuilding results in both spatial and visual harm to the openness of the Green Belt and therefore does not preserve the openness of the Green Belt contrary to the fundamental aim of the Framework.
Section 08
Character and Appearance
[address] Extensions Design Guide Supplementary Planning Document 2019 (SPD) provides guidance on the position of outbuildings, advising that they should be sensitively located, in locations that do not have an adverse impact on the visual amenity of an area, especially the appearance of the streetscene. The guidance advises that they should also complement the original house in terms of scale and design.
The location of the building on the eastern boundary of the appeal site means that even though the building is single storey, it is highly visible as you approach from the East and from the road. There are more limited views of the building to the West as it is largely screened by intervening the development. Nevertheless, the building is a visually prominent addition to the area.
The length of the building, together with the design and height of the development above the boundary fence results in an incongruous addition that fails to have regard to the scale and layout of the host property and surrounding area, as such, the building is not viewed as a sympathetic or high-quality addition to the host property. 1 Planning Application Ref: A/22/94294/LUCE
Therefore, I conclude that by virtue of its location, scale and size the development harms the character and appearance of the area. The development is therefore contrary to Policies CP10 and CP17 of the Wigan Local Plan Core Strategy 2013 (WLP), which require, amongst other things, development to respect and acknowledge the character and identity of the borough and its locality, in terms of the materials, siting, size, scale and details used and to integrate effectively with its surroundings.
Section 09
[name]
Paragraph 148 of the Framework states that substantial weight should be given to any harm to the Green Belt. It establishes that very special circumstances will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations.
The development provides the appellant with additional domestic storage which would be a personal benefit. I give this benefit limited weight in favour of the development, however it does not outweigh the substantial weight that I am required to give to any harm to the Green Belt and any other harm resulting from the proposal, which in this case is harm to the character and appearance of the area.
Consequently, very special circumstances to justify the development do not exist.
Section 10
Green Belt Balance & Conclusion
The development therefore conflicts with Policy CP8 of the WLP which seeks to protect the Green Belt and Policies CP10 and CP17 of the WLP, which require, amongst other things, development to have regard to the scale, design, layout, and materials of the surrounding and existing buildings and to protect the general amenity of an area.
For the reasons given, the proposal would therefore not accord with the development plan when taken as a whole. There are no material considerations of sufficient weight that indicate the appeal should be determined other than in accordance with the development plan. The appeal is therefore dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 6No official casework-database value to compare
- Extracted decision date · page 1
- 27 October 2023Matches the official casework database
- Extracted site visit dates
- 22 August 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3321819
- Application reference
- A/22/94342/RET
- Lead case reference
- Not recorded
- Planning authority
- Wigan Metropolitan Borough Council
- Planning authority code
- E08000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 29 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- No
- Historic building grant made
- Not recorded
- Relates to a conservation area
- No
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 10 May 2023
- Valid date
- 10 May 2023
- Start date
- 29 June 2023
- Planning authority decision date
- 18 April 2023
- Appeal decision date
- 27 October 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 40994
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21