Appeal 3322161
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
“Installation of external air conditioning units and associated acoustic enclosure within the rear side courtyard”.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary matter
The description of the proposed works in the heading above is taken from the decision notice and the appeal form. The householder application form referred only to a single air conditioning “unit”, when in fact 2 such units are proposed.
Section 04
Main issue
The main issue is whether the proposed installation would comprise sustainable infrastructure, having regard to the need to minimise the effects of climate change and reduce carbon dioxide emissions.
Section 05
Reasons
Paired with no. 5a, no. 5 is a semi-detached, 2-storey house with a near full-width rear ground floor extension and a raised rear garden. The external plant and the associated low-sound louvred enclosures proposed would be attached to the side of the rear extension which faces onto a narrow side courtyard and the high wall on the common boundary with no. 3.
The application could have been presented to the Council with greater clarity. The principal application documents (the plans, the householder application form and the Design, Access & Heritage Statement) did not specifically mention the term air source heat pump or its abbreviation (ASHP). This technology, which is directly referred to in the Appeal Case Statement, is still a form of air conditioning where use is made of a heat pump to extract heat from the outside air to warm the interior or to heat hot water and also to extract heat from the inside to provide cooling. An ASHP needs electricity to function.
The determination of the appeal is to be made in accordance with the development plan unless material considerations indicate otherwise. The development plan includes the Camden Local Plan 2017 (LP). It is supported by various supplementary planning documents, the Camden Planning Guidance Energy efficiency and adaptation (CPG) 2021 being of most relevance.
[name] CC1 and CC2 and the CPG tackle climate change mitigation and adapting to climate change. The approach on mitigation in CC1 is that all new development is required to reduce carbon dioxide emissions by following the steps in the energy hierarchy which prioritise using less energy through lower cost passive design measures, such as improved fabric performance, over higher cost active systems, such as renewable energy technologies. In CC2, the Council will require development to be resilient to climate change. All development should adopt appropriate climate change adaptation measures, such as those aimed at reducing the impact of urban and dwelling overheating, including the application of the cooling hierarchy. The provision of active cooling systems, like air conditioning units, is at the bottom of the cooling hierarchy and should presumably be limited if the hierarchy is adhered to.
Indeed, paragraph 8.42 of the LP says that active cooling (air conditioning) will only be permitted where dynamic thermal modelling demonstrates there is a clear need for it after all of the preferred measures are incorporated in line with the cooling hierarchy. No such modelling has been submitted.
I agree there are some limitations in how an existing building can be adapted and that the best opportunities to achieve an energy efficient design can be assembled when a scheme is being designed from scratch. Still, existing buildings cannot be excluded because they account for almost 90% of the borough’s carbon dioxide emissions, according to the CPG. [name] do not find the Council’s approach to be disproportionate to this householder application. Under LP Policy CC2, any development involving 5 or more residential units is required to submit a [name] covering the range of climate change adaptation measures set out in sections a. to d. Such a statement is not required for schemes under 5 dwellings or for householder applications. However, the relevant principles in this policy cannot be ignored for such minor developments since the key parts of the policy start with the phrases “The Council will require development...” and “All development should adopt...”.
The existing dwelling supports a number of passive ventilation amenities, including windows in the front, side and rear elevations, wide patio doors to the rear, and so I am told, an openable roof light. These could possibly be used so as to increase passive ventilation to minimise overheating and achieve internal comfort. If they cannot and certain rooms experience overheating and other passive forms of ventilation or energy efficient technology like [name] with Heat Recovery (MVHR) are not feasible or practicable as claimed, this is where the appellant should demonstrate a clear need for the air conditioning system through dynamic thermal modelling.
It is said that the ASHP would be used for heating and cooling and result in the removal of the gas boiler which is not energy efficient. Had an ASHP been 2 acceptable in principle when assessed against the relevant energy and cooling hierarchies, it would be for the appellant to consider how much electricity is required to work the pump versus the energy savings of providing heating and cooling. Carbon calculations would need to be submitted to show that their use for heating is more efficient than gas.
The appellant has said that the proposed air conditioning system will only be used during extreme weather events as opposed to being in use all year round, so as to limit its overall usage. That scenario is not something that could realistically be achieved or guaranteed through any planning controls.
I have considered the 4 other planning permissions in Camden for air conditioning units brought to my attention in Appendix 1 of the Appeal Case Statement. One of them (ref. 2016/0552/P) pre-dated the LP, 2 related to larger-scale commercial properties where different energy considerations might have applied and all 4 of them pre-dated the current CPG which provides detail on how to implement [name] CC1 and CC2. Whilst the omission of any reference to [name] CC1 and CC2 is regrettable in 3 of those cases, this does not provide a sound or persuasive basis in favour of allowing this appeal. Moreover, there could be other cases where the Council has followed the same approach as at the appeal site but the chosen householder appeal procedure does not permit the Council any opportunity to respond on this point.
On the evidence available, I find on the main issue that the proposed installation would not comprise sustainable infrastructure, having regard to the need to minimise the effects of climate change and reduce carbon dioxide emissions. The scheme conflicts with [name] CC1 and CC2.
Section 06
Other matters
The appeal dwelling falls within the Hampstead Conservation Area and there are a number of listed buildings in the vicinity of the site. The Council did not take exception to the scheme on heritage protection grounds and I saw no reason to disagree with that stance.
Having regard to the appellant’s Noise Impact Assessment and the observations of the Council’s Environmental Health Department, the Councill was satisfied that the amenities of nearby residents would not be harmed, subject to conditions specifying noise limits and requiring the installation of anti-vibration isolators and fan motors. On balance, I accept that finding.
Section 07
Conclusion
My finding on the main issue is decisive to the outcome of this appeal. There is conflict with the development plan. The harm cannot be mitigated by the imposition of planning conditions and it is not outweighed by other material considerations. For the reasons given above and having regard to all other matters raised, including the representations made at application stage, I conclude that this appeal should not succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 807No official casework-database value to compare
- Extracted decision date · page 1
- 14 September 2023Matches the official casework database
- Extracted site visit dates
- 30 August 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3322161
- Application reference
- 2022/2476/P
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Camden
- Planning authority code
- E09000007
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 0 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 16 May 2023
- Valid date
- 16 May 2023
- Start date
- 20 July 2023
- Planning authority decision date
- 29 March 2023
- Appeal decision date
- 14 September 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 38716
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21