Skip to main content
Official casework recordAllowedCurrent release

Appeal 3322204

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

erect first floor rear extension, alter elevations (retrospective).

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the erection of first floor rear extension, alter elevations (retrospective) at [site address] , [site address] , [postcode] in accordance with the terms of the application, Ref 23/00157/FULH, dated 30 January 2023, subject to the following conditions:

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

    The development hereby permitted shall be carried out in accordance with the approved plans, titled ‘[name] at [site address] ” and dated September 2021.

  2. Section 03

    Application for costs

    An application for costs was made by [name] against Southend-on-Sea City Council. This application is the subject of a separate Decision.

  3. Section 04

    Preliminary matters

    The application form described the proposed development as “Retrospective two storey, rear extension”. The council changed this to the description used in the heading above, which was also used on the appeal form. I have adopted it as it more clearly identifies the development proposed.

  4. Section 05

    Main Issue

    The main issue in this case is the effect of the first floor rear extension on the character and appearance of the existing dwelling and the wider area.

  5. Section 06

    Reasons

    The appeal site, No.530, contains a two-storey semi-detached house on the southern side of the A127 [address], similar to the attached neighbour at No. 528 which has a similar architectural style and materials. Along the west boundary, and alongside the appeal development, is high evergreen hedging that adjoins the rear garden of No.6 The Gables: The Gables is a cul-de-sac connected to [address], at the rear of the site.

    The rear of the appeal site has been subdivided and a chalet style dwelling has been constructed, now known as [address]. The presence of this dwelling, and similar developments to the east limit views of the application site to the rear. The rear garden of the attached dwelling, has outbuildings alongside the appeal extension. The high evergreen hedging, restricts views into the site from the west. Whilst there is open landscape further to the south and west, the application site is not read within a rural context and is characteristic of an urban area. The immediate vicinity is dominated by the presence of the [address].

    The appeal extension is hip roofed and measures some 4.1m deep, 5.3m wide and 7.5m in maximum height (when measured from ground level). The submission of the appeal application followed an enforcement investigation for failure to build the previously approved development (18/02173/FULH) in accordance with the approved plans. That permission was for a first-floor rear extension 3.5m deep, 5.3m wide, and 8.15m in maximum height and. Thus, dimensionally, the appeal development is 0.65m lower than that permitted, but extends back 0.6m further than that permitted.

    The main issue that I have identified above stems from the single refusal reason. To understand the reasoning that led to that refusal, one must look to the officer’s report. I briefly refer to the relevant part of that report. The officer found that “... the development, by reason of its excessive depth (emphasis added) and resultant scale and bulk, appears as a dominant and disproportionate addition that is significantly out of keeping with and harmful to the character and appearance of the existing dwelling and the wider area”.

    Here the officer is contrasting the development as carried out with the permission given under reference 18/02173, that was commenced, although not fully conforming with the permitted detail. The true test of acceptability is to see to what extent the current appeal development has diverted from that permission, since the council found the earlier scheme acceptable, and to what extent harm thereby arises.

    I note that the resultant bulk and scale referred to is only as a result of the excessive depth: there is no other aspect of the proposal that the officer points to with regard to additional bulk and scale. That ‘excessive’ depth amounts to 0.6m (see paragraph 6 above) on an approved depth of 3.5m. This must also be seen in the context of a reduction of height form 8.15m to 7.5m, which the officer appears not to have taken into account in concluding that “scale and bulk, appears as a dominant and disproportionate addition”.

    At the same time, under the heading ‘Amenity impacts’ the officer concluded that “The extension has a dominant effect on the rear garden setting of No.528, however, noting the scale and position of No.528’s extension and the depth of the rear garden it is considered that any resultant sense of enclosure does not reach a significantly harmful degree to justify a refusal reason on direct residential amenity impacts alone”. Thus it would seem that the degree of dominance, as far as the neighbour at No.528 is concerned, does not amount to a defect warranting refusal of permission, because of the development at the rear of that neighbour’s house. I see no reason to disagree with that assessment

    In respect of the possible dominance on the other neighbour, to the west, there can only be a limited effect due to the high evergreen hedge that exists within the curtilage of that dwelling. It is true that the extension can be seen from the rear of that house, but its apparent mass and dominance, when looked at end on, due to an extra 0.6m, would hardly be noticeable.

    From what is saw at my site visit I am satisfied that the first floor rear extension does not have a harmful effect on the character and appearance of the existing dwelling or the wider area.

  6. Section 07

    Other matters

    There are small differences in matters of fenestration in the appeal scheme compared to the previously approved scheme, but these are not referenced in the refusal reason, and were not material to the decision to refuse planning permission.

    I have taken account of all other matters. In respect of amenity impacts, the officers report concluded that “...the design, size, siting and scale of the development are such that it would not result in any significant harm to the amenities of the site, neighbouring occupiers or wider area in any relevant regards. The proposal is therefore considered to be acceptable and policy compliant in terms of its amenity impacts”. I have no reason to disagree with this conclusion.

    There is an objection from a neighbour that the extension has caused damage to her property, but that is a civil matter and not for me.

  7. Section 08

    Conclusions

    I have found that the first floor rear extension does not have a harmful effect on the character and appearance of the existing dwelling or the wider area. [name] will allow the appeal.

  8. Section 09

    Conditions

    The council has suggested a number of conditions in the event that the appeal is upheld. I have considered these in the light of Planning Practice Guidance (PPG). These are i) the standard condition placing a time limit on the start of development; ii) that the materials to be used in the construction of the external surfaces of the development shall match those used in the existing building; and iii) the development shall be carried out in accordance with the approved plans.

    The first condition is unnecessary and inappropriate since the application is retrospective and thus the development has already begun. The other 2 suggested conditions are necessary to ensure that the appearance of the development permitted integrates with the existing in a visually satisfactory manner and for certainty and avoidance of doubt as to the development permitted. I will therefore impose them.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 129No official casework-database value to compare
    Extracted decision date · page 1
    14 September 2023Matches the official casework database
    Extracted site visit dates
    17 August 2023 (page 1)
  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 129No official casework-database value to compare
    Extracted decision date · page 1
    14 September 2023Matches the official casework database
    Extracted site visit dates
    17 August 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3322204
Application reference
23/00157/FULH
Lead case reference
Not recorded
Planning authority
Southend-on-Sea City Council
Planning authority code
E06000033

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
10 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
16 May 2023
Valid date
16 May 2023
Start date
2 June 2023
Planning authority decision date
27 March 2023
Appeal decision date
14 September 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Yes
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
38718
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21