Appeal 3322381
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
proposed raised roof with rear dormer.
Section 02
Decision
The appeal is allowed and planning permission is granted for the proposed raised roof with rear dormer at [site address] in accordance with the terms of the application, Ref 22/01006/FULL, dated 11 July 2022, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: ADP435EP 02 [name] and ADP435EP 03 [name].
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
Section 03
Preliminary Matters
A revised National Planning Policy Framework (the Framework) was published by the Government on 19 December and updated on 20 December 2023 and accompanied by a written ministerial statement (WMS). Any references to the Framework hereafter in this decision are to the latest version.
The revised Framework is a material consideration which should be taken into account from the day of publication. I have familiarised myself with the content of the revised Framework and the accompanying WMS and none of the revisions to the Framework would be material to this appeal. Having considered the revisions and in light of the principles of natural justice, in this instance I do not consider it necessary to invite any submissions from the parties on the revised Framework.
The appeal site is located within the Green Belt. The Framework confirms that the Government attaches great importance to Green Belts. The identified fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open. The essential characteristics of Green Belts are their openness and their permanence. The Council consider that the proposal would not represent a disproportionate addition to the host property nor compromise the openness of the Green Belt. Based on the plans before me and my observations on site I see no reason to take a different view. Accordingly, the proposal is not inappropriate development in the Green Belt and does not conflict with policy as set out in the Framework on this matter.
Section 04
Main Issue
The main issue is the effect of the proposal on the character and appearance of the host property and the surrounding area.
Section 05
Character and Appearance
The appeal site is a detached chalet style bungalow located on a corner plot at the junction of [site address] and [address] in Wickford. The surrounding area is relatively open with the appeal site forming part of a small, secluded cluster of development, consisting of mainly low-level detached properties located in spacious plots. There are several chalet style bungalow properties that have been extended to provide living accommodation in the roof space, however they retain the low building level and low-density character of this area.
The proposal seeks a modest increase to the ridge height of the subordinate integral double garage roof and provide a rear roof dormer. Whilst the proposal would create visual bulk at the roof level, there would be only minor alterations to the ridge height. Furthermore, given that the dormer would be positioned to the rear of the site it would limit public views to glimpse views, via [address] only. Whilst providing additional accommodation in the roof space, the height, scale and visual impact of the proposal from the street scene would still resemble the lower level buildings in the area. Consequently, the proposal would be akin to the architectural form of the cluster of chalet style bungalows within the vicinity.
From my site observations there is a prevalence of other properties that have extended into the roof slope, most notably at [address] and Barholme on [address] to the rear of the appeal site. Whilst these properties have created additional accommodation in the roof space, these additions are proportional to the main dwelling and still maintain the low building level and low-density feel to the character of the area. Given this treatment, the appeal proposal has been sympathetically designed to minimise its impact and would appear similar to others in the area. As a result, the appeal proposal would not seem jarring, appearing as a coherent built form in the vicinity.
Overall, I would conclude that the height and scale of the proposal would not harm the character and appearance of the host property or the immediate area. As such, the proposal would accord with the relevant provisions of Policy BAS BE12 of the Basildon District Local Plan Saved Policies 2007 which amongst other things, seeks to prevent alterations and extensions to residential development from harming the character of the surrounding area including the street scene. In this respect the proposal would also accord with the provisions of the Framework which amongst other things, also seeks to secure high quality design which protects local character.
Section 06
Conditions
To meet legislative requirements, a condition is imposed to address the period for commencement. A condition is imposed to ensure that the development is carried out in accordance with the approved plans, in the interests of certainty. A condition is also necessary to ensure that materials match the existing property and protect the character and appearance of the host building and surrounding area.
Section 07
Conclusion
For the reasons given above, having regard to the development plan as a whole, and all other relevant material considerations, I conclude that the appeal should succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2962No official casework-database value to compare
- Extracted decision date · page 1
- 17 January 2024Matches the official casework database
- Extracted site visit dates
- 9 January 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3322381
- Application reference
- 22/01006/FUL
- Lead case reference
- Not recorded
- Planning authority
- Basildon District Council
- Planning authority code
- E07000066
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 18 May 2023
- Valid date
- 26 May 2023
- Start date
- 16 June 2023
- Planning authority decision date
- 9 March 2023
- Appeal decision date
- 17 January 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 44913
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21