Appeal 3322485
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
already in place. I have therefore dealt with the appeal on the basis of its retention.
Section 02
Decision
The appeal is allowed and planning permission is granted for a single storey rear extension at [site address] in accordance with the terms of the application, Ref 21/03449/HSE, dated 28 June 2021, and drawing nos. 2001-1, 2001-2, 2001-3A, 2001-4A and 2001-10, and subject to the following condition:
Within 3 months from the date of this decision, the extension hereby permitted shall be fitted with a water butt, which shall thereafter be retained. In the event of a legal challenge to this decision, the operation of the time limit specified in this condition will be suspended until that legal challenge has been finally determined.
Section 03
Procedural Matter and Background
The development the subject of this appeal is already in place. I have therefore dealt with the appeal on the basis of its retention.
Planning permission was previously granted at the appeal site for a single storey rear extension (Ref: 20/00095/HSE). Compared to it, this scheme has a similar depth, but it has taller walls, and a flat roof rather than a ridged roof. That previous decision was informed by the Council’s Suburban Design Guide 2019, which has since been revoked. Consequently, and as that previous permission is no longer extant, I have not given it any weight in my decision.
Section 04
[name]
The main issues are the effect of the development on: • the living conditions of neighbouring occupiers, with particular regard to the outlook from, and availability of natural light to, [address] and [address]; • flood risk; and • fire safety.
Section 05
Living conditions
In its delegated report, the Council states that the scheme does not meet the ‘45 degree test in plan or elevation’. However, I have no details of that test, including its status, nor how it has been applied to this scheme.
On my visit I observed that the development the subject of this appeal abuts the boundaries with the terraced properties either side. Nonetheless, as evidenced by the photographs at [name] and paragraph 3.11 of the appellant’s statement, I also noted that a single storey rear extension, with a similar depth to this one, has been largely completed at [address].
[name] have no further details of that scheme, I have no cogent reason to believe that it is not lawful. Given the presence of that extension, this proposal would not have a harmful impact on those occupiers’ outlook, nor on the availability of natural light within that property.
Turning to [address] (‘No 69’), it has a two storey outrigger which is shared with the appeal property, and a ground floor projection beyond. That projection is much shorter than the appeal scheme, but its rear-facing window closest to the common boundary is very small. Thus, the projection’s main source of natural light, and its principal outlook, is from its larger window, which is significantly further from the boundary.
Viewed from that larger window, the extension is significantly off-set to one side. Consequently, and as the extension has a limited single storey height, based on the evidence before me, it has not impacted the availability of natural light within the house at No 69, nor the outlook from it, to a harmful degree.
No 69’s patio has become more enclosed to one side as a result of this scheme. However, the patio has a more open outlook to the other side, and No 69 also benefits from a reasonably long rear garden, parts of which are a significant distance from the extension.
Whether or not the scheme complies with the ’45 degree test’, for the above reasons I conclude that it has not harmfully impacted the neighbouring occupiers’ living conditions. On this issue, the scheme does not therefore conflict with Policies SP4.2 and DM 10.6 of the Croydon Local Plan 2018 (‘CLP’), or Policies D3 and D6 of the London Plan 2021 (‘LP’). These require, amongst other things, that development shall enhance social cohesion and well-being, and that it shall protect the amenities of adjacent occupiers, having regard to matters including sunlight, daylight and outlook.
Section 06
Flood risk
In broad terms, and amongst other things, [name] DM25 and SP6.4, and [name] 12 and SI 13, require development to incorporate measures to reduce surface water run-off, and to reduce or mitigate flood risk.
Although the appeal site is at medium risk of surface water flooding, the application was not accompanied by any such measures. However, in its delegated report the Council states that, had the development been approved, a condition would have been imposed requiring the provision of a water butt to stem run off. Having regard to the very modest scale of this scheme, I agree that this measure would appropriately mitigate the risk of surface water flooding; and on that basis it would not conflict with those policies.
Section 07
Fire safety
LP Policy D12 requires all development to achieve the highest standards of fire safety. In its delegated report, and by reference to the draft Mayor of London Fire Safety Guidance, the Council states that the application should have been accompanied by a ‘[name].
I have very few details before me on this matter. However, at paragraph 5.32 of the appeal statement it is confirmed that no lifts or combustible materials are proposed, and that current fire safety measures are appropriate and will not be negatively affected by the development.
Having regard to the scale of the scheme, and its single storey form, on the basis of the available evidence I conclude that it has not had a significant impact on fire safety, and that it does not therefore conflict with LP Policy D12.
Section 08
Conditions and Conclusion
In the event that the appeal is allowed, the Council has suggested that the standard time limit condition is imposed, along with conditions requiring that the development be carried out in accordance with the approved plans, and that it be faced in matching materials. However, as the development is already in place, and as its brick and render finish is acceptable, none of those are appropriate.
In the interests of mitigating flood risk, and as agreed by the appellant at paragraph 5.33 of his statement, a condition is necessary requiring the provision of a water butt. That condition is imposed to ensure that this measure is implemented and retained so as to make the development acceptable in planning terms.
This requirement, including the timeframe for implementation, is proportionate to the details and scale of the case. In the event that the action is not undertaken by the specified date, the Council could use its powers under section 172 or section 187A of the Town and Country Planning Act 1990.
For the above reasons, I conclude that the scheme has not harmfully impacted neighbouring occupiers’ living conditions; that it has not significantly impacted fire safety; and that flood risk can be appropriately mitigated by means of a
Section 09
condition.
Consequently, having regard to all other matters raised, the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 450No official casework-database value to compare
- Extracted decision date · page 1
- 3 July 2023Matches the official casework database
- Extracted site visit dates
- 20 June 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3322485
- Application reference
- 21/03449/HSE
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Croydon
- Planning authority code
- E09000008
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 19 May 2023
- Valid date
- 19 May 2023
- Start date
- 1 June 2023
- Planning authority decision date
- 30 March 2023
- Appeal decision date
- 3 July 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 34994
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21