Skip to main content
Official casework recordAllowedCurrent release

Appeal 3322786

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as “Double storey side extension to form, play room and study. First floor two en-suite bathrooms and a walk-in wardrobe to the existing bedroom. Existing garage to be removed, and new garage to be constructed.”

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a double storey side extension to form, a playroom and study, two en-suite bathrooms and a walk-in wardrobe to the existing bedroom, with the existing garage to be removed, and new garage to be constructed at [site address] in accordance with the terms of the application, Ref 20230049, dated 19 January 2023, subject to the conditions in the attached schedule.

  2. Section 03

    [name]

    The main issues are the effect of the proposal on i) the living conditions of No [address], with specific regard to enclosure; and ii) parking provision.

  3. Section 04

    Living conditions

    The appeal proposal would provide a two-storey side extension the full depth of the host property, which would adjoin the rear boundary with [address]. The proposal would effectively infill a gap between the rear fence at No 10 and the existing flank elevation at the appeal site, providing a development that would be closer to the rear elevation and garden at No 10.

    Planning permission1 has previously been granted at the appeal site for a two-storey rear extension and part single and part two storey side extension. From my site observations the two-storey rear extension element has largely been completed, although work to the side extension has not yet been implemented. The proposed flank extension would be no closer to the rear boundary fence at No 10 than the approved and partially implemented scheme, albeit it would provide additional mass at the first-floor level at the rear.

    Whilst the appeal scheme would increase the mass at first floor from that approved, this would be set against the existing shape of the property. Given 1 Gravesham Borough Council Planning Ref: 20160555 its location within the existing silhouette of the host property it would not be visually intrusive or particularly overbearing when viewed from No 10 or its rear garden. It is acknowledged that the appeal proposal would represent a visual increase in development, however I am satisfied that the proposal would not create an overly oppressive or enclosing atmosphere to the detriment of the existing outlook from No 10.

    The Council’s Householder Extensions/Alterations Design Guide Supplementary Planning Document (SPD), adopted October 2021, seeks to protect the residential amenity of neighbours and enhance the local built environment. The SPD highlights that two-storey side extensions should have regard to the 25- degree rule in respect to outlook. The proposal would represent a modest breach of the 25-degree rule as set out in the SPD guidance. However, given the presence of the existing dwelling and for the reasons stated above, the overall scale and depth would not be unduly oppressive to the outlook at No 10.

    Consequently, the proposal would not have a harmful effect on the living conditions of the occupiers of the neighbouring property at No 10 with particular reference to enclosure. The proposal accords with the general aims and objectives of the SPD, the relevant sections of Policy CS19 of the Gravesham Local Plan Core Strategy (CS), adopted September 2014 and Paragraph 130 f) of the National Planning Policy Framework (the Framework) which collectively seek developments to provide a good standard of amenity for all existing occupants of buildings.

  4. Section 05

    Parking provision

    [name] CS11 and CS19 seek to ensure that schemes provide sufficient levels of parking in accordance with adopted local parking standards, to avoid unacceptable impacts on on-street parking and highway safety. In accordance with the parking standards a total of 2 off-street parking spaces would be required for the proposal.

    [address] is a residential area with no restrictions in operation prohibiting on-street parking, and many of the properties have forecourt parking incorporating multiple vehicles. From my site observations and the plans before me, whilst no designated parking spaces have been provided there is sufficient space available within the plot for the provision of 2 off-street parking spaces, which could be secured by way of a suitable condition.

    Consequently, subject to a condition the proposal would include sufficient on-site parking provision to serve the development. It would, therefore, accord with the relevant sections of [name] CS11 and CS19 and the [name] T1 and P3 of the Gravesham Local Plan First Review Saved and [name] (September 2014) which, amongst other things, seek to provide sufficient off-street parking and to ensure that proposals do not unnecessarily impede the free flow of traffic, which would impact on highways safety.

  5. Section 06

    Other Matters

    I recognise that the proposal has generated public interest, with several consultation responses submitted in response to the planning application and further representations submitted at appeal. I have taken into account all of the other matters and concerns raised in the submissions by the interested parties, which include but are not limited to, effect on light, loss of privacy and overlooking.

    With regard to light, given the orientation of the properties, the course of the sun, and therefore the direction of shadowing, the impact on daylight and sunlight as a result of the proposal on No 10 would be limited. As such, I am satisfied that the proposal would maintain a reasonable relationship with the adjacent properties and not lead to excessive loss of daylight and sunlight.

    In respect to overlooking and loss of privacy, the first-floor window would serve a non-habitable room, and as such could be conditioned to be fixed shut and obscured glazed. Subject to the imposition of such a condition, the design of the proposed development would ensure that existing residents at No 10 would not experience any loss of privacy from the upper floor. Nevertheless, it would be prudent to remove permitted development rights to ensure that no additional alterations and/or openings could be provided on this flank elevation to protect the living conditions at No 10.

  6. Section 07

    Conditions

    In the absence of conditions suggested by the Council I have imposed a standard time limit condition and a condition specifying the approved plans for the avoidance of doubt and in the interest of certainty.

    I have imposed a condition in respect to material specification in order to ensure an acceptable visual effect. In the interests of highway safety and the living conditions of neighbouring residents I have also imposed a condition which is necessary to secure 2 off-street parking spaces.

    Due to the size and shape of the site and its relationship to neighbouring dwellings, it is necessary and reasonable to remove permitted development rights for extensions and alterations, to protect the amenity of neighbours and future occupants. I have also attached a condition securing obscured glazing on the flank window to protect living conditions of neighbouring properties, from the proposed development, in terms of privacy.

  7. Section 08

    Conclusion

    There are no relevant material considerations to indicate the application should be determined other than in accordance with the development plan. For the reasons given above, I therefore conclude that the appeal should be allowed subject to the conditions set out below.

  8. Section 09

    SCHEDULE OF CONDITIONS

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Site Location Plan, [name]/Site Plan and drawing number MAD - 457-03

    The development hereby permitted shall not commence until samples of the materials to be used in the construction of the external surfaces, including fenestration and roof, have been submitted to and approved in writing by the Local Planning Authority, and the development shall be carried out in accordance with the approved details.

    The development hereby permitted shall not be occupied until details have been submitted to and approved in writing by the Local Planning Authority for appropriate parking space to be laid out within the site for 2 cars and that space shall thereafter be always kept available for the parking of vehicles and retained in perpetuity.

    The development hereby permitted shall not be occupied until the window on the flank wall at first floor adjoining [address] has been fitted with obscured glazing, and no part of the window that is less than 1.7 metres above the floor of the room in which it is installed shall be capable of being opened. Details of the type of obscured glazing shall be submitted to and approved in writing by the Local Planning Authority before the window is installed and once installed the approved obscured glazing shall be retained thereafter.

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no extensions permitted by Class A of Part 1 of the Second Schedule of the 2015 Order shall be constructed. END OF SCHEDULE

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2962No official casework-database value to compare
    Extracted decision date · page 1
    20 September 2023Matches the official casework database
    Extracted site visit dates
    5 September 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3322786
Application reference
20230049
Lead case reference
Not recorded
Planning authority
Gravesham Borough Council
Planning authority code
E07000109

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
23 May 2023
Valid date
23 May 2023
Start date
7 June 2023
Planning authority decision date
16 March 2023
Appeal decision date
20 September 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
39022
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21