Appeal 3323579
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
alterations to roof; front and rear dormers; rooflights in rear and both side roof slopes; external alterations
Section 02
Decisions
Appeal A is dismissed.
Appeal B is allowed and planning permission is granted for alterations to roof; front and rear dormers; rooflights in rear and both side roof slopes; alterations to front porch; front entrance canopy; external alterations (demolition of front porch) at [site address] in accordance with the terms of the application [name]/1610/23, dated 2 June 2023, subject to the conditions set out in the attached Schedule.
Section 03
Preliminary and procedural matters
Since they more accurately describe the appellant’s proposals, I have used the description of the proposed development seen in the Council’s decision notices rather than those in the original application forms. Appeal Decisions APP/M5450/D/23/3323579 & APP/M5450/D/23/3327238
As the descriptions of the proposed developments imply, both schemes are comprised of several elements. All the elements are separately considered in the officer reports on each application both in terms of design and possible effects on neighbouring amenity.
The Council raises no objection to most of the elements, and I have no reason to disagree with the Council’s assessments in this regard. The Council’s concerns relate solely to the front dormer proposed in each case, and this aspect forms the basis of the only reason for refusal used in both decision letters.
Section 04
Main issue
Having regard to the above, the main issue in both appeals is the effect of the proposed front dormer on the character and appearance of the host property and its surroundings.
Section 05
Reasons
The appeal property is a substantial detached dwelling. [name] visited it was vacant and secured by timber security screens on the site frontage. It stands in a lengthy street displaying distinct suburban characteristics comprised of a mixture of detached and semi-detached dwellings.
Apart from its reliance on development plan policies directed to design, the Council also refer me to the guidance on roof alterations and dormers set out in its SPD1. The guidance provides that front or side dormers ‘can be objectionable’. This does not, to my mind, mean that all front dormers are necessarily objectionable as a matter of principle, since as the guidance also points out, ‘consideration will be given to the type of roof, the scale of proposals, and the character/appearance of the house and those adjacent. Thus, a subjective assessment is called for having regard to the listed criteria.
As the Council points out, none of the dwellings in the street display front dormers. However, the appellant observes, and the Council concurs, that many of the detached dwellings in the street show different characteristics in terms of their design and appearance, and several have been modified since being built. Roof designs are varied, and many features project above eaves level, punctuating roof lines when viewed from the street.
The dormers proposed were designed with a view to marrying with the form of the prominent twin gables at the front of the property. However, the dormer subject of appeal A is far larger than that subject of appeal [name] is its size and bulkiness that in my opinion it would dominate the roof, resulting in the host property becoming perceived as top-heavy, materially harming its character and appearance, and that of its surroundings.
The dormer subject of appeal B is more modest in scale and would be seen as subservient and proportionate within the overall mass of the roof. It would also be sited at a relatively low level so that in oblique views along the street, most of the structure would be screened by the projecting front gables on 1 Supplementary Planning Document (SPD) on [name] (2010) paragraphs 6.66 % 6.67 in particular. 2 Appeal Decisions APP/M5450/D/23/3323579 & APP/M5450/D/23/3327238 either side. It would have far less of an impact than the dormer subject of appeal A and would sit acceptably in its visual context.
I therefore conclude that the proposal subject of appeal A would harm the character and appearance of the host property and its surroundings. Accordingly, a clear conflict arises with those provisions of policies 7.4B & 7.6B of The London Plan, policy CS1 B of the [name] and policy DM1 of the Harrow Development Management Local Plan Policies, which, in combination, require new development to be of a high standard of design, respectful of local architecture and character, and for house extensions to respect their host buildings.
On the other hand, I find that the scheme subject of Appeal B complies with the thrust of these development plan policies, and this appeal succeeds for this
Section 06
Conditions
In respect of Appeal B, the Council’s suggested conditions regarding materials and that the development shall be carried out in accordance with the approved plans shall be imposed in the interests of visual amenity and certainty respectively.
Section 07
Other matters
I have taken account of all other matters raised in the representations, including the references to the National Planning Policy Framework, and the appellant’s references to what are regarded as broadly similar development in this and adjacent streets. I give these examples little weight since I am not aware of all the circumstances surrounding those cases. I have therefore determined the appeals on their individual merits having regard to the development plan and other material considerations.
No other matter is of such strength or significance as to outweigh the considerations that led me to my conclusions.
Section 08
Schedule of Conditions in respect of Appeal B
The development hereby permitted shall begin not later than three years from the date of this decision.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
The development hereby permitted shall be carried out in accordance with the following approved plans: the location plan and [name] 8164527- 04-1100 [name]; 8164527-04-1200 [name]; 8164527-04-3100 [name]; 8164527-04-3200 [name] & B-8164527-04-3000 [name]. 3
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2949No official casework-database value to compare
- Extracted decision date · page 1
- 21 November 2023Matches the official casework database
- Extracted site visit dates
- 13 October 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3323579
- Application reference
- P/0792/23
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Harrow
- Planning authority code
- E09000015
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 66 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 June 2023
- Valid date
- 8 June 2023
- Start date
- 12 July 2023
- Planning authority decision date
- 11 May 2023
- Appeal decision date
- 21 November 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 42324
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21