Appeal 3323614
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as an “additional storey constructed on end of terrace dwelling house in materials of similar appearance to existing. Internal works as necessary for occupation and construction of storey”.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
Under the provisions of Article 3(1) and Schedule 2, Part 1, Class AA of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended (the GPDO), where an existing dwellinghouse consists of two or more storeys, planning permission is granted for its enlargement consisting of the construction of up to two additional storeys immediately above the topmost storey, together with any engineering operations reasonably necessary for the purpose of that construction, subject to various conditions and limitations.
[name].2(3) of Part 1, Class AA of the GPDO requires, as a condition of the permission, that prior approval be sought for the matters listed in that paragraph. Prior approval is required for, amongst other things, the external appearance of the dwellinghouse, including the design and architectural features of the principal elevation. The Council’s reason for refusal expresses their objection to the proposal in this respect.
In determining applications for prior approval, paragraph AA.3 (12) of Part 1, Class AA of the GPDO requires the local planning authority to take into account any representations made to them as a result of any consultation or publicity, and to have regard to the National Planning Policy Framework (the Framework) so far as relevant to the subject matter of the prior approval, as if the application were a planning application. I have considered the appeal on the same basis.
The prior approval provisions do not require regard to be had to the development plan because the principle of development is established through the grant of permission by the GPDO. I have therefore only had regard to the policies of the development plan referred to by the main parties insofar as they are material to the matters for which prior approval is sought.
Section 04
Main Issue
The main issue of the appeal is whether or not prior approval should be granted having regard to the external appearance of the dwellinghouse, including the design and architectural features of the principal elevation.
Section 05
Reasons
The appeal site comprises a three-storey, post-war, red brick, end terrace property. The gable end of the appeal site faces prominently onto a small area of open space within the development. Together with No.8 and No. [address] they form a short terrace of three-storey properties, which are attached to a terrace of two storey properties from No.10 through to No.[address]. Although the dwellings in the row have undergone some minor alterations to their principal elevations, they retain a strong sense of uniformity.
The appeal site is located behind and away from [address], [address] and [address], meaning that there are limited views of the site from public vantage points. The immediate surrounding area is characterised by blocks of two, three and four storey buildings. However, the taller buildings are located closer to the road frontages, with the lower height buildings located away from these locations. The immediate area surrounding the appeal site is therefore characterised by two and three storey buildings, including those visible from the appeal site to the rear of [address].
The proposed development would involve the erection of an additional storey, increasing the height of the building by approximately 2.7 metres. The roof pitch, materials, design, and fenestration would match and be sympathetic to those used in the existing building. However, whilst the design and materials would match the external appearance of the dwellinghouse, including its principal and side elevations, the proposed erection of an additional storey would create an intrusive interruption to the predominantly regular roofline along the short terrace of three storey dwellings and significantly unbalance the terrace. This would create a visually dominant extension that would tower above its neighbours, causing harm to the character and appearance of the existing dwellinghouse and its immediate surrounding area.
[name] acknowledge that there are some variations in heights of terraces and blocks of buildings in the vicinity, they are not directly comparable to the appeal scheme in that they do not typically relate to a substantial increase in height of an end terrace property located in a short row of 3 properties of the same height. Furthermore, the existence of this variety does not justify the introduction of a noticeably obtrusive and harmful extension where there is currently an overall pleasing sense of consistency to height of the row of existing dwellings.
My attention has been drawn to two appeal decisions1 by the appellant which relate to the use of permitted development rights for upwards extensions to create additional dwellinghouses. However, whilst it is the case that the GPDO grants planning permission for upwards extensions, there is still a requirement 1 Appeal Ref: APP/H21840/W/21/3266807 and APP/T1410/W/20/3263486 to consider the effect of exercising these rights on the external appearance of dwelling house, which the Courts2 have found also extends to impacts on neighbouring premises and the locality.
The appeal site abuts the boundary of Stoke Newington Conservation Area (SNCA) and locally listed buildings No. 10 and No. [address]. The SNCA includes Abney Park Cemetery, [address] and the, relatively busy, [address]. The Conservation Area is densely developed to the south with more open space to the north and around the entrance to the cemetery. Although the appeal site abuts the boundary of the SNCA, views from and towards the SNCA are very limited.
No. 10 and No. [address] are two-storey, Victorian terraced properties of painted brick construction, with sash windows and stone cills. These buildings which are recognised as locally listed buildings, are also located within the SNCA. The significance of these buildings lies in their architectural interest, particularly from their front elevations on [address]. In relation to the appeal site, only the rear elevations of these properties are visible, and these views would not be adversely affected by the proposed upwards extension.
Therefore, by virtue of the location of the appeal sits and the limited views of the appeal site from and to these locations, I find that the proposed development would have a neutral effect on their setting. Accordingly, I find that the proposed development would preserve the setting of the SNCA and the locally listed buildings on [address].
Notwithstanding my conclusion that the proposed development would be sympathetic in terms of design and materials to the appearance of the existing dwellinghouse, and it would preserve the setting of the SNCA and locally listed buildings, it would nevertheless be unduly prominent addition. It would therefore result in significant harm to the appearance of dwellinghouse and its contribution to the street scene in this part of [address]. This would be contrary to the National Planning Policy Framework (the Framework) which supports upward extensions where development would be consistent with the prevailing height and form of neighbouring properties and the overall street scene. Furthermore, the Framework seeks good design and development that is visually attractive and sympathetic to local character. The proposal would fail to meet this expectation.
For these reasons, I conclude that prior approval should not be granted having regard to the effect of the development on the external appearance of the dwelling.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 6No official casework-database value to compare
- Extracted decision date · page 1
- 14 November 2023Matches the official casework database
- Extracted site visit dates
- 24 October 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3323614
- Application reference
- 2022/2242
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Hackney
- Planning authority code
- E09000012
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 5 June 2023
- Valid date
- 13 June 2023
- Start date
- 24 August 2023
- Planning authority decision date
- 14 March 2023
- Appeal decision date
- 14 November 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 41946
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21