Skip to main content
Official casework recordDismissedCurrent release

Appeal 3323658

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

two-storey extension to side.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are: (i) whether or not the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies; (ii) the effect of the proposal on the openness of the Green Belt; (iii) whether any harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the proposal.

  3. Section 04

    Whether or not inappropriate development in the Green Belt

    Paragraph 149 of the Framework states that the construction of new buildings should be regarded as inappropriate in the Green Belt other than in a number of exceptions. One exception at Paragraph 149 c) is the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. Policy PG3 (Green Belt) of the Cheshire East Local Plan Strategy (2017) (LPS) reflects the requirements of the Framework and includes the same exception.

    What constitutes a disproportionate addition is not defined in the Framework. However, Policy RUR 11 (Extensions and alterations to buildings outside of settlement boundaries) of the Cheshire East Local Plan Site Allocations and Development Plan Document (2022) (SADPD) confirms that when considering whether a proposal represents disproportionate additions, matters including height, bulk, form, siting and design will be taken into account. This policy also states that proposals will usually be considered to represent disproportionate additions where they increase the size of the original building by more than 30% in the Green Belt.

    Furthermore, Policy RUR 11 confirms that full account will be taken of any previous extensions or development to the original building or in its curtilage. It goes on to clarify that for the purposes of this policy original building means the building and outbuildings/structures as it was originally built, or as it existed on 1 July 1948 if constructed before this date. It also clarifies that the increase in size will usually be determined by assessing the net increase in floorspace.

    In the absence of any alternative definition of what constitutes a disproportionate addition, I find that the specific requirements of the development plan are pertinent to my assessment.

    The appellant’s calculations suggest that when a previous extension to the house is taken into consideration, the proposed extension would result in a cumulative floorspace increase of 31.6%. This marginally exceeds but conflicts with the specified 30% threshold in the development plan.

    Furthermore, there is a large outbuilding in close proximity to the house which from what I have seen is the result of an approval for a ‘detached pool house and 4 bay garage’ in 20111. The Council’s assessment also takes this outbuilding into account and this is consistent with the approach detailed in Policy RUR11. I am mindful that the SADPD is a recently adopted document and this approach would have been through an examination process which factored in the requirements of the Framework.

    Moreover, although it is detached, I observed that the outbuilding is closely related to the house and the upper floor dormer windows convey a further domestic function over and above its normal storage function. I therefore regard the outbuilding as being an extension to the original dwelling, notwithstanding its limited physical separation, and agree with the Council that it should be factored in to the floorspace calculations.

    Once the floorspace of the outbuilding is factored in, the cumulative extensions would significantly exceed the 30% floorspace threshold Policy RUR 11. This has been confirmed by a subsequently approved planning application for the same two-storey extension to the side of the house2 (recent planning permission). The evidence before me indicates that application included as-built floor plans for the outbuilding. This allowed for the Council to calculate that the cumulative percentage increase in floorspace, factoring in the outbuilding, would be 57%. This further indicates that the appeal proposal would be a disproportionate addition.

    Policy RUR 11 only allows for exceptions to the 30% threshold in specific circumstances. However, from what I have seen the site is not within a defined village infill boundary, the development would alter the building’s envelope and external appearance, it would provide more than facilities for basic amenities or sanitation and does not relate to a small scale domestic outbuilding. Therefore, the development would not meet any of the exceptions at Part 3 i) – iv) of Policy RUR 11. 1 [name] 11/2058M 2 [name] 23/1716M

    I conclude the development would be inappropriate in the Green Belt, having regard to the requirements of the development plan and the Framework.

  4. Section 05

    The effect on the openness of the Green Belt

    Paragraph 137 of the Framework sets out the essential characteristics of Green Belts, which are their openness and permanence. It has been held in the [address] that openness is epitomised by the lack of buildings or development.

    In spatial terms the proposal would include a small increase in the footprint of the dwelling at ground floor level. It would also increase the bulk and volume of the host dwelling which from a visual perspective would be evident to passers-by the site in views through the site entrance. From this vantage point the extension would almost double the width of the house at first floor level. The development would also be perceptible from further south along [address] in glimpses through the woodland. The visual impacts would be understood in the context of being closely aligned with the footprint of the existing dwelling albeit would be seen together with the previous extensions, most notably the aforementioned outbuilding.

    Taken together, the spatial and visual impacts of the proposals would have a modest effect on the openness of the Green Belt. In this regard, the proposals would not preserve the openness of the Green Belt, thereby conflicting with the aims of including land within the Green Belt when assessed against the Framework.

  5. Section 06

    Other considerations

    From what I have seen, the recent planning permission on the site includes proposals to reduce the size of the existing outbuilding. I understand that this includes a reduction in the footprint of the outbuilding together with a reduction in its height and the removal of the dormers. I note that even then the cumulative increases to the dwelling were calculated at 36% and therefore in excess of the threshold in the development plan. Even so, as a fallback position it would still result in less built form on the site than would be the case with the appeal proposal. Therefore, the extent to which the cumulative additions would be disproportionate and the effect on openness in that instance would less. I therefore find that the fallback position carries limited weight as a material consideration.

    There is no dispute that the proposal would be in keeping with the architectural style of the host dwelling. However, the design attributes of the proposal do not persuade me that the proposal would be acceptable having regard to the overall requirements of the development plan and the Framework relating to the assessment of proposals in the Green Belt.

    The appellant has drawn my attention to extracts from the Council’s delegated report in 2011 relating to the outbuilding which took into account different factors in an assessment of the Green Belt considerations. This included an assessment against the policies of a different development plan that was in place at that time. However, I have assessed the appeal on the basis of the proposal before me which seeks to further extend the house, having regard to the existing site circumstances and the up-to-date requirements of the development plan and the Framework.

  6. Section 07

    Conclusion

    The development constitutes inappropriate development in the Green Belt to which I attach substantial weight. The Framework states that inappropriate development is by definition harmful to the Green Belt and should only be approved in very special circumstances.

    As part of the assessment, I have also found that the development would result in a modest effect on the openness of the Green Belt. Very special circumstances will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations. This is a high hurdle for a development proposal to overcome.

    The other considerations put forward in favour of the proposal only carry limited weight.

    In conclusion and on balance, the substantial weight to be given to Green Belt harm, in addition to the other harm identified is not clearly outweighed by other considerations and therefore the very special circumstances needed to justify the proposed development do not exist.

    For the reasons given the overall conclusion is therefore that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 121No official casework-database value to compare
    Extracted decision date · page 1
    8 December 2023Matches the official casework database
    Extracted site visit dates
    31 October 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3323658
Application reference
23/0503M
Lead case reference
Not recorded
Planning authority
Cheshire East
Planning authority code
E06000049

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
6 June 2023
Valid date
25 June 2023
Start date
2 October 2023
Planning authority decision date
30 March 2023
Appeal decision date
8 December 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
43229
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21