Appeal 3323956
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described on the application form as, “[name] and [name]”.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The description of development in the heading above has been taken from the planning application form. However, in [name] of the appeal form it is stated that the description of development has changed, and written confirmation that a revised description of development has been agreed has been provided. Accordingly, I have considered the appeal on the basis of the description of development given in the Council’s decision notice, which is, ‘Proposed erection of a first floor rear extension (east elevation), front canopy porch, 2 No. Front dormers (west elevation) and 1 No. Large rear dormer. Subsequent loft conversion and internal structural alterations’.
Section 04
Main Issue
The main issue is the effect of the proposed development on the living conditions of the occupiers of [address], with particular regard to daylight and outlook.
Section 05
Reasons
The appeal site comprises a detached dwelling, [site address] (No 8), located in a predominantly residential area in Portishead. [address] (No 10) is situated immediately to the north of the site.
A home office is present on the southern elevation of No 10, which is part of a side dormer roof extension. This office has a south-facing window, facing towards No 8. The office also has an east-facing porthole window. I observed that, due to the distance of the existing side elevation of the first floor section of No 8 from the office window, and the open aspect across the flat roof of the ground floor extension of No 8 towards the south-east, the office currently benefits from a good amount of daylight and a largely open outlook.
The appellant has stated that the flank of the proposed first floor rear extension would be sited approximately 2.5 metres from the office at No 10. Although some daylight would still be received from the left-hand side of the office window facing No 8, at such close proximity to that window, the proposed extension would, by reason of its scale and height, unduly reduce the amount of daylight received into the office. This adverse impact would not be off-set by the presence of the porthole window, due to the limited contribution which that small porthole window makes with respect to daylight.
Although the amount of daylight entering the office would likely exceed that presently received by the front room of the side dormer roof extension, taking account of the office’s function as a habitable room, this would not be at a level which would provide acceptable living conditions for the users of the office.
Moreover, whilst outlook via the left-hand side of the office window facing No 8 would be unaffected, at such close range the proposed first floor rear extension would, due to its scale and height, appear as a dominant and overbearing feature which would result in a significant enclosing effect for the users of the office, and it would significantly obscure much of the foreground outlook presently available from the office window.
Consequently, the office at No 10 would become much less pleasant to use as a result of the proposed development. Although the office is likely used less intensively than other habitable rooms, the degree of harm identified above would be unacceptable in this case. Hence, the proposed development would conflict with section 2 of the [name] Guide1 which provides that, amongst other things, a new residential building or an extension to an existing one should not cause significant harm to the living conditions of neighbouring residents when using their gardens or habitable rooms.
I therefore find that the proposed development would have an unacceptable and harmful effect on the living conditions of the occupiers of No 10, with particular regard to daylight and outlook. It would conflict with the 3rd bullet point of Policy DM32 of the Development Management Policies: Sites and Policies Plan Part 1 (adopted 2016) (DMP) which provides that, amongst other things, in determining whether the design is acceptable account will be taken of whether the design and layout should not prejudice the living conditions of adjoining occupiers through overbearing impact.
The proposed development would also conflict with paragraph 135 f) of the National Planning Policy Framework (the Framework) which provides that, amongst other things, planning decisions should ensure that developments create places with a high standard of amenity for existing and future users.
Policy DM37 of the DMP, referred to by the Council in their decision notice, relates to proposals for new dwellings and therefore is not directly relevant to this main issue. Nevertheless, the above-mentioned policies are more than sufficient for me to come to a view on this main issue.
Section 06
Planning Balance
I note the lack of objections from the occupiers of No 10, but the harm identified on the main issue above would remain, notwithstanding their lack of 1 [name] – section 1: Protecting living conditions of neighbours (Supplementary Planning Document) (adopted 2013) objection. This is a neutral matter, which does not weigh in favour of the proposed development.
The proposed development would provide enhanced living accommodation, to the benefit of the appellant and the future occupiers of No 8. However, as these would mainly be private benefits they have been given little weight in support of the proposed development. These benefits do not outweigh the identified harm, nor do they indicate that the development plan should not be followed.
Section 07
Conclusion
For the reasons given above, having considered the development plan as a whole, the approach in the Framework, and all other relevant material considerations, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 368No official casework-database value to compare
- Extracted decision date · page 1
- 29 January 2024Matches the official casework database
- Extracted site visit dates
- 16 January 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3323956
- Application reference
- 22/P/2943/FUH
- Lead case reference
- Not recorded
- Planning authority
- North Somerset Council
- Planning authority code
- E06000024
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 12 June 2023
- Valid date
- 11 July 2023
- Start date
- 28 July 2023
- Planning authority decision date
- 28 April 2023
- Appeal decision date
- 29 January 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 45501
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21