Skip to main content
Official casework recordDismissedCurrent release

Appeal 3324076

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of a single and 2-storey rear extension, hip to gable roof extension, loft conversion and rear dormer window.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural matter

    While the appellant has described the proposal as in the above heading, the Council has additionally referred to rendering at the front side, and rear of the dwelling. I also note that the plans show additional windows to the side elevation of the main house. I have proceeded on that basis.

  3. Section 04

    Main issues

    The main issues are the effect of the proposed development firstly, on the character and appearance of the host building and the local area; and secondly, on the living conditions of the occupiers of 30 and [address] with particular regard to light.

  4. Section 05

    Character and appearance

    The appeal property is one of a pair of hip-ended semi-detached houses in a predominantly residential area within which 2-storey dwellings predominate. I saw that there is some variety to the size and style of existing dwellings in the area to which the site belongs with those close along [address] and nearby streets mostly with hipped roofs.

    The proposed part single, part 2-storey addition would be at the back of the appeal dwelling and extend across its full width. The new ground floor element would project outwards from the main rear wall by about 6-metres, with a smaller first floor component extending rearwards by about half this depth. This arrangement would elongate the built form of No 32, significantly enlarge its footprint, and noticeably add to its scale and mass.

    The submitted design is simple. That the walls of the existing dwelling would be rendered to match those of the new rear extension would also unify the general appearance of the finished building. Nevertheless, the proposal would be disproportionate in scale, mass, and depth to the host building. The rear of No 32 would be overwhelmed by the considerable scale and mass of the new extension, the bulk of which would be accentuated by the visually strong horizontal lines of its flat roofs. The new dormer would also be a sizeable addition covering most of the existing and new rear roof slope. The considerable width and height of the new dormer, with its flat roof just below ridge level, would cause it to appear as an overly large ‘box like’ addition.

    Views of the proposed rear extension and dormer from public vantage points would be very limited given their position at the back of the main house, away from the road. These elements of the appeal scheme would, however, still form part of the characteristics of the area as it is experienced and appreciated from nearby houses and gardens. When viewed from the rears of the properties on either side of the site, the proposal would draw the eye as a dominant and uncharacteristically large and bulky addition.

    At the front, the proposed hip to gable extension would imbalance the pair of which No 32 forms part given that the attached property has retained its original hipped roof. It would also noticeably differ to the predominantly hipped roof form that generally characterises most buildings along [address]. As such, the proposed hip to gable extension would be a visually disruptive and an unwelcome addition to the street scene and the local area.

    Policy SAD EOS 9 of The Site Allocations and Delivery Development Plan Document (DPD) states that the Council will reject poor designs, particularly those that are inappropriate in their locality, for example, those that are out of scale or incompatible with their surroundings. The Council’s Supplementary Planning Document, [name] (SPD) echoes this approach. The SPD notes that poor quality domestic extensions that do not fit in visually or are clearly out of keeping with their surroundings will be resisted. For the reasons given, that would be the case with the proposal before me.

  5. Section 06

    Living conditions

    Of the properties close to the site, it is the occupiers of 30 and [address], which are situated on either side of the appeal dwelling, that are most likely to be affected by the proposal. Because the appeal scheme would be to the north to northwest of No 34 there would be no significant effect on the natural light reaching the rear of this attached property.

    There would be some loss of sunlight to the rear of No 30 during a major part of the day. That loss would be primarily caused by the overshadowing effect of the 2-storey element of the new rear extension just to the south and close to the shared boundary between these neighbouring properties. However, from what I saw, No 30 occupies an elevated position relative to the site due to the sloping ground. In addition, the 2-storey part of the proposed extension would not project significantly beyond the existing rear elevation of No 30. As a result of both factors, the loss of daylight and sunlight due to the proposal would not be appreciable insofar as it is experienced by the occupiers of this adjacent property.

  6. Section 07

    Conclusion on the main issues

    Overall, I find that there would be no material harm to the amenities enjoyed by the occupiers of neighbouring properties. However, the proposed development would have an unacceptable effect on the character and appearance of the existing dwelling and the local area. Accordingly, it conflicts with Policy ENV3 of the Black Country Core Strategy, DPD Policy SAD EOS 9 and the Council’s SPD. These policies and guidance aim to ensure that new development achieves the highest possible design standards and is compatible with its surroundings.

  7. Section 08

    Other matters

    The appellant states that the proposed dormer and the hip to gable extension could be carried out in any event through the exercise of permitted development rights. Whether or not that is the case, these elements of the appeal scheme are not clearly severable from the rear extension and planning permission is sought for the development in its entirety. I have assessed the proposal on that basis. If the appellant wishes to ascertain whether a part of the development would be lawful, they may make an application under section 191/192 of the Act.

    I acknowledge that the application of render would provide an opportunity to resolve problems of maintaining the existing brickwork, which is painted. However, this consideration does not outweigh the significant harm that I have identified.

  8. Section 09

    Conclusion

    The proposed development would conflict with the development plan, when read as a whole. There are no material considerations, including the policies of the National Planning Policy Framework, which indicate that the decision should be taken otherwise than in accordance with the development plan.

    For the reasons set out above, and having regard to all other matters raised, I therefore conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 287No official casework-database value to compare
    Extracted decision date · page 1
    17 August 2023Matches the official casework database
    Extracted site visit dates
    8 August 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3324076
Application reference
DC/23/68038
Lead case reference
Not recorded
Planning authority
Sandwell Metropolitan Borough Council
Planning authority code
E08000028

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
52 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
13 June 2023
Valid date
22 June 2023
Start date
30 June 2023
Planning authority decision date
9 May 2023
Appeal decision date
17 August 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
37340
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21