Appeal 3324390
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the installation of a glass link-way following removal of existing conservatory and porch.
Section 02
Decision
The appeal is allowed and planning permission is granted for the installation of a glass link-way following removal of existing conservatory and porch at [site address] in accordance with the terms of the application, Ref 23/01145/FU, dated 14 February 2023, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: Plan Ref:TQRQM23045182505336 (Location Plan); Plan Ref:DD-MM-2019 Version 1.00 (Existing floor plans and elevations) and Plan Ref: 04-05-2023 Version 1.10 (Proposed plans (amended) floor plans and elevations)
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any Orders revoking or re-enacting that Order with or without modification) no development that would otherwise be permitted by [name] or E of Part 1 of Schedule 2 of that Order shall be carried out.
Section 03
Preliminary Matters
I have taken the description of development from the application form. Although different to that on the decision notice, no confirmation that a change was agreed has been provided.
During the course of the application the scheme was amended to reduce the height of the proposal. The Council determined the proposal on the basis of the amended plans as I have.
The Council have referred to Policy GB9 of Appendix 5 to Volume 2 of the Leeds Unitary Development Plan (Review 2006) (UDP) in their reason for refusal. As this policy relates to replacement dwellings in the Green Belt, which is not the case in this appeal. I do not consider it determinative in my consideration of the appeal.
Section 04
[name]
The main issues are: • Whether the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies; • The effect of the development on the openness of the Green Belt; and • If the development is inappropriate, whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations so as to amount to the very special circumstances necessary to justify the development.
Section 05
Reasons
Paragraph 149 of the Framework states that the construction of new buildings in the Green Belt should be regarded as inappropriate, other than for several exceptions. One such exception, at paragraph 149 (c) is an extension to an existing building if it does not represent a disproportionate addition over and above the size of the original building.
Whilst adopted some time ago, the aims of saved Policy N33 of the UDP are broadly consistent with the approach towards development in the Green Belt as the Framework. However, the list of exceptions, including limited extensions to existing dwellings rather than buildings, are not as extensive as those within the Framework. Consequently, the UDP is not fully consistent with it, and I therefore attach more weight to the more recent wording of the Framework.
The Framework does not define what constitutes a disproportionate addition. However, principle HDG3 of the Council’s Householder Design Guide Supplementary Planning Document 2012 (SPD) advises that to be considered as limited development, all existing and proposed extensions should not exceed a 30% increase over and above the original house volume.
In this instance, the host dwelling has been extended in the past, notably through a two-storey extension. The Council contends that the original building has already been disproportionately extended by approximately 40%. In purely mathematical terms this increase is disproportionate. However, the SPD states that although the 30% figure will inform the majority of decisions involving Green Belt applications, it is not definitive. The SPD goes on to advise that ‘it may be possible to improve the viability of a proposal by demolishing existing outbuildings and extensions, although this will not allow extensions of a harmful nature to be approved’.
The proposal would replace an existing conservatory and porch with a proposed glazed structure that would link the house to a detached outbuilding. It would create an additional net floorspace increase of approximately [address] metres but there would be a net reduction in volume of approximately 1 cubic metre. Consequently, the degree of change, in terms of floorspace and volume, as a result of the proposal would be very limited. However, when determining whether or not a proposal would be a disproportionate addition, it is also important to consider the visual increase in the size of the original building, taking into account the nature of the site and the proposal. That there was historically a building in the location of the proposed extension is not relevant as that building is no longer in situ.
The existing stone porch is discretely located against two flank two-storey walls and the existing conservatory does not project beyond the built limits of the outbuilding. Nevertheless, even though the proposed glazed link would fill a gap between buildings, it would appear subservient and would integrate well with the existing building, particularly as it would be a low and lightweight structure. Indeed, the Council had no objection to the proposal in design terms, stating that it would not compete with the proportions of the existing dwellinghouse.
In considering paragraph 149 (c) of the Framework, when discounting the existing conservatory and porch but taken cumulatively with other previous extensions, including the small timber shed adjacent to the stone outbuilding, the proposed glazed link would result in additional floorspace. Nevertheless, the height, bulk, form and massing, and therefore the volume and external dimensions of the total extensions, would not result in disproportionate additions over and above the size of the original building. This is based on the specific site circumstances, context and works proposed for this appeal only, and any other future works at this, or other properties would be required to be assessed on their own individual merits.
I therefore conclude that the proposal would meet the exception set out at paragraph 149 (c) of the Framework and would not amount to inappropriate development in the Green Belt. The proposal would comply with Policy N33 of the UDP and the SPD given the apparent flexibility afforded when assessing such additions.
As the proposal is not inappropriate development, there is no need for the appellant to demonstrate that very special circumstances exist or for me to go on to consider the effect of the proposed development on the openness or purposes of the Green Belt.
Section 06
Conditions
I have considered the suggested conditions from the Council and had regard to Paragraph 56 of the Framework and the Planning Practice Guidance (PPG)1 in terms of the use of planning conditions. Condition 1 is a statutory requirement and Condition 2 is necessary in the interests of certainty and to safeguard the Green Belt and character and appearance of the appeal site.
The Council has also requested a condition removing certain permitted development rights and the appellant has had the opportunity to review the proposed condition. There is a presumption against the restriction of national permitted development rights in the Framework, and a warning in the PPG that such conditions may not pass the tests of reasonableness or necessity.
The appeal property includes an extensive amount of garden and is located in open countryside in the Green Belt. The use of permitted development rights would have the potential to result in a considerable amount of built development within the garden of the existing house or attached to it. Given 1 [name]: 003 [name]: 21a-003-20190723; revision date: 23 07 2019 the particular circumstances of this proposal, including that existing extensions would be removed as part of the proposal, I am satisfied that there is a clear justification for the removal of some permitted development rights in this case, and that the condition would be reasonable and necessary, with the exception of development relating to roof alterations which would have a limited effect on the host building and area.
Section 07
Conclusion
For the reasons set out above, the proposal would not be inappropriate development in the Green Belt. Having regard to the development plan, the approach in the Framework, and all relevant material considerations, I conclude that the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3983No official casework-database value to compare
- Extracted decision date · page 1
- 14 November 2023Matches the official casework database
- Extracted site visit dates
- 17 October 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3324390
- Application reference
- 23/01145/FU
- Lead case reference
- Not recorded
- Planning authority
- Leeds City Council
- Planning authority code
- E08000035
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 19 June 2023
- Valid date
- 19 June 2023
- Start date
- 27 June 2023
- Planning authority decision date
- 12 May 2023
- Appeal decision date
- 14 November 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 41949
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21