Skip to main content
Official casework recordDismissedCurrent release

Appeal 3324629

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

single storey ground floor rear and side infill extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    In reaching this decision, I have had regard to the revised version of the National Planning Policy Framework (‘the Framework’) that was published on 20 December 2023 but as it does not involve changes to national policy affecting the proposal, I have not sought the parties’ comments upon it.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal upon the living conditions of occupiers of [address] with particular regard to outlook.

  4. Section 05

    Reasons

    The appeal property is a semi-detached house which features a two-storey rear projection across part of the width of the rear elevation. This ties into a matching projection at the neighbouring property to the north, which itself hosts a further single storey, flat-roofed rear projection. The property to the south (‘number 73’) also features a similar projection, as well as a further glazed conservatory.

    Space currently exists between the appeal property and number 73 by virtue of narrow areas at both properties which provide access from the rear gardens to rear entrances, and to the front of the properties by means of side paths. However, these spaces are narrow, and this area currently has a very enclosed character, with two-storey development surrounding it on three sides at close proximity.

    The side infill element of the proposal would extend to the boundary between the houses, and in doing so would eliminate some of the space that currently separates the appeal property from number 73. I saw on my site visit that number 73 has a rear door and a side elevation window located in this area, and this window would face directly towards the infill element of the proposal at close proximity.

    Whilst occupiers of number 73 are already likely to experience low levels of light and outlook from this window given the existing situation, the proposal would exacerbate this. Furthermore, although a single storey extension, it would leave the area around the rear entrance of number 73 feeling enclosed, particularly as the proposal would extend along the shared boundary for a distance of several metres. Overall, the side infill element of the proposal would have an unduly imposing presence that would feel oppressive to the occupiers of number 73.

    My attention has been drawn to Figure 6 of the Council’s Housing Design Supplementary Planning Document (‘the SPD’). This is an illustrative sketch drawing indicating a form of development that may be acceptable, having regard to paragraph 3.3.5 of the SPD. This paragraph sets out that the Council’s preference is for infill side extensions to not extend beyond the rear elevation of a rear projection, but where wraparound extensions are nevertheless proposed, that they need particularly careful consideration.

    [name] 6 is read alongside paragraph 3.3.5 it is apparent that the SPD is indicating configurations that may be acceptable, rather than indicating that such designs would be acceptable in all instances. [name] acknowledge that the proposal broadly aligns with the illustration in general terms, in reaching my decision I have considered the proposal on its merits and with regard to the specific situation of the appeal site, and its relationship with the neighbouring property.

    The proposal would harm the living conditions of occupiers of [address]. It would conflict with Redbridge Local Plan Policies LP26 and LP30, which together, and amongst other factors, state that new development should not result in an adverse impact upon the amenity of neighbouring occupiers in relation to outlook, and that household extensions should maintain adequate spacing between buildings and an acceptable outlook from surrounding dwellings.

    It would also conflict with advice contained within the SPD, which states that in designing extensions, it is very important to consider the impact of overall height, depth and width on the amenity of nearby residents in terms of loss of outlook and increased sense of enclosure.

  5. Section 06

    Other matters

    It is stated that the proposal would improve living conditions and create space for an extended family, as well as revive the property. However, there is no detailed evidence before me in respect of any particular family circumstances, and I therefore afford this only very minor weight in my considerations. Whilst the proposal would improve the property, it has not been shown that this could not be achieved by other, less harmful means. Overall, these matters do not outweigh the harm that I have found.

  6. Section 07

    Conclusion

    For the reasons given above, the proposal conflicts with the development plan as a whole. There are no material considerations which indicate that a decision should be taken otherwise than in accordance with the development plan. Therefore, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2837No official casework-database value to compare
    Extracted decision date · page 1
    4 January 2024Matches the official casework database
    Extracted site visit dates
    4 December 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3324629
Application reference
0556/23
Lead case reference
Not recorded
Planning authority
London Borough of Redbridge
Planning authority code
E09000026

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
22 June 2023
Valid date
22 June 2023
Start date
7 August 2023
Planning authority decision date
6 April 2023
Appeal decision date
4 January 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
44367
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21