Skip to main content
Official casework recordAllowedCurrent release

Appeal 3325216

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

change of use of agricultural land to dog training, including the erection of training shed, equipment store, fencing, parking provisions and landscaping.

  1. Section 02

    Decision

    The appeal is allowed and the planning permission Ref 51/22/00035 for change of use of agricultural land to dog training, including the erection of training shed, equipment store, fencing, parking provisions and landscaping at land at [address], Wembdon, Bridgwater [postcode] granted on 19 May 2023 by Somerset Council, is varied by deleting condition 9.

  2. Section 03

    Background and Main Issue

    Planning permission has been granted for the use of the land, including buildings and works, as described in bullet four of the banner heading. The appeal seeks permission to carry out the development without complying with condition 9. This limits the number of vehicle movements to and from the site in connection with the permitted use. The main issue is whether the condition is necessary and reasonable having regard to the safety and function of the local road network.

  3. Section 04

    Reasons

    The appeal site lies in open countryside, approximately 2.5km to the north of Wembdon. It is served by [address], which becomes a footpath with no access for motor vehicles just north of the site access. About 1.5km to the southwest of the site, [address] divides into two, with one arm continuing southwards, through Perry Green to meet the A39. The other arm heads eastwards to join [address]. Both arms of the road, and [address], are narrow and winding, with no lighting or footways, and so are unsuitable for high volumes of traffic.

    The use of the site for dog training will, in all likelihood, result in an increase in traffic using the lanes compared with the previous agricultural use. However, the Highway Authority was consulted on the application, and concluded that the level of traffic generated by the proposal would not have a severe impact on the local highway network. Consequently, subject to conditions relating to the layout of the access, and maintenance of the car-parking area, no objections were raised to the proposal.

    It is contended that the disputed condition is necessary to ensure that the level of traffic movements generated by the use does not exceed those that were presented as part of the planning application, and that persuaded the Highway Authority to raise no objections. However, the information supplied by the appellant, which is referred to in Condition 9, was supplied after the Highway Authority’s consultation reply. It is therefore evident that the expert advice of the Highway Authority was based on the likely traffic generation arising from the nature and scale of the proposed use, rather than the appellant’s illustration of the likely breakdown of daily traffic movements. The highly prescriptive daily traffic movements specified by the condition, which would significantly hinder the flexibility of the business, are not, therefore, necessary to comply with the Highway Authority’s advice.

    The Council states that the information submitted with the appeal indicates that traffic could be generated on additional days. Whilst this may be the case, the appellant’s evidence does make it clear that the figures given were an illustration, and that the maximum daily training movements would not necessarily apply for every day. Furthermore, it was made clear that there would be extended periods when numbers attending would be reduced, or no activities would take place at all. The removal of the condition would allow vehicle movements on Mondays and Tuesdays, and would not restrict traffic movements on other days. However, the greater flexibility would allow for scheduling of training and events so that traffic movements may not occur, or reach the maximum permitted level, on other days. As a result, the actual total traffic movements over the year would not, necessarily, be any higher than would already be permitted by the condition. The condition therefore unreasonably constricts the business to specific traffic movements that were only provided for illustrative purposes.

    It is also contended that, without the condition, client numbers may rise, leading to an increase in traffic movements along the narrow lanes, with resultant harm to the safety of other road users. I saw that the lanes leading to the site are single track, with limited passing places. However, [address], for the most part, is not enclosed by high hedges. Consequently, drivers have good forward visibility of oncoming traffic, bicycles, horses, or pedestrians. Consequently, all road users have time to make appropriate decisions about how best to pass each other. I saw very few vehicles in the lanes during my visit, and observed that the nature and condition of the roads dictates that traffic moves slowly. In view of all of these considerations, the traffic generated by the use would not result in harm to highway safety, and the condition is not necessary in this regard.

    Nevertheless, the lanes are not suitable for high volumes of traffic. Policy D14 of the Sedgemoor Local Plan 2011-2032 (the Local Plan) seeks, amongst other things, to ensure that the expected volume of traffic generated by development does not compromise the function of the local road network. In this case, the nature of the permitted use, for pre-booked dog training on a one-to-one basis, or for small groups, dictates that traffic generation will be limited. The illustrative figures provided by the appellant indicate that in a worst-case scenario, a full day of group sessions would result in 48 traffic movements over the course of an eight-hour day, and the disputed condition allows for this number of movements on a Sunday. There is no evidence to suggest that the local road network has insufficient capacity to accommodate the same level of traffic on other days without compromising its function. The prohibition of any traffic movements on Mondays and Tuesdays, and the limitation to 18 movements on other days, is therefore not necessary, and places an unreasonable limitation on the operation of the business.

    I therefore find that the condition is not necessary in the interests of highway safety, or to preserve the function of the local road network, and that it would unreasonably limit the flexible operation of the business. Consequently, it fails the tests of necessity and reasonableness set out in the Planning Practice Guidance (the PPG)1.

    The PPG also advises that planning conditions should be enforceable. In this regard, the Council contends that the requirement to keep a record of vehicle movements would enable compliance with the condition to be monitored. However, it is uncertain how these records could be reconciled in the event of a complaint, or a dispute regarding the rigour of the recording. Furthermore, the condition places a limitation on vehicle movements, rather than the number of bookings or classes. The way in which participants access the site is not within the control of the appellant. Some may choose to share transport (thus reducing vehicle movements), whilst others may choose to be dropped off and picked up (thereby increasing traffic movements). Moreover, the appellants would have no control over potential clients who choose to arrive, via the public highway, without an appointment. It is unclear how the condition could be enforced in these circumstances.

    Paragraph 56 of the National Planning Policy Framework advises that planning conditions should be kept to a minimum, and only imposed where they are necessary, relevant to planning and to the development to be permitted, enforceable, precise, and reasonable in all other respects. I have found that the disputed condition is not necessary in the interests of highway safety or convenience, and places unreasonable restrictions on the permitted use. The development without the disputed condition would comply with Policy D14 of the Local Plan. The disputed condition also fails the test of enforceability. 1 Paragraph: 003 [name]: 21a-003-20190723

  4. Section 05

    Conclusion

    For the reasons given above, I conclude that the appeal should be allowed. I will vary the planning permission by deleting the disputed condition.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 377No official casework-database value to compare
    Extracted decision date · page 1
    15 April 2024Matches the official casework database
    Extracted site visit dates
    26 March 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3325216
Application reference
51/22/00035
Lead case reference
Not recorded
Planning authority
Somerset Council
Planning authority code
Not recorded

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Change of use
Appeal type reason
4. Grant planning permission for the development subject to conditions to which you object
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
1.51 hectares
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Yes
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
3 July 2023
Valid date
6 October 2023
Start date
3 January 2024
Planning authority decision date
19 May 2023
Appeal decision date
15 April 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
49513
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21