Appeal 3325276
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
Demolition of existing roof, gable ends, garage and attached garage outbuilding. Construction of a double storey side extension with a new hipped roof over, two front facing gables above the bay windows and change of windows and roof tiles all round.
Section 02
Decision
The appeal is allowed and planning permission is granted for Demolition of existing roof, gable ends, garage and attached garage outbuilding. Construction of a double storey side extension with a new hipped roof over, two front facing gables above the bay windows and change of windows and roof tiles all round at [site address] , [name], [postcode] in accordance with the terms of the application, Ref 23/0397/HOT, dated 14 February 2023, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
No development above existing ground level shall commence until details of the materials to be used in the construction of the external surfaces of the extension hereby permitted have been submitted to and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details.
The development hereby permitted shall be carried out in accordance with the following approved plans: 5922/1; 5922/2; 5922/3; 5922/4; and 5922/5.
The development must be carried out in accordance with the provisions of the [name] prepared by [name] received 15 February 2023 unless otherwise approved in writing by the Local Planning Authority.
The development must be carried out in accordance with the provisions of the Environment Agency Flood Risk Assessment received on 20 February 2023 and retained as such thereafter.
Section 03
Main Issue
The main issue is the effect of the proposal on the character and appearance of the host dwelling.
Section 04
Reasons
The appeal property is a two-storey detached dwelling located in a road comprising of semi-detached and detached dwellings many of which are of an Arts & [name], including the appeal property. The dwelling sits within a plot that is wider than most along this section of [address].
Policy LP1 of the London Borough of Richmond Local Plan (2018) (LP) seeks (amongst other matters) to maintain and, where possible, enhance the high architectural and urban design quality which contributes to the character and heritage of the area.
[address] Extensions and [name] (May 2015) (SPD) states (amongst other things) that side and rear extensions should harmonise with the original appearance of the dwelling either by integrating with the house or being made to appear as an obvious addition. The SPD also advises that two storey side extensions should not be greater than half the width of the original building to ensure the extension does not over-dominate the building’s original scale and character.
The width of the proposed two storey side extension would exceed half the width of the original dwelling and as such would not accord with the SPD. However, whilst the SPD provides useful design guidance it should not be applied rigidly or exclusively where there are other material considerations.
The proposed extension would represent a large addition to the dwelling. However, the host property would be remodelled and re-elevated so that the extension would appear fully integrated into the design of the dwelling. This would be achieved by two matching front gables above the bay windows, a new hipped roof over the entire dwelling, new fenestration and doors, and a decorative balcony across original and new elements.
The design approach is to replicate the appearance of the Arts and Crafts style of the adjacent semi-detached houses, [address] which are typical of the surrounding area. I acknowledge that the change of design to the roof of the dwelling would result in the loss of the side gables and chimneys of the original property, however, these elements of the dwelling are not of any particular merit and the extended dwelling would continue to display design features that are typical of this style of housing.
Therefore, whilst the design and appearance of the appeal property would be altered, in my view the proposed extension would be of a high quality architectural and urban design that would contribute to the character of the area, as required by Policy LP1 of the LP.
Thus, I conclude on this main issue that the proposed extension would not have a harmful effect on the character and appearance of the host dwelling. Despite some conflict with the SPD, I find that the proposal complies with the design objectives of Policy LP1 of the LP and the National Planning Policy Framework.
Section 05
Conditions
In addition to the standard implementation condition, the approved plans condition is imposed for certainty. A condition controlling the use of materials is necessary to protect the character and appearance of the dwelling and the local area. A condition requiring the implementation of the [name] is necessary in the interest of public safety. I have also imposed a condition to ensure that the development is carried out in accordance with the Flood Risk Assessment in the interests of public safety.
Section 06
Conclusion
For the reasons given above I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 334No official casework-database value to compare
- Extracted decision date · page 1
- 17 November 2023Matches the official casework database
- Extracted site visit dates
- 29 August 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3325276
- Application reference
- DC/NGL/23/0397/HOT
- Lead case reference
- Not recorded
- Planning authority
- Richmond Upon Thames London Borough Council
- Planning authority code
- E09000027
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 4 July 2023
- Valid date
- 4 July 2023
- Start date
- 3 August 2023
- Planning authority decision date
- 3 May 2023
- Appeal decision date
- 17 November 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 42150
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21