Skip to main content
Official casework recordDismissedCurrent release

Appeal 3325442

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

to erect a first floor rear extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main issues

    The main issues are the effect of the proposed development firstly, on the character and appearance of the host building and the local area; and secondly, on the living conditions of the occupiers of [address] with regard to outlook, visual impact and light.

  3. Section 04

    Character and appearance

    The appeal property is a mainly 2-storey end terrace house that addresses [address] within a predominantly residential area. Like some properties in the local area, No 50 has been externally altered and extended. In particular, the main roof has been converted from a hip to a gable end and a large flat roof dormer has been placed onto the extended rear roof slope. There is also an almost full width ground floor rear addition with a flat roof.

    The proposal is a first-floor rear extension that would be set back from the sides and rear of the ground floor projection. The new addition would be modest in scale with an eaves level that would align with that of the host building. That the proposed external materials would match the existing dwelling would unify its general appearance with the remainder of the building.

    However, the appeal scheme would add further to the scale and bulk of the built form at the rear of No 50. It would be seen along with the sizeable ground floor and dormer extensions, with the new roof projecting noticeably above the base of the existing dormer, creating an uneasy overlap between them. Furthermore, by exceeding more than one half of the width of the main house at first floor level, the proposal would conflict with the advice within [name] of the Council’s Planning and [name] (P&DG).

    When viewed together, the proposed and existing rear extensions, due to their scale, mass and height would result in a cumbersome enlargement of the appeal dwelling. In the light of the cumulative impact on the host building, the proposal would form an unwieldy feature in the new rear façade. Although the new extension would not be visible from the road, it would be readily evident from the back gardens of the properties on either side of the site. From these vantage points, the proposal would draw the eye as an obtrusive and unwelcome addition to both the host building and the local area.

    The appellant places some reliance on the Council’s decisions to approve first floor rear extensions to other properties in the local area, with some details and photographs provided. However, in the absence of plans of the individual schemes and the property concerned, I am unable to conclude that the circumstances of any of these cases are the same or very similar to the proposal. Consequently, I attach no more than limited weight to these decisions for the appeal scheme. In any event, each development should be considered on its own merits, as I have done in this instance.

    While there are examples of sizeable rear extensions to properties in the area surrounding the site, their presence does not necessarily signal that such schemes are therefore acceptable. From what I saw, existing rear extensions have blended into the visual character of the local area and respected the appearance and qualities of the host building with varying degrees of success. These cases serve to illustrate that changes to the upper part of a building can have a significant impact on the character and appearance of that building and the area to which it belongs. These examples do not persuade me that an unsympathetic form of development, as sought, is therefore justified.

  4. Section 05

    Living conditions

    The new extension would be set back from although close to the shared rear boundary between the site and [address]. Due to their staggered layout, the rear elevation of this adjacent residential property is set back from that of the appeal dwelling. As a result, the back garden nearest to the rear of No 48 would be further enclosed by the proposal, and the new extension would be evident from both here and the rear windows of the main house. From these vantage points, the new side wall would be seen along with the lengthy part 2-storey, part single storey flank wall of No 50. Due to their outward projection, height and position close to the shared boundary, the proposed and existing extensions would visually dominate the outlook from the rear of No 48 and their combined built presence would be unduly imposing on the occupiers of this adjacent property.

    There would also be some additional loss of natural light to the rear of No 48 during a major part of the day because of the proposal. However, the shade cast by the appeal scheme would mostly affect a small part of the neighbouring back garden and would not be appreciable given the shadow of the existing appeal building and the boundary fence that separates Nos 48 and 50.

    The Council also considers that the appellant has failed to demonstrate that the proposal would comply with the 45-degree code in relation to No 48, which is line drawn at this angle from a habitable room window that is likely to be affected by development. However, the Council also appears to acknowledge that the existing appeal dwelling may do likewise. On that basis, it seems to me that a further breach of the 45-degree code due to the proposal should not necessarily be determinative given the importance of also taking into account local circumstances.

  5. Section 06

    Conclusion on the main issues

    On the main issues, I conclude that the proposed development would cause significant harm to the character and appearance of the host building and the local area. It would also materially harm the living conditions of the occupiers of No 48. As such, the appeal scheme conflicts with Policies SP1 and CS22 of the Hertsmere Local Plan: [name], Policy SADM30 of the Site Allocations Development Management Policies Plan and the advice within the P&DG. These policies and guidance aim to ensure that development achieves high quality design and complements local character. It is also at odds with the National Planning Policy Framework, which states that development should be sympathetic to local character and add to the overall quality of an area.

  6. Section 07

    Other matters

    Once complete the proposal would provide an additional bedroom that would help meet the needs of a growing family. I share the Council’s view that the living conditions of the occupiers of the property that is attached to No 50 would not be adversely affected. However, these considerations do not outweigh the significant harm that I have identified.

    The Council appears to raise no objection to the new first floor side and rear windows to the main house. From the information before me, I have no reason to reach a different finding on these elements of the appeal scheme. However, from my inspection of the plans it is unclear whether these new windows are clearly severable from the proposed rear extension, which is objectionable. Therefore, I have not issued a split decision that grants planning permission solely for them.

  7. Section 08

    Conclusion

    Overall, the development conflicts with the development plan, when read as a whole. There are no material considerations, which indicate that the decision should be taken other than in accordance with the development plan.

    For the reasons set out above, and having regard to all other matters raised, I therefore conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 287No official casework-database value to compare
    Extracted decision date · page 1
    14 September 2023Matches the official casework database
    Extracted site visit dates
    5 September 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3325442
Application reference
23/0648/HSE
Lead case reference
Not recorded
Planning authority
Hertsmere Borough Council
Planning authority code
E07000098

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
10 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
6 July 2023
Valid date
6 July 2023
Start date
27 July 2023
Planning authority decision date
19 June 2023
Appeal decision date
14 September 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
38745
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21