Appeal 3325766
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
11 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described on the application form as, “First floor rear extension over existing kitchen”.
Section 02
Decision
The appeal is allowed and planning permission is granted for first floor rear extension at [site address] , [site address] , Linwood, Ringwood, [postcode] in accordance with the terms of the application, Ref 23/00497FULL, and subject to the conditions set out in the attached schedule.
Section 03
[name]
Differing to the description of development in the banner heading above, the Local Planning Authority’s (LPA) decision notice accurately describes the development as shown on the supporting plans as, “First floor rear extension”. I have used this description in my consideration of the appeal and in my decision since it best describes the proposed development in precise and concise terms.
Section 04
Main Issue
The main issue is whether the proposed development complies with local policies which seek to limit the scale of extensions to rural dwellings, with particular regard to the effect of the proposed development on the locally distinctive character of the built environment of the New Forest and the range and mix of housing stock available.
Section 05
Reasons
The appeal site comprises [site address] , an attractive detached dwelling sat within a rural area. Much of the site is surrounded by woodland, although fields are present to the north of the site and clusters of development, including a camping park, are present towards the north-west of the site.
[site address] has previously been extended. The LPA have calculated that previous extensions to [site address] have resulted in a floor area increase of approximately 55.9% (including the existing conservatory) above-and-beyond the floor area that existed in 1982, and this figure has not been disputed by the appellant. On this basis, [site address] currently breaches Policy DP36 of the New Forest National Park Local Plan 2016-2036 (adopted 2019) (Local Plan), which provides that, amongst other things, in the case of other dwellings (not small dwellings) outside the defined villages an extension must not increase the floorspace of the existing dwelling by more than 30%.
The proposed development would exacerbate the identified conflict with Policy DP36. The LPA have calculated that the proposed development would result in a floor area increase of approximately 76.3% (including the conservatory) above-and-beyond the floor area which existed in 1982, and the appellant’s figures do not suggest a significantly different percentage increase.
Nevertheless, the proposed first floor rear extension would merely add an extra bedroom to [site address] , resulting in a modest increase in its overall size and scale. Specifically, although the proposed development would raise the existing single-storey ridge it would be sufficiently lower than the ridge height of the main part of [site address] such that the extension would remain subservient to it. Additionally, the roof pitch of the proposed extension and the materials used would complement the appearance of [site address] . The proposed development would accordingly retain the rural character of [site address] .
Due to the proposed development being to the rear of [site address] and the dense vegetation which surrounds much of the plot, the proposed development would likely be imperceptible from public vantage points.
Hence, the proposed development would not erode the National Park’s local character, or result in any meaningful gradual suburbanising effect within the National Park, which Policy SP17 of the Local Plan seeks to address. Thus, the proposed development would not have an adverse impact on the locally distinctive character of the built environment of the New Forest. The landscape and scenic beauty of the National Park would also be conserved.
Although the LPA have referred in general terms to the mix and range of housing within the National Park, and to house prices, few details have been provided to demonstrate that the addition of one extra bedroom to [site address] would result in any adverse impacts in these respects in real terms. In contrast, the appellant has provided information regarding the sizes and prices of houses in the local area. From the details provided it is clear that extending [site address] from 2 to 3 bedrooms would not alter its status as a mid-range property in terms of its floorspace and price in its local context.
For the above-mentioned reasons, whilst the proposed development would exacerbate the existing conflict with Policy DP36, very little weight is given to this matter.
I have had regard to appeal decision [name]/B9506/D/22/3307317. The Inspector described that development as involving a sizeable extension with extensive glazing. Due to the modest scale of the proposed development, that appeal decision is not directly comparable with the appeal proposal. It does not change my findings as a result.
I therefore find that, whilst the proposed development would exacerbate the existing conflict with Policy DP36, it would not cause adverse impacts with respect to the locally distinctive character of the built environment of the New Forest and the range and mix of housing stock available.
It follows that the proposed development would not undermine the relevant aims and objectives of Policies SP17 and DP36 of the Local Plan. Taking all of the above into account, as a matter of planning judgement I find that the proposed development would not conflict with the development plan when read as a whole.
Section 06
Other Matters
Any future planning applications would be decided on their own merits. As such, the proposed development would not set a precedent.
Section 07
Conditions
I have had regard to the conditions suggested by the LPA. I have considered them against the advice on conditions set out in the National Planning Policy Framework (the Framework) and the Planning Practice Guidance (PPG).
Section 08
Conditions imposed
Conditions are necessary, in the interests of clarity and enforceability, setting out the timescale for the commencement of development (condition 1) and the approved plans (condition 2), respectively.
Although the submitted [name] and [name] report (bat surveys report) stated that bats are very unlikely to be roosting within [site address] , bats were recorded as commuting through the site. Bats are a protected species, and as the bat surveys report has referred to the potential for bats to roost within [site address] at any time, a condition is necessary requiring compliance with the recommendations made within that report (condition 3). This includes a precautionary working method and a low-impact lighting strategy.
Section 09
Conditions not imposed
I have not imposed a condition requiring the control of the external materials since sufficient detail thereof is shown on the approved plans which are covered by a separate condition.
Although the bat surveys report, at Table 3, suggests the installation of a minimum of 2 bat boxes on site, these are not strictly necessary for adverse impacts on bats to be avoided. A condition is not therefore necessary requiring compliance with the ‘Enhancements’ measures detailed in Table 3 of the bat surveys report. The appellant will nevertheless be aware of the suggestion in this regard contained within the submitted bat surveys report.
Whilst reference has been made to Policies SP5 and SP6 of the Local Plan, which collectively provide that, amongst other things, proposals should protect, maintain and enhance nationally, regionally and locally important sites and features of the natural environment, including habitats and species of biodiversity importance, geological features and the water environment, the application was not refused on this basis.
In relation to this, the [name] has mentioned that, given the scale of the proposed development, any impact on the adjacent Site of Special Scientific Interest and internationally protected sites from pollution arising from vehicle parking, storage of materials and other site operations, may be ‘less likely’. The evidence before me does not indicate that adverse impacts in these respects would occur, and given the small scale of the proposed development and the likely limited duration of the construction works associated with it, I consider that a Construction Environmental Management Plan is not required in this instance.
Paragraph 54 of the Framework provides that, amongst other things, planning conditions should not be used to restrict national permitted development rights unless there is clear justification to do so. The PPG advises that conditions restricting the future use of permitted development rights may not pass the test of reasonableness or necessity1.
Few details have been provided to substantiate the assertion that the exercise of permitted development rights under [name] and C of Part 1 of Schedule 2 of the GPDO2 in conjunction with the proposed development, would result in [site address] being of such a size that it would be inappropriate in its location in the countryside, or that the existing breach of Policy DP36 of the Local Plan would be unduly exacerbated. Considering this, and noting that Class A in particular is subject to several limitations, including in relation to the maximum length of an extension beyond the rear wall of the original dwellinghouse, on the basis of the evidence before me it would not be necessary for these permitted development rights to be restricted.
Section 10
Conclusion
For the reasons given above, having considered the development plan as a whole, the approach in the Framework, and all other relevant material considerations, and having taken account of the representations of Ellingham, Harbridge and Ibsley Parish Council, I conclude that the appeal should be allowed.
Section 11
Conditions Schedule
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan (1:1250), Proposed layouts ([name]. WDB-028-02) ([name]), [name] ([name]. WDB-028-04) ([name]), Details ([name]. WDB-028-05) ([name]).
The development hereby permitted shall be carried out in accordance with the measures specified in the ‘Recommendations’ section of Table 3 of the [name] and [name] report (Arbtech) (7 February 2023), unless otherwise agreed in writing by the Local Planning Authority. End of Conditions Schedule
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 368No official casework-database value to compare
- Extracted decision date · page 1
- 8 April 2024Matches the official casework database
- Extracted site visit dates
- 13 February 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3325766
- Application reference
- 23/00497
- Lead case reference
- Not recorded
- Planning authority
- New Forest
- Planning authority code
- E26000009
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 23 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 11 July 2023
- Valid date
- 11 July 2023
- Start date
- 20 September 2023
- Planning authority decision date
- 20 June 2023
- Appeal decision date
- 8 April 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 49111
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21