Skip to main content
Official casework recordDismissedCurrent release

Appeal 3326942

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

erection of oak framed garage with first floor home office space.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The description of development on the appeal form differs slightly from that on the application form. No confirmation has been provided of an agreed change in description therefore I have used the description as set out on the application form.

    [name] 2023, a revised version of the National Planning Policy Framework (the Framework) was published. The paragraphs most pertinent to this appeal are unchanged, other than their numbering. As such, neither party is prejudiced by a lack of consultation on the revised Framework.

  3. Section 04

    [name]

    The appeal site is within the Green Belt, and therefore the main issues are: • whether the proposed development would be inappropriate development in the Green Belt having regard to the Framework and any relevant development plan policies; • the effect of the proposal on the openness of the Green Belt; and • whether the harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations so as to amount to the very special circumstances required to justify the proposal.

  4. Section 05

    Inappropriate development

    The Framework identifies that the fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open. It goes on to state that the construction of new buildings in the Green Belt is inappropriate development, which is, by definition, harmful and should not be approved except in very special circumstances.

    There are however a limited number of exceptions to this, as set out in paragraph 154 of the Framework. One exception under sub-paragraph c), is the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building1.

    Policy BDP4.4 of the Bromsgrove District Plan 2017 (BDP) sets out that the development of new buildings in the Green Belt is considered to be inappropriate, except in certain circumstances. These circumstances include extensions to existing residential dwellings up to a maximum of 40% increase of the original dwelling or increases up to a maximum total floor space of 140m2 (‘original’ dwelling plus extension(s)) provided that this scale of development has no adverse impact on the openness of the Green Belt. I am therefore satisfied that Policy BDP4.4 broadly conforms to the Framework, albeit with reference to an earlier version.

    There is no specific exception within the Framework, nor within Policy BD4.4 for the construction of ancillary outbuildings.

    The appellant draws my attention that the Council’s consideration of the planning application is based on the fact that the proposal is within 5m of the existing dwelling, and that this factor is not referenced within the Council’s policies or guidance. Furthermore, the appellant suggests that the Council’s approach might be based on permitted development rights as they existed in 1995, when a determining factor in deciding whether or not a curtilage building was to be considered as an extension was if it was within 5m of an existing dwelling. However, there is no substantive evidence before me to demonstrate the gestation of the Council’s policy.

    In any event, it is a matter of established practice to assess whether a detached outbuilding serving a residential use falls to be considered as an extension, having regard to certain factors including its purpose, use, size and relationship to the original building.

    The proposal would result in a detached outbuilding to provide a garage with home office above to serve an existing dwelling. In this regard, its purpose and use would be ancillary to the existing dwelling. The outbuilding would be within about 1.5m of the existing dwelling, and therefore the proposal would form a normal domestic adjunct. In such circumstances, I find that the outbuilding should be considered as an extension under paragraph 154c) of the Framework and Policy 4.4 c) of the BDP.

    The Council calculates that the existing dwelling has been extended by about 167.96%; that the proposal would result in additional floor area of 76.40%; and that the cumulative increase would be about 244.36% above that of the original building. These figures are not disputed by the appellant. The resulting cumulative increase would significantly exceed the size limitations for extensions as set out within Policy BDP4.4. The cumulative increase would amount to a substantial addition, which I find to be disproportionate over and above the size of the original building.

    For these reasons, the proposal would be inappropriate development in the Green Belt which is, by definition, harmful. It conflicts with Policy BDP4 of the 1 The Framework defines ‘original building’ as the building as it existed on 1 July 1948, or if it was constructed after that date, as it was built originally. BDP, paragraph 154(c) of the Framework and the guidance within the [name] Planning Document 2019.

  5. Section 06

    Openness

    The Framework identifies the essential characteristics of Green Belts as being their openness and their permanence. Openness is an essential characteristic of the Green Belt, and it has a spatial as well as a visual aspect. ‘Open’ can mean the absence of development in spatial terms, and it follows that openness can be harmed even when development is not readily visible from the public realm.

    The outbuilding would be of a considerable footprint and volume, due to its overall scale, height, width and depth. Therefore, it would represent a significant spatial impact upon the openness of the Green Belt.

    Due to its siting, the proposal would be largely screened from public view from the street by the existing dwelling and existing vegetation along the boundary of the appeal site adjacent to the road. The wider landscape beyond the appeal site appears as open countryside, rising to the east, such that the proposal would have a limited visual impact.

    The appellant draws my attention to the Planning Practice Guidance regarding openness of the Green Belt, and the sustainable credentials of the proposal, which include the method of construction and materials to be used. In this regard, the appellant argues that the proposed outbuilding could be dismantled and materials used elsewhere, and the land would return to its original state, which is presently a gravelled surface. However, the proposal before me is not for a temporary period, and given the permanent nature of the existing dwelling, the impact of the proposal in terms of duration and remediability is a neutral factor in my assessment.

    The proposal would not result in increased traffic generation. The home office would enable working from home or hybrid working and could thus reduce trips by private car. However, this would be limited in scale, and thus the positive impact upon openness would be limited.

    I therefore conclude that overall, the proposal would fail to preserve the openness of the Green Belt.

  6. Section 07

    Other considerations

    The fact that the proposal does not result in any harm to the amenities of neighbouring occupiers is a neutral factor in my assessment, carrying no weight for or against the proposal, as does the fact that the design of the outbuilding is acceptable. The use of sustainable materials and construction methods is a limited benefit in favour of the proposal.

    The proposal would enhance the living conditions of the occupiers of the property, providing them with garaging and a home office, but this would be a private benefit. In any event, it has not been demonstrated that the proposal is the only way to achieve the objective of a secure and quiet home working space.

    The appellant suggests that a single storey outbuilding to a height of 4m could be erected by virtue of permitted development rights under Class E of the GPDO2. In this regard, the appellant argues that only the portion of the building above one storey (about 1.8m) should be evaluated. However, the proposal before me is for a single operation falling within the meaning of development as set out in section 55 of the Town and Country Planning Act 1990, and therefore it is necessary to consider the proposal as a whole.

    In any event, permitted development rights under Class E represents a theoretical fallback position. I have not been provided with clear and compelling evidence that a single storey proposal would meet the limitations as set out in the GPDO, and I have no substantive evidence to indicate that there is a significant probability that such a fallback position would be constructed should this appeal be dismissed.

    On this basis, and in the absence of any prior approval consent or lawful development certificate, I cannot therefore be certain that even if there was a realistic prospect of such a fallback, that it would result in the same or greater harm than I have identified with the scheme before me. Consequently, the potential fallback position attracts negligible weight.

  7. Section 08

    Green Belt Balance

    The proposed development would be inappropriate development in the Green Belt and would fail to preserve the openness of the Green Belt. The Framework establishes that substantial weight should be given to any harm to the Green Belt.

    The Framework makes clear that the harm to the Green Belt by reason of inappropriateness, and any other harm resulting from the development, must be clearly outweighed by other considerations for planning permission to be granted. I find that the limited benefits of the proposal do not outweigh the substantial harm to the Green Belt. Therefore, the very special circumstances necessary to justify the proposal do not exist in this case.

  8. Section 09

    Conclusion

    For the reasons given above, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5599No official casework-database value to compare
    Extracted decision date · page 1
    18 April 2024Matches the official casework database
    Extracted site visit dates
    6 February 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3326942
Application reference
23/00408/FUL
Lead case reference
Not recorded
Planning authority
Bromsgrove District Council
Planning authority code
E07000234

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
31 July 2023
Valid date
3 August 2023
Start date
20 October 2023
Planning authority decision date
19 June 2023
Appeal decision date
18 April 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
49701
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21