Appeal 3327063
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a “single storey extension to front/side”.
Section 02
Decision
The appeal is allowed, and planning permission is granted for a single storey extension to front/side at [site address] in accordance with the terms of the application, Ref 23/0057/FUL, dated 18 January 2023, and the plans submitted with it, subject to the following
Section 03
conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: [name]; [name]; [name]; Existing & [name]; Section through Extension (all plans unreferenced and undated).
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
Section 04
Preliminary Matters
The Council altered the description of the development during the consideration of the application to read “single storey extension to front/side”. This is a more concise description of the proposal and removes superfluous text from that set out in the application form. From the evidence before me, I consider this to be an accurate description of what is proposed. I am satisfied therefore that the main parties would not be prejudiced by the use of the above description. I have determined the appeal accordingly.
The Government published a revised National Planning Policy Framework (the Framework) in December 2023. This does not materially change the planning policy context in respect of the main issues, and I have determined the appeal accordingly.
Section 05
[name]
The main issues are the effect of the proposed development on: • The character and appearance of the site and the surrounding area; and • Highway safety and the freeflow of traffic.
Section 06
Character and Appearance
The appeal property is a semi-detached two storey dwelling on [address]. It is located within a residential setting in an area of other similar properties. Many nearby properties including its neighbours’ benefit from extensions to the side and front which vary in size and design.
The proposal involves a modestly sized extension at ground floor which would extend the full length of the side elevation and create a porch on the front elevation which would also extend the garage forward of the existing building line. It would match the existing dwelling in both materials and style.
The design of porches and extensions within the avenue and on other streets nearby vary. Although the roof design of the proposal would contrast in appearance to that of the side extension on the adjacent property at [address], the proposal would not appear incongruous or out of place in its surroundings. Furthermore, the extension would not fundamentally alter the character or appearance of the host property.
The Council refers to conflict with the Middlesborough Design Guide Supplementary Planning Document 2013 (SPD) with regard to extensions on the front of properties. However, porches are commonplace extensions on the front elevation of residential properties. The garage extension, in this instance would be modest in size and would reflect the design, proportions and materials of the existing dwelling. As the appeal property lies within a row of properties, its side elevation would not be prominent, and the proposal would be generally in keeping with the wider street scene.
For these reasons, I conclude that there would be no harm to the character or appearance of the appeal property or the surrounding area. Consequently, I find no conflict with Policies DC1 and CS5 of Middlesborough’s Local Development Framework Core Strategy 2008 which, amongst other things, seek to ensure that development is well integrated into its context and enhances the built environment. However, I find no conflict with the guidance set out in the SPD and the proposal would still comply with its overall amenity and design aims and those contained within the development plan as a whole.
Section 07
[name]
The proposal involves the conversion of the existing garage to create a storage space with living accommodation behind. The garage door would be stepped forward of its existing position by approximately 1 metre.
The length of the resultant driveway is disputed between the parties with lengths of 4.7 metres and 5.5 metres stated. Although the Council’s officer report states that residential driveways should be no less than 5 metres in length, I have not been provided with any policy or guidance which compels this. From what I observed on site, the driveway would be similar to others on the street. It would be adequate in length to ensure that a vehicle would not overhang onto the highway, and therefore highway safety and the freeflow of traffic, particularly close to a school, would not be compromised.
Accordingly, I conclude that that the proposal would not have any adverse effect on highway safety and the freeflow of traffic. Therefore, there would be no conflict with Core Strategy Policy DC1 which, amongst other things, seeks to ensure that new developments do not impact on highway safety.
Section 08
Conditions
In addition to the standard time limit condition, I have imposed a condition requiring that the development is carried out in accordance with the approved plans and a condition that requires the external materials to match the existing dwelling. These conditions are required for clarity and to protect the character and appearance of the host building and wider area.
Section 09
Conclusion
For the reasons given above, having considered the development plan when read as a whole and all other issues raised, I conclude that the appeal should be allowed subject to the conditions set out above.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3511No official casework-database value to compare
- Extracted decision date · page 1
- 21 February 2024Matches the official casework database
- Extracted site visit dates
- 6 February 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3327063
- Application reference
- 23/0057/FUL
- Lead case reference
- Not recorded
- Planning authority
- Middlesbrough Council *
- Planning authority code
- E06000002
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 3 July 2023
- Valid date
- 14 August 2023
- Start date
- 27 September 2023
- Planning authority decision date
- 14 April 2023
- Appeal decision date
- 21 February 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 46910
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21