Appeal 3327628
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
part single, part two storey front/side extension, construction of a new garage, raise ridge height to incorporate loft conversion with front and rear dormers and fenestration alterations
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary matters
The application form described the proposed development as ‘single and two storey extension, re-roof and loft conversion’. The council changed this to the description used in the heading above, as did the appeal form. I have adopted it as it more clearly identifies the development proposed.
Section 04
[name]
The main issues in this case are: i) whether the proposed development would provide a satisfactory level of natural light to the second floor bedrooms for occupiers; and ii) the effect of the proposed front dormers on the character and appearance of the dwelling and that of the wider streetscene.
Section 05
Reasons
The appeal site is a two-storey detached dwelling with a detached outbuilding to the east of the property within the curtilage. The development of the surrounding area is predominantly detached bungalows and two storey dwellings, in a combination of hipped and gable roof profiles which, in the immediate surrounding area, are free of additional dormers.
Policy EC2 of the council’s adopted Local Plan seeks a high standard of design in all developments. Regard is to be given to the scale, density, siting, design, layout and external materials of any development, which shall be appropriate to its setting, and which should not harm the character of its surroundings. This is consistent with the National Planning Policy Framework (the Framework). Also of relevance in this case is the council’s Residential Design Guidance Supplementary Planning Document (SPD)
Section 06
The level of natural light to the second floor bedrooms
Within the SPD, policy RDG5 deals with privacy and living conditions. Among other matters, it seeks to ensure that windows should be of a size which provides for adequate natural light and ventilation to enter the room they serve. In pursuance of this policy, an assessment was carried out by the officer in accordance with the [name] methodology. The calculation given in the officer’s report showed that the second floor bedrooms would be excessively deep and would not receive adequate levels of natural light to the rear of the rooms.
The appellant’s response to this issue is that the council has approved other developments that equally fail to meet the recommended standard. I have not been provided with any additional background information about the cases cited, but in any event the fact that there have been other developments allowed that are not of the required standard does not justify continuing to grant permission for unsatisfactory daylight in rooms likely to be occupied for lengthy periods. Further, it appears to me that a satisfactory design might well be achieved, within the constraints of the space available, that would provide adequate levels of natural light. In any event, this is a shortcoming, contrary to RDG5, that stands against the grant of planning permission. The effect of the proposed front dormers on the character and appearance of the dwelling and that of the wider streetscene
The policy at RDG7 of the SPD, which deals with roof development, has the following text which is relevant to this case: “Dormers should be an ancillary feature on the roofscape and must not dominate the roofscape. They must be provided with substantial roof verges above, below and to the sides. Dormers projecting above the ridge line or beyond a roofline, e.g. hip, will be refused”, and “Fenestration should be aligned both vertically and horizontally, in roof planes and dwelling elevations, particularly when integrating new development with existing dwellings”.
The officer’s report accepts that the dormers meet this guidance, but I disagree. The 2 front dormers have their ridges meet the main roof at the same level as its ridge. That does not amount to providing substantial ‘verges’ (space) above the dormers. Nor, in my view, is there sufficient space below the dormers to the eaves for satisfactory appearance as elements that are incidental and do not dominate the roof. Furthermore, the dormers do not have a satisfactory relationship with the windows at ground and first floor level, which are aligned vertically and horizontally. These shortcoming amount to poor design.
In much the same way as the first issue is responded to, it is argued for the appellant that there are similar examples in the vicinity and therefore the appeal proposal should be allowed. I do not accept this as a valid argument. The design of the 2 front dormers is poor and does not reflect the guidance set out in policy RDG7 of the adopted SPD. The further suggestion that [address], or the site itself, is somehow unique is not persuasive.
Section 07
Conclusions
I have found that the second floor bedrooms would be excessively deep and would fail to provide adequate levels of natural light to the rear of the rooms in breach of SPD policy RDG5. In addition, for the reasons set out paragraph 9 above, the design of the front dormers fails to meet a satisfactory standard and does not meet the requirements of policy RDG7. Failure to satisfy both issues means that the appeal must fail. The appeal will be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 129No official casework-database value to compare
- Extracted site visit dates
- 12 December 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3327628
- Application reference
- 23/0226/FUL
- Lead case reference
- Not recorded
- Planning authority
- Castle Point Borough Council
- Planning authority code
- E07000069
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 114 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 10 August 2023
- Valid date
- 18 August 2023
- Start date
- 20 October 2023
- Planning authority decision date
- 19 June 2023
- Appeal decision date
- 28 December 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 44199
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21