Skip to main content
Official casework recordSplit DecisionCurrent release

Appeal 3328308

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

roof alterations; recladding; alterations to doors and windows; new porch; relocating of 2 no.sheds; new 1 metre high fence with gate without complying with conditions attached to planning permission Ref 22/00566, dated 15 November 2022.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for roof alterations, re-cladding, alterations to doors and windows, new porch, relocating of 2no.sheds, new 1m high fence with gate at [address], [site address] Annexe, [address], Boldre, Hampshire [postcode] in accordance with the application Ref 23/00300VAR, without compliance with condition numbers 2 and 4 previously imposed on planning permission Ref 22/00566, dated 15 November 2022 and subject to the following conditions:

    The development hereby permitted shall be carried out in accordance with the following approved plans: Sheet 1 [name] 01/07/2022, Sheet 2 [name] 23/02/2023.

    The outbuildings the subject of this permission shall only be used for purposes incidental to the dwelling on the site and shall not be used for habitable accommodation such as kitchens, living rooms and bedrooms.

    The external facing and roofing materials shall be as shown on the approved plans.

    No external lighting shall be installed on the site unless details of such proposals have been submitted to and approved in writing by the New Forest National Park Authority.

    The open-sided porch shall at no point be in-filled or incorporated into the main dwellinghouse.

  2. Section 03

    Applications for costs

    An application for costs was made by the appellant against the Council. This application is the subject of a separate decision.

  3. Section 04

    Preliminary Matters

    I observed at the site visit that the rear elevation has been constructed using brickwork. The Council have indicated that this was carried out at the time that they issued their decision. However there is no indication that it had been carried out at the time the planning application was made. Consequently, I have dealt with the appeal under s73 of the Town and Country Planning Act 1990 (the Act).

    The proposal involves a number of elements including; replace the approved timber cladding on the rear elevation with brickwork; brick up sides of porch to 1m high; timber cladding to be vertical rather than horizontal; replace the 2 sheds with 1 shed slightly larger than the 2 – size as per drawing; replace bi-fold doors to rear elevation with window and bi fold door; replace the approved red ridge tile with grey and add roof light to flat roof over bedroom.

    I note that the original permission itself has been amended following a subsequent application under s96A of the Act. The Council have accepted that except for replacing the timber cladding on the rear elevation with brick work and the proposed bricking up of the sides of the porch, all other elements included as part of this appeal proposal are non-material amendments to the original planning permission and can be implemented. It follows that the only elements at issue are the use of brickwork on the rear elevation and the proposed bricking up of the sides of the porch and I have determined the appeal on that basis.

  4. Section 05

    Main Issue

    The main issue is whether or not the retention of conditions 2 and 4 in their current form are necessary to ensure that the proposed and implemented changes to the dwelling do not conflict with development plan policies that deal with replacement dwellings or extensions to dwellings.

  5. Section 06

    Reasons

    The appeal site comprises a modest single storey dwelling which is part of a cluster of properties that are accessed from [address]. The appeal property is an attractive modest single storey dwelling that fits harmoniously into this setting.

    As outlined above, although the proposal involves several elements, the vast majority of these can be implemented. There are two outstanding elements for me to consider. The first would involve the introduction of a 1 metre wall on either side of the existing open porch. The second element has already been undertaken and involves the replacement of timber cladding on part of the rear elevation with red stock bricks.

    The Council has argued that the proposal falls outside the scope of a minor material amendment. However, caselaw1 makes it clear that an application under s73 of the Act, is not limited to minor material amendments. Consequently, this is not a test that should be applied in the case of a s73 application. However, the Council in its Planning Report also consider that the scheme falls outside the scope of a s73 application because the changes to the porch would conflict with a planning condition and the works to the rear wall are not re-cladding but a matter that would require planning permission in its own right. These are matters which do require consideration and I examine them below.

    The proposed introduction of a 1 metre wall on either side of the existing porch would involve a very modest change to the existing building. Such a change would not result in any unacceptable harm to the character and appearance of the area or to the host building or the setting of the nearby [name] listed building. Moreover, although it would result in the introduction of a section of solid wall on either side of the porch, most of the side elevations and the entire front of the porch would remain open.

    As a result, the proposal would not result in unacceptable infilling of the porch, nor would it result in the porch being incorporated into the main dwelling house. Policy DP36 of the New Forest National Park Local Plan 2016-2036 adopted August 2019 (NFNPLP) deals with extensions to dwellings and sets out that extensions will not be permitted where the existing dwelling is the result of an unauthorised use. However, given my findings above, I do not consider the proposal amounts to an extension to the existing dwelling. It follows that this element would not conflict with Policy DP36 of the NFNPLP.

    Further, this element would not conflict with Condition 6 attached to planning permission Ref 22/00566, dated 15 November 2022, as the sides of the porch would remain open-sided above the 1 metre wall and therefore the porch would not be in-filled to such an extent that it should be considered to be incorporated into the main dwelling house as a living space. It follows that I am satisfied that I can deal with this matter under s73 of the Act.

    The other element at issue is the replacement of timber cladding on part of the rear elevation with red stock bricks. That work has already been completed and I observed that the use of this material is entirely compatible with both the host building and the wider area. As a result, again this element does not harm the character and appearance of the host building, the wider area or the setting of the nearby [name] listed building.

    Policy DP35 of NFNPLP deals with replacement dwellings and among other things sets out that replacement of existing dwellings will be permitted except where the existing dwelling is the result of an unauthorised use. The Council acknowledge that the replacement of the elevation does not equate to the replacement of the dwelling as a whole. I agree. 1 Armstrong v Secretary of State for [name], Housing and Communities [2023] EWHC 142 (KB)

    Further, the change of material from the approved timber cladding to red stock bricks for part of the rear elevation does not amount to the appeal property being rebuilt, substantially altered or being tantamount to a replacement dwelling. Rather, it is a modest alteration to the dwelling house which causes no material harm. Consequently, the development does not conflict with Policy DP35 of the NFNPLP.

    Furthermore, I consider that I can deal with this aspect of the proposal under s73 of the Act as the scheme would still involve re-cladding, but only in respect of three of the four elevations. The description of the development does not specify which elevations would be re-clad and, therefore, the change to provide the brick work to one elevation, and which would form part of the amended plans, would not be contrary to the description as a whole. I do not consider that every aspect of a scheme is required to be included in the description of the development to fall within the scope of works that can be considered and permitted if the case is justified. Consequently, while I understand the point that the Council makes, in this case, the details of the scheme and the wording of the description of the development are not incompatible with a proposal under s73 of the Act.

    I therefore conclude that the scheme can be considered under s73 of the Act and that the retention of conditions 2 and 4 in their current form are not necessary as, for the reasons set out above, the proposed and implemented changes to the dwelling would not result in any material harm and would not conflict with Policies DP35 and DP36 of the NFNPLP.

  6. Section 07

    Conditions

    By allowing this appeal a new planning permission is created. The guidance in the Planning Practice Guidance makes clear that decision notices for the grant of planning permission under section 73 should also restate the conditions imposed on earlier permissions that continue to have effect.

    As the development has already started it is unnecessary for me to attach the commencement of development condition. Although some conditions may have been discharged, I have limited information before me about the status of the conditions imposed on the original planning permission. Accordingly, I shall impose all those that I consider remain relevant. If some conditions have in fact been discharged, that is a matter which can be addressed by the parties.

    On that basis, a condition is needed to secure compliance with the approved plans, for the avoidance of doubt and in the interests of proper planning. In the interests of the character and appearance of the area and proper planning it is necessary to impose conditions to ensure any outbuildings are used for purposes incidental to the dwelling, requiring the use of appropriate materials, that there is adequate control of lighting and that the open sided porch cannot be in-filled or incorporated into the main dwellinghouse.

  7. Section 08

    Conclusion

    For the reasons given above I conclude that overall, the proposed introduction of a 1 metre wall on either side of the existing open porch and the replacement of timber cladding on part of the rear elevation with red stock bricks does not conflict with the development plan and therefore the appeal should be allowed. I will therefore grant a new planning permission with all the changes as shown on the revised plans and subject to the specified planning conditions.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 19589No official casework-database value to compare
    Extracted decision date · page 1
    15 May 2024Matches the official casework database
    Extracted site visit dates
    24 April 2024 (page 1)
  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 19589No official casework-database value to compare
    Extracted decision date · page 1
    15 May 2024Matches the official casework database
    Extracted site visit dates
    24 April 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3328308
Application reference
23/00300VAR
Lead case reference
Not recorded
Planning authority
New Forest
Planning authority code
E26000009

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
2. Refused permission to vary or remove a condition(s)
Appeal reason
Appeal Against Conditions
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
0 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Split Decision
Decision category
Split decision
Received date
23 August 2023
Valid date
10 September 2023
Start date
22 November 2023
Planning authority decision date
12 June 2023
Appeal decision date
15 May 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
51078
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21