Skip to main content
Official casework recordAllowedCurrent release

Appeal 3328423

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as the erection of two dormer windows to the rear roof slope.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the erection of two dormer windows to the rear roof slope at [site address] in accordance with the terms of the application, Ref 230454, dated 5 April 2023, subject to the following conditions:

    The development hereby permitted shall be begun within three years of the date of this permission.

    The development hereby permitted shall be carried out in accordance with the following approved plans and retained as such: PP-06 – Proposed Ground Floor Plan; PP-07 – Proposed First Floor Plan; PP-08 – Proposed Loft Floor Plan; PP-09 – Proposed Roof Top Plan; PP-10 – Proposed Section and Elevations; and PP-11 – Existing & Proposed Site Plan.

    The external finishes including materials used in the development hereby permitted shall match those of the existing dwelling and shall be retained as such.

  2. Section 03

    Preliminary Matters

    The proposal lies within the [address]/[address]/[address] Conservation Area (“the CA”). Section 72 (1) of the Planning (Listed Building and Conservation Areas) Act 1990 places a duty on decision makers with respect to any buildings or land within a Conservation Area, to pay special attention to the desirability of preserving or enhancing the character or appearance of that area.

  3. Section 04

    Main Issue

    The main issue is therefore whether the proposed development would preserve or enhance the character or appearance of the area including the CA.

  4. Section 05

    Reasons

    The appeal site comprises a two-storey, end terrace dwelling fronting [address]. To the flank side there are deep garden areas which serve the properties fronting [address]. To the rear of the appeal site there is a parking area and gardens which separate the appeal site from the buildings facing [address].

    The significance of this part of the CA is defined, in part, by a pleasing mix of buildings which date back to at least the early 19th century. [address] itself comprises smaller scaled ‘cottage-style’ polychrome terrace housing with a shared identity.

    As one travels beyond the rear of the appeal site, the built form transitions to the grander Georgian tall terraces which face onto [address] some of which feature dormer style windows. This mix in building types and sizes adds a sense of curiosity and charm to this part of the historic environment and invites the observer to consider the growth and evolution of the CA.

    The proposed development would introduce two modestly designed dormer windows to the rear of the appeal property with no discernible change to the front elevation facing [address].

    The proposed development is to the rear of an otherwise undeveloped historic roofscape. However, each dormer window would be set into the roof slope with a proportionate width, height and depth when compared to the existing building. It would also line up vertically with the existing rear windows and would be appropriately separated from the ridge, eaves and side boundaries of the host building.

    Therefore, when viewed in the context of the roofscape and wider terrace, the proposed development would add some variation while retaining the distinctiveness of the existing roofscape. This would coherently integrate into the host building and add further interest to the existing mix of buildings within the CA.

    While land levels change across the CA, the proposed development would be reasonably well separated or screened from any other viewpoints and would be erected in materials to match the existing dwelling.

    It is not clear why brick is suggested by the Council as a more suitable material. Particularly as existing dormer windows nearby, such as 48 and [address], comprise hanging tiles that match the existing roof. The proposed development’s matching materials would be appropriate.

    [name] listed buildings, which include [address], [address] and 48 and [address], are sited in the vicinity of the appeal site. These buildings contribute positively to the locality. The Council do not object to the proposed development based on any harm to the setting of these buildings and given my findings above, I am inclined to agree.

    As a result, the proposed development would respond positively to the local context therefore respecting the character of the appeal dwelling, neighbouring properties and the wider area. This would ensure there would be no harm to the significance of the CA.

    The proposed development would therefore preserve the character or appearance of the area including the CA. As a result, it complies with the relevant provisions of Policies CC7, EN1 & EN3 of the Reading Borough Council Local Plan 2019. These, amongst other things, seek to preserve or enhance the significance of the character or appearance of the area including heritage assets.

  5. Section 06

    Conditions

    I have attached conditions on the time limit for development and plans in the interests of certainty. The incorporation of appropriate matching materials would be essential to the success of this proposed development and how it would integrate into the CA. Therefore, a condition ensuring materials match the existing is also necessary.

  6. Section 07

    Conclusion

    For the above reasons, having regard to the development plan as a whole and all other relevant considerations, the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1630No official casework-database value to compare
    Extracted decision date · page 1
    24 January 2024Matches the official casework database
    Extracted site visit dates
    3 January 2024 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3328423
Application reference
230454
Lead case reference
Not recorded
Planning authority
Reading Borough Council
Planning authority code
E06000038

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Yes
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
24 August 2023
Valid date
24 August 2023
Start date
9 November 2023
Planning authority decision date
1 June 2023
Appeal decision date
24 January 2024

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
45275
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:27
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21