Appeal 3328597
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
12 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as retention of summerhouse (as built).
Section 02
Decision
Appeal A is allowed and planning permission is granted for summerhouse at [site address] , Longfield, Kent [postcode] in accordance with the terms of the application, Ref 22/01325/FUL, and the plans submitted with it, subject to the conditions in the attached schedule.
Appeal B is allowed and planning permission is granted for pool building at [site address] , Longfield, Kent [postcode] in accordance with the terms of the application, Ref 22/01326/FUL, and the plans submitted with it, subject to the conditions in the attached schedule.
Section 03
Preliminary Matters
In allowing both Appeal A and [name] have amended the descriptions of development, by removing words that are not acts of development.
As set out above there are two appeals on the same site. They differ in terms of description of development and location within the appeal site; however, the main issues remain the same for both appeals. I have considered each proposal on its individual merits. However, to avoid duplication I have dealt with the two schemes together, except where otherwise indicated.
At the time of my visit, I observed both proposals to be at an advanced stage of construction.
Dartford Borough Council adopted The Dartford Plan (DP) on 22 April 2024 after its refusal of planning permission. The DP replaces the [name] 2011 and the Adopted Dartford Development Policies Plan 2017. Appeal Decisions APP/T2215/D/23/3328597 & APP/T2215/D/23/3328598 In these circumstances, I am required to determine the appeal against the current development plan for the area at the time of my Decision. The appellant and Council were invited to make comments on the relevant policies of the DP policies, and I have taken these comments into account in reaching my decision.
Since the submission of the appeal a revised National Planning Policy Framework (the Framework) was published in December 2023. Those parts of the Framework most relevant to this appeal have not been amended. As a result, I have not sought further submissions on the revised Framework, and I am satisfied that no party’s interests have been prejudiced by taking this approach.
Section 04
[name]
The main issue are: i) whether the development would constitute inappropriate development in the Green Belt having regard to the Framework and relevant development plan policies; ii) the effect on the openness of the Green Belt; iii) the effect on the character and appearance of the surrounding area; and iv) if it is inappropriate development, whether the harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, including the ‘fallback’ so as to amount to the very special circumstances necessary to justify it.
Section 05
Whether inappropriate development
The Framework sets out that the Green Belt serves 5 purposes with its fundamental aim to prevent urban sprawl by keeping land permanently open; the essential characteristics of Green Belts being their openness and permanence. The Framework states that the construction of new buildings should be regarded as inappropriate development in the Green Belt, save for certain exceptions.
Policy M12 of the DP broadly complies with the Framework and collectively state that and its essential characteristics are its openness and permanence. Inappropriate development in the Green Belt will be resisted in accordance with national planning policy. Inappropriate development is by definition harmful to the Green Belt and will only be approved in very special circumstances. Very special circumstances will not exist unless potential harm to the Green Belt by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations.
Paragraph 154 of the Framework allows the extension or alteration of a building provided it does not result in disproportionate additions over and above the size of the original building. The proposed summerhouse is approximately 28 metres (m) away from the house and the pool building in the region of 30m from the existing house. On account of the position of both structures and distance from the host property I do not consider it is reasonable to regard either of the proposed buildings as an extension to the Appeal Decisions APP/T2215/D/23/3328597 & APP/T2215/D/23/3328598 host property. The proposed development would not conform with any of the other exceptions set out in paragraph 154 of the Framework.
Accordingly, the proposal would comprise inappropriate development in the Green Belt, contrary to Policy M12 of the DP and the Framework.
Section 06
Openness
The Framework defines one of the essential characteristics of the Green Belt to be its openness. There is no formal definition of openness but, in the context of the Green Belt, it is generally held to refer to an absence of development. Openness has both a spatial (physical) dimension, and a visual aspect.
In spatial terms the proposed development would lead to a loss of openness. I appreciate that available views of the development would be very localised and limited due to heavily landscaped boundaries. Nevertheless, the development would cause some, albeit very limited, harm to the openness of the Green Belt in both spatial and visual terms.
Section 07
Character and appearance
The proposed development would be positioned on a relatively level part of the garden which is heavily landscaped to its boundaries. The proposed structures would be single storey in height.
The proposed summerhouse would be positioned close to the shared boundary whereas the proposed pool building would be set in from the boundaries of the site. In both cases the proposed buildings would be largely screened from view by extensive landscaping and accordingly the proposed development would not be visually intrusive to the semi-rural character of the surrounding area.
The proposals would be of high-quality design and external finish. Given the extensive size of the plot the buildings, when viewed either individually or cumulatively, would not result in an over-development of the appeal site.
Section 08
[name]
The Framework states that inappropriate development should not be approved except in very special circumstances. These circumstances will not exist unless the development’s harm to the Green Belt by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations. In this regard the appellants have referred me to their fallback position.
My attention has been drawn to the planning history of the site, including the Lawful Development Certificate1 (LDC) for the erection of two outbuildings. One to be located adjacent to the southern boundary to be used as a summerhouse for storing garden equipment; the other more centrally located to be a new pool building containing a swimming pool and gym. I have been provided with a copy of the Council’s Decision Notice and the drawings which are referenced on the Decision Notice.
Both buildings are at an advanced stage of construction. From the evidence before me the ridge height of the summerhouse is 4.7m which exceeds the 1 (18/01273) dated 10 January 2019 Appeal Decisions APP/T2215/D/23/3328597 & APP/T2215/D/23/3328598 maximum ridge height of 4m permitted within the parameters of the LDC. Similarly, the ridge height of proposed pool building was constructed in excess of 4m in height, standing at 4.95m. It is a significant material consideration that the two buildings would be permitted development if they were constructed to 4m in height.
The Council has concerns regarding site levels. However, the appellant states that the original ground levels have been reinstated. Nevertheless, there is no substantive evidence before me, in the form of a topographical survey, to indicate how ground levels may differ or what they were prior to development commencing, and at the time the LDC was granted. Even so, having regard to the design, siting and locational context of the appeal site, the difference between the LDC scheme and the proposal before me is limited in terms of their impact on openness. Consequently, the proposals would not result in material harm to the openness of the Green Belt when compared to the fallback position.
For the reasons stated above, I consider the fallback position to be a material consideration of significant weight in this case, and in the overall Green Belt balance.
Section 09
Green Belt Balance and Conclusion
Having regard to the development plan and national planning policy, the proposal comprises inappropriate development in the Green Belt. There would also be harm arising from the proposal on the openness of the Green Belt. However, for the above, reasons, I consider that the fallback scheme to be an other consideration of sufficient weight to clearly outweigh the substantial harm to the Green Belt by reason of inappropriateness and any other harm. Thus, very special circumstances necessary to justify the development proposed have been demonstrated.
Accordingly, whilst there would be conflict with Policy M12 of the DP, having regard to paragraph 153 of the Framework, the balance of the considerations in this case means the appeals should succeed.
For the above reasons, I conclude that both Appeal A and Appeal B are allowed.
Section 10
Conditions
Given the advanced stage of construction it is not necessary to impose a condition relating to the commencement of development. For certainty a condition is required to ensure the development is completed in accordance with the approved plans.
Section 11
Appeal A - Schedule of Conditions
The development hereby permitted shall be carried out in accordance with the following approved plans: A(0)101 rev A existing site plan and block plan, 210704-B 001 rev B, 210704-B 005 rev C, 210704-B 002 rev C, 210704-B 005 rev D. ***End of Schedule***
Section 12
Appeal B Schedule of Conditions
The development hereby permitted shall be carried out in accordance with the following approved plans: A(0)101 rev A, 210704-B 001 rev B, 2010704- B 003 rev B, 210704-B 004 rev B, 210704-B 005 rev D. ***End of Schedule***
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4617No official casework-database value to compare
- Extracted decision date · page 1
- 4 June 2024Matches the official casework database
- Extracted site visit dates
- 8 May 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3328597
- Application reference
- 22/01325
- Lead case reference
- Not recorded
- Planning authority
- Dartford Borough Council
- Planning authority code
- E07000107
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Lead
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 30 August 2023
- Valid date
- 30 August 2023
- Start date
- 28 November 2023
- Planning authority decision date
- 27 June 2023
- Appeal decision date
- 4 June 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 51936
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21