Appeal 3328833
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as the “Demolition of existing wall fronting the highway and replacement with a new 6ft high brick wall with wrought iron railing, pedestrian gate and vehicle gate infill between pillars. Lower wall sections to receive decorative brick bonds under coping stones and pillars to also be finished with decorative sandstone coping. Existing fence along the boundary with [address] to butt up to new brick piers and 3ft fence panel / posts to be replaced with new 6ft fence panels/posts. New brick pillar adjacent to [address] to butt up to the end of the wall that runs along the boundary.”
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issues are the effect of the proposal on highway safety and on the natural environment.
Section 04
Highway safety
[address] North is a classified road, the A6, and carries around twenty-thousand vehicles per-day through Stockport. It is clearly well-used, carrying an obviously significant amount of traffic even during non-peak hours. The presence of bus, taxi and cycle lanes, in operation during long morning and afternoon periods further highlights how busy the road is.
The appellant suggests that even if they were to move their gates further back as suggested by the Council, larger vehicles may still temporarily obstruct the highway when waiting to open the gates. I accept this. Such disruption would however be infrequent when compared to the day-to-day comings-and-goings of the occupiers. As such, it is to my mind entirely appropriate to ensure that there is sufficient space for a car to stop short of the gates, but off the highway to operate the gates, particularly given the amount of traffic on the road.
[name] acknowledge the case put by the appellant, the position of the Highway Authority is clear, in that a situation where vehicles stop on the highway is unacceptable and would put the safety and operation of the A6 and its users at risk. There is nothing in the evidence before me which suggests that the proposal would not give rise to such risk. In particular, I cannot be certain that vehicles accessing the site would cross the footway at an angle to clear the highway as shown on the plans. I acknowledge the intention to use electric gates, but do not consider that their use could appropriately be controlled or enforced through the use of planning conditions, such that it would overcome my concerns and those of the Highway Authority.
Whilst the appellant has noted that the distance from the road to the gate sought by the Highway Authority is not set down in policy, it is clearly based on technical reasoning and a legitimately held concern over highway safety. Highway safety effects do find expression in the development plan, with policy seeking to avoid development with any adverse impact on safety, and that development provides safe, practical and well-designed access arrangements. I cannot be sure that the appeal proposal does all of this.
I note the gates on other driveways nearby referred to by the appellant. Consistency in the planning process is important and like cases should be decided in a like manner, however, I do not have information before me to know how, when or why those driveway arrangements came into being. Given that those driveways and gates also have a different relationship to junctions and the surrounding highway, I also have not been presented with sufficient evidence to show that their existence should alter my conclusions on this proposal.
As such, I find that the proposal would cause harm to highway safety and would therefore conflict with Policy T-3 of the [name], March 2011 (the [name]) and national policy in the National Planning Policy Framework (the Framework) which seeks to ensure highway safety in the promotion of sustainable transport.
Section 05
Natural environment
Following the Council’s decision on the application, the appellant removed the trees and hedging on their site to which the second reason for refusal referred. However, it is clear from the comments of the Council’s Senior Arboriculture and [name] that their concerns also relate to trees on the neighbouring site. As such, this matter remains a main issue in this appeal. Although the loss of trees on the site can no longer be prevented, it appears that the issue of the effect of the proposal on trees in neighbouring properties could be addressed and mitigated against through the imposition of conditions.
As such, although the uncontrolled loss of the trees and hedging on the site will undoubtedly have caused some harm to the natural environment, it appears that the effect of the development on what remains could be controlled such that it would not cause further harm. In that respect the proposal would not conflict with policies CS-8, SIE-1 and SIE-3 of the [name], or saved policies NE1.1, NE1.2 and NE1.3 of Stockport's Unitary Development Plan adopted May 2006. These seek, amongst other things, to protect the natural environment and biodiversity.
Section 06
Other Matters
The appellant has set out the need for the proposal on the grounds of safety, security and privacy. I do not seek to suggest that any of these factors are not material to my decision, or that they are unimportant. However, I am not persuaded that the appeal proposal is the only way to achieve them. In this, I also note that the local planning authority did suggest further amendments to the proposal which could address their concerns.
Section 07
Conclusion
For the reasons given above I conclude that the proposal conflicts with the development plan with regard to its effect on highway safety. Whilst it could be acceptable with regard to the natural environment, I find that the highway safety harm is so significant that it is not outweighed. There are no other material considerations of such weight to indicate that a decision be taken other than in accordance with the development plan.
The appeal should therefore be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 224No official casework-database value to compare
- Extracted decision date · page 1
- 28 February 2024Matches the official casework database
- Extracted site visit dates
- 20 February 2024 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3328833
- Application reference
- DC/088559
- Lead case reference
- Not recorded
- Planning authority
- Stockport Metropolitan Borough Council
- Planning authority code
- E08000007
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 4 September 2023
- Valid date
- 4 September 2023
- Start date
- 24 November 2023
- Planning authority decision date
- 27 July 2023
- Appeal decision date
- 28 February 2024
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 47294
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:27
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21